Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Heatherview Road, Pontypridd - Temporary Road Closure To Renew A Leaking Communication Pipe
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(HEOL TREM Y GRUG, PONTYPRIDD)
GORCHYMYN (CAU FFORDD DROS DRO) 2026
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf 7 diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y'i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau'r ffordd er mwyn adnewyddu pibell gyswllt sy’n gollwng.
Effaith y Gorchymyn fydd cau Heol Trem y Grug, Pontypridd – o ffin de-orllewinol Rhif 7 Heol Trem y Grug, y gyfeiriad y dwyrain am bellter o tua 22 metr.
Yn anffodus, fydd dim llwybr amgen ar gael yn ystod y cyfnod yma.
Bydd mynediad ar gael i gerbydau’r gwasanaethau brys, i gerddwyr, bysiau, coetsis ac ar gyfer cyrraedd eiddo.
Mae disgwyl i'r ffyrdd fod ar gau rhwng y dyddiadau ac amseroedd canlynol neu hyd nes y bydd y gwaith wedi'i gwblhau:-
• Cau’r ffordd yn gyfan gwbl rhwng 30 Tachwedd a 2 Rhagfyr 2026
Dyddiad 12 Hydref 2026
Andrew Wilkins
Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol
2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(HEATHERVIEW ROAD, PONTYPRIDD)
(TEMPORARY ROAD CLOSURE) ORDER 2026
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council, intends, not less than 7 days from the date of this Notice, to make an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to facilitate works to renew a leaking communication pipe.
The effect of the Order will be to close Heatherview Road, Pontypridd – from the south-western boundary of No.7 Heatherview Road, extending in an easterly direction for approximately 22 metres.
Unfortunately, there is no alternative route available for this closure.
Access will be maintained for emergency services, pedestrians, buses, coaches, public transport and to premises.
The closure is expected to be in operation between the following dates and times, or until such time as the works has been completed: -
• Full Closure 30th November – 2nd December 2026
Dated 12 October 2026
Andrew Wilkins
Director of Legal and Democratic Services
2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: