Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Ladywood - Temporary Prohibition Of Through Traffic To Frankfurt Christmas Market
What is happening?
BIRMINGHAM CITY COUNCIL
ROAD TRAFFIC REGULATION ACT 1984 (AS AMENDED) SECTION 14(2)
(FRANKFURT CHRISTMAS MARKET, LADYWOOD)
(TEMPORARY PROHIBITION OF THROUGH TRAFFIC ETC) ORDER 2026
NOTICE is hereby given that Birmingham City Council intend, not less than seven days from the date of this Notice, to make an Order the effect of which will be to prohibit any vehicle to proceed along
• High Street (Carrs Lane to New Street)
• New Street (whole length)
• Temple Street (whole length)
• Bennetts Hill (New Street to Waterloo Street)
• Colmore Row (Bennetts Hill to Waterloo Street)
• Waterloo Street (Colmore Row to Bennetts Hill)
• Victoria Square (whole area)
• Lower Temple Street (whole length)
• Ethel Street (whole length)
• Hill Street (Swallow Street to Victoria Square)
• Chamberlain Square (whole area)
• Cannon Street (Fore Street to New Street)
• Temple Passage (whole length)
• Union Street (Union Passage to High Street)
• Paradise Street
• Eden Place (whole street)
The temporary prohibition of through traffic Suspension of One-way system, no stopping, no waiting and no loading along with the suspension of the Tram only and creation of a Tram and Authorised vehicles restriction to facilitate the deployment of infrastructure to ensure pedestrian safety whilst a street market takes place and to facilitate the construction and removal of market infrastructure.
An alternative route for vehicles affected by this Order will be signed on site and access to frontages will be maintained as necessary.
These prohibitions shall apply only during such times and to such extent as shall from time to time be indicated by traffic signs prescribed by The Traffic Signs Regulations and General Directions 2016.
The Order will come into operation on Sunday 1st November 2026 and will remain in force for a period of 12 weeks or until the works are completed whichever is the earlier.
Phil Edwards, Director – Infrastructure and Sustainability, Birmingham City Council, Council House, 1 Victoria Square, B1 1BB
www.birmingham.gov.uk, Dated 14th October 2026
Need to publish a public notice?
If you need to publish a public notice, please contact Birmingham Mail directly at: