Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Ty Mawr Footbridge, Hirwaun - Temporary Footpath Closure For Public Safety
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(PONT DROED TŶ MAWR, HIRWAUN)
GORCHYMYN (CAU DROS DRO) 2026
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf saith diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14(1) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, a fydd yn para chwe mis ar y mwyaf. Mae angen cau'r llwybr troed yma er diogelwch y cyhoedd.
Effaith y Gorchymyn fydd cau'r rhan ganlynol o'r llwybr am gyfnod dros dro:
Cau Llwybr Troed
Llwybr Troed 10 Hirwaun – y bont droed sy’n croesi’r Afon Cynon, y cyfeirir ati fel Pont Droed Tŷ Mawr, sydd wedi’i lleoli yn y gyfeiriad what3words ///divided.briskly.outbursts neu Gyfeirnod Grid Cenedlaethol SN9572805774
Llwybr Amgen – rydyn ni’n cynghori cerddwyr i ddefnyddio rhwydwaith presennol y priffyrdd.
Fydd DIM mynediad ar gyfer cerbydau'r gwasanaethau brys.
Rydyn ni'n disgwyl i'r llwybr fod ar gau yn ystod y dyddiadau canlynol, neu nes bydd y gwaith wedi'i gwblhau:-
• O 18 Hydref 2026 am 6 mis
Dyddiad 6 Hydref 2026
Andrew Wilkins
Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol
2 Llys Cadwyn, Stryd y Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(TY MAWR FOOTBRIDGE, HIRWAUN)
(TEMPORARY CLOSURE) ORDER 2026
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council intends not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 which will have a maximum duration of six months.
The closure is necessary in the interest of public safety.
The effect of the Order will be to temporarily close the following section of path:-
Footpath Closure
Footpath 10 Hirwaun – footbridge crossing the River Cynon, known as Ty Mawr Footbridge, located at what3words ///divided.briskly.outbursts or National Grid Reference SN9572805774
Alternative Route – pedestrians are advised to use the existing highway network.
Access for emergency services WILL NOT be maintained.
The closure is expected to be in operation during the following dates, or until such time as the works have been completed: -
• From 18th October 2026 for 6 months
Dated 6th October 2026
Andrew Wilkins
Director of Legal and Democratic Services
2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: