Norfolk - Multiple Temporary Traffic Regulation Orders
What is happening?
Norfolk County Council
TEMPORARY TRAFFIC REGULATION ORDERS 2026
Road Traffic Regulation Act 1984
Norfolk County Council in exercise of its powers under Section 14(1) of the Road Traffic Regulation Act 1984, hereby give notice that:
(i) THEY PROPOSE TO MAKE Temporary Traffic Regulation Orders in respect of the following roads:
AYLSHAM – U57035 Market Place from 37m north of C286 Penfold Street for 12m northwards (including ten parking spaces) to facilitate gas works from 6th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: N/A. The works promoter is Cadent.
BLAKENEY – High Street from 150m northwest of its junction with A149 New Road for 30m north-westwards to facilitate water communication pipe repair works from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: High Street, Back Lane, The Quay, Westgate Street, A149 New Road. The works promoter is Anglian Water.
BRUNDALL – Chancel Close from its junction with The Street for 140m southwards to facilitate duct works between 09:30 and 15:30 from 5th to 6th October 2026 (may continue until 17th November 2026). Alternative route is via: N/A. The works promoter is BT. NB: Plates will be put down for residents.
BURGH CASTLE – Mill Road from its junction with Market Road for 95m southwards to facilitate pole testing works between 09:30 and 15:30 on 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Mill Road, High Road, Butt Lane. The works promoter is BT.
BURGH CASTLE – Mill Road from 230m northeast of its junction with Butt Lane for 40m north-eastwards to facilitate pole testing works between 09:30 and 15:30 on 6th October 2026 (may continue until 17th November 2026). Alternative route is via: Butt Lane, High Road, Mill Road. The works promoter is BT.
CAISTER-ON-SEA – A) C483 Norwich Road from its junction with A149 Caister Bypass for 170m eastwards and B) U62235 Prince of Wales Road from its junction with C483 Norwich Road for 5m northwards to facilitate Section 278 works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: A) A149 Caister Bypass, Yarmouth Road, High Street, Norwich Road. B) Prince of Wales Road, Jack Chase Way. The works promoter is Bateman Groundworks Ltd.
CANTLEY, LIMPENHOE AND SOUTHWOOD, AND REEDHAM – U59302 Norwich Road from its junction with C875 Freethorpe Road for 1160m westwards to facilitate new duct with cab and chamber installation works from 5th to 23rd October 2026 (may continue until 4th December 2026). Alternative route is via: Freethorpe Road, Church Road, Cantley Road, Limpenhoe Road, Hall Road, Cow Meadow Road, Grove Road, The Common, Chapelfield, The Green, Reedham Road (Freethorpe, Cantley, Limpenhoe and Southwood, Reedham). The works promoter is CityFibre Metro Networks.
COLTISHALL – A) U57134 Rectory Road from its junction with U57135 Westbourne Road for 30m northwards, B) U57135 Westbourne Road from its junction with U57134 Rectory Road for 30m north-westwards and C) U57134 Rectory Road from 30m north of its junction with U57135 Westbourne Road to its junction with U57129 The Hill to facilitate manhole cover repair works. Roads A-B will be temporarily closed (except for pedestrian access) and Road C shall be temporarily subject to the suspension of the one-way system (northbound) to allow vehicles to travel in both a northerly and southerly direction, on 5th October 2026 (may continue until 16th November 2026). Alternative route is via: B1150 North Walsham Road/Station Road/High Street, B1354 Church Street, Rectory Road. The works promoter is Norfolk County Council.
COLTISHALL – A) C275 Great Hautbois Road from 40m north of its junction U57137 Frogge Lane for 130m southwards and B) U57137 Frogge Lane from its junction with C275 Great Hautbois Road for 40m eastwards to facilitate overhead cabling works between 09:30 and 15:30 on 8th October 2026 (may continue until 19th November 2026). Alternative route is via: A) Great Hautbois Road, Little Hautbois Road, Hautbois Road, Scottow Road, B1150 North Walsham Road/Church Street/Station Road, Great Hautbois Road. B) Great Hautbois Road, Seven Acres Lane, Frogge Lane. The works promoter is Openreach.
CROMER – The Croft from 90m south of its junction with A149 Louden Road for 35m south-eastwards to facilitate new electrical connection works from 5th to 13th October 2026 (may continue until 24th November 2026). Alternative route is via: The Croft, A149 Louden Road/Prince of Wales Road/Hamilton Road/Church Street/Norwich Road, Vicarage Road, Colne Road. The works promoter is UK Power Distribution.
CROMER – A) Northrepps Road from its junction with C634 Overstrand Road for 200m southwards and B) Park Road from its junction with Northrepps Road for 40m westwards to facilitate new sewer connection works from 7th to 23rd October 2026 (may continue until 4th December 2026). Alternative route is via: A) Northrepps Road, Cromer Road, Nut Lane, Church Street, Bulls Row, Hungry Hill, Southrepps Road, Mundesley Road, Overstrand Road. B) Station Road, Overstrand Road (Overstrand, Sidestrand, Northrepps, Cromer). The works promoter is Norfolk County Council.
DRAYTON – Footpath From A1067 To Linked Footway Lodge Breck from its joining with A1067 Drayton High Road for 25m south-westwards to facilitate new electrical connection works between 08:00 and 18:00 from 6th to 10th October 2026 (may continue until 21st November 2026). Alternative route is via: A1067 Drayton High Road, Lodge Breck. The works promoter is UK Power Distribution.
EAST RUSTON – C411 Pound Road from its junction with B1159 Stalham Road to its junction with U19148 Larkeys Lane to facilitate pole testing works between 09:30 and 15:30 on 6th October 2026 (may continue until 17th November 2026). Alternative route is via: Pound Road, B1159 Stalham Road, North Walsham Road, Happisburgh Road, North Walsham Road, Kitlings Beck Road, North Walsham Road, East Ruston Road, School Road, Pound Road (Witton, Honing, Walcott, East Ruston). The works promoter is Openreach.
EAST RUSTON – C411 Vicarage Road from its junction with B1159 Stalham Road for 400m eastwards to facilitate pole testing works between 09:30 and 15:30 on 6th October 2026 (may continue until 17th November 2026). Alternative route is via: B1159 Stalham Road, North Walsham Road, The Street, Whimpwell Street, Coronation Road, Coronation Close, The Common, Vicarage Road (Happisburgh, Walcott, East Ruston). The works promoter is Openreach.
GORLESTON-ON-SEA – Cliff Hill from 45m northeast of its junction with Springfield Road for 20m north-eastwards to facilitate new water service works from 5th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Upper Cliff Road, Bells Road, Springfield Road. The works promoter is Essex & Suffolk Water.
GREAT YARMOUTH – Sidegate Road from its junction with Bridge Road for 30m northwards to facilitate gas excavation works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Bridge Road, Acle New Road, A47 Roundabout, Runham Road, North River Road. The works promoter is Cadent.
HAPPISBURGH AND EAST RUSTON – C411 Vicarage Road/The Common from its junction with U19001 Church Farm Road for 275m eastwards to facilitate pole testing works between 09:30 and 15:30 on 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Vicarage Road, B1159 Stalham Road, North Walsham Road, The Street, Whimpwell Street, Coronation Road, Coronation Close, The Common, Short Lane, Grub Street (Walcott, Happisburgh, East Ruston). The works promoter is Openreach.
HEMSBY – C454 Waters Lane from 65m west of its junction with U69379 The Street for 25m westwards to facilitate new electricity supply works from 5th to 11th October 2026 (may continue until 22nd November 2026). Alternative route is via: Waters Lane, Martham Road, North Road, The Street. The works promoter is UK Power Networks.
HOLT – Mill Street from 30m east of its northernmost junction with Albert Street for 30m southwards to facilitate water meter exchange works between 08:00 and 16:00 on 5th October 2026 (may continue until 16th November 2026). Alternative route is via: Mill Street, New Street, Cross Street, Albert Street. The works promoter is Anglian Water.
HOLT – Cromer Road from its junction with Eccles Road for 30m westwards to facilitate electrical works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Cromer Road, A148 Holt Bypass, Station Road, Market Place, White Lion Street (High Kelling, Holt). The works promoter is UK Power Distribution.
HORNING – C401 Lower Street from 10m northwest of its junction with U19118 Mill Loke for 25m south-eastwards to facilitate switchgear/transformer removal and replacement works on 6th October 2026 (may continue until 17th November 2026). Alternative route is via: Lower Street, A1062 Ropes Hill/Norwich Road/Upper Street, Grove Road, School Road, Lower Street. The works promoter is UK Power Networks.
KNAPTON – B1145 Mundesley Road/North Walsham Road from its junction with C426 Knapton Green for 1280m southwards to facilitate overhead cabling works from 5th to 6th October 2026 (may continue until 17th November 2026). Alternative route is via: B1145 Knapton Road, The Street, B1145 North Walsham Bypass, A149 Norwich Road/Wayford Road, B1159 Stepping Stone Lane/Stalham Road/Coast Road, Walcott Road, C634 Paston Road/Bacton Road/Mundesley Road, Stow Hill, C635 Water Lane (East Ruston, Stalham, Dilham, Swafield, Paston, Smallburgh, Bacton, Brumstead, Mundesley, Worstead, Walcott, North Walsham, Knapton). The works promoter is BT.
LANGHAM – A) Holt Road from its junction with B1156 Langham Road to its junction with Field Dalling Road and B) Hollow Lane from its junction with Holt Road to its junction with Swans Close to facilitate chamber, cover and frame replacement works from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: A) Field Dalling Road, Langham Road, Bale Road, Gunthorpe Road, Holt Road, Brinton Road, Smokers Hole. B) Hollow Lane, Field Dalling Road (Gunthorpe, Field Dalling, Blakeney, Brinton, Langham). The works promoter is Anglian Water.
LINGWOOD AND BURLINGHAM – Chapel Road from its junction with Norwich Road for 610m northwards to facilitate duct installation works from 6th to 23rd October 2026 (may continue until 4th December 2026). Alternative route is via: Chapel Road, Blofield Road, Heater Lane, Lingwood Road, Church Road, School Road, Station Road, Norwich Road. The works promoter is CityFibre Metro Networks.
NORTH WALSHAM – C636 Bacton Road from its junction with U19662 Little London Road for 250m south-westwards to facilitate pole testing works between 09:30 and 15:30 on 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Bacton Road, North Walsham Road, Pollard Street, North Walsham Road, B1159 Walcott Road/Coast Road/Stalham Road/Stepping Stone Lane, A149 Wayford Road/Norwich Road/Yarmouth Road/North Walsham Bypass, B1145 North Walsham Bypass, Lyngate Road, Mundesley Road, Crow Road, Bacton Road (East Ruston, Witton, Stalham, Dilham, Paston, Smallburgh, Bacton, Brumstead, Worstead, Walcott, North Walsham). The works promoter is Openreach.
ORMESBY ST. MARGARET WITH SCRATBY – C460 Station Road from 40m east of its junction with U69380 North Road for 740m eastwards to facilitate new duct and chamber installation works from 5th to 23rd October 2026 (may continue until 4th December 2026). Alternative route is via: Station Road, North Road, Yarmouth Road, Scratby Road, Station Road. The works promoter is CityFibre Metro Networks.
REEPHAM – C260 New Road from its junction with Ollands Road for 360m south-eastwards to facilitate new duct, cab and chamber installation works from 9th to 22nd October 2026 (may continue until 3rd December 2026). Alternative route is via: Norwich Road, Church Hill, Market Place, Station Road. The works promoter is CityFibre Metro Networks.
ROLLESBY – U69331 Court Road from 80m west of its junction with A149 Main Road for 60m westwards to facilitate new duct and chamber installation works from 5th to 13th October 2026 (may continue until 24th November 2026). Alternative route is via: Court Road, A149 Main Road, Fleggburgh Road, Court Road. The works promoter is CityFibre Metro Networks.
RUNTON – A149 High Street from 69m east of its junction with Beach Road to its junction with Felbrigg Road to facilitate blockage clearance works between 19:00 and 05:00 from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: A149 Cromer Road/Runton Road/Prince of Wales Road/Hamilton Road/Church Street/Mount Street/Louden Road, A148 West Street/Holt Road, A1082 Holway Road, A149 Cromer Road/High Street (Sheringham, East Beckham, Cromer, Aylmerton, Upper Sheringham, Felbrigg, Beeston Regis, Runton). The works promoter is BT.
SALLE – Wood Dalling Road from its junction with The Street for 236m southwards to facilitate carriageway patching repair works from 5th to 6th October 2026 (may continue until 17th November 2026). Alternative route is via: Reepham Road, Briston Road, Heydon Road, The Street, Cawston Road, Wood Dalling Road (Reepham, Heydon, Wood Dalling, Salle). The works promoter is Norfolk County Council.
SALLE AND WOOD DALLING – Reepham Road from its junction with The Street to its junction with Crabgate Lane South to facilitate carriageway patching works on 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Reepham Road, Briston Road, Heydon Road, The Street, Cawston Road, Wood Dalling Road (Reepham, Heydon, Salle, Wood Dalling). The works promoter is Norfolk County Council.
SHERINGHAM – A) A149 Cromer Road from its junction with C507 Beeston Road for 138m westwards and B) C507 Beeston Road from its junction with A149 Cromer Road for 10m northwards to facilitate fibre blockage clearance works between 19:00 and 05:00 from 7th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: A) A149 High Street/Runton Road/Prince of Wales Road/Church Street/Mount Street/Louden Road, A148 West Street/Holt Road, A1082 Holway Road, A149 Cromer Road. B) C507 Wymondham Street, High Street, Church Street, A149 Cromer Road (Beeston Regis, Runton, Cromer, Aylmerton, East Beckham, Sheringham). The works promoter is Norfolk County Council.
SIDESTRAND – Cromer Road from 252m northwest of its junction with Starling Rise for 335m north-westwards to facilitate pole test and tree cutting works between 09:30 and 15:30 on 6th October 2026 (may continue until 17th November 2026). Alternative route is via: C634 Cromer Road/Mundesley Road/Overstrand Road, C491 Cromwell Road, A149 Norwich Road/Crossdale Street/North Walsham Road/The Green, C290 Southrepps Road/Antingham Road/Lower Street/Pit Street, C289 Gimmingham Road/Trunch Road, B1145 High Street, Back Street, Station Road, C634 Cromer Road/Church Street/Main Road (Trunch, Overstrand, Trimingham, Sidestrand, Cromer, Thorpe Market, Antingham, Mundesley, Northrepps, Gimmingham, Southrepps). The works promoter is BT.
SPIXWORTH – Rosetta Road from 80m south of its junction with Crostwick Lane for 55m southwards to facilitate manhole cover repair works on 5th October 2026 (may continue until 16th November 2026). Alternative route is via: Rosetta Road, Crostwick Lane, Buxton Road, Park Road. The works promoter is Anglian Water.
STIFFKEY – A149 Wells Road from its junction with Greenway to its junction with Bridge Street to facilitate footway works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: A149 Church Street/Morston Chase/The Street/Blakeney Road/Morston Road/New Road/Coast Road/High Street/Coast Road/Weybourne Road/The Street/Sheringham Road/Weybourne Road/Cromer Road, A1082 Holway Road, A148 Holt Road/Cromer Road/Holt Bypass/Norwich Road/Letheringsett Hill/Holt Road/Fakenham Road/Holt Road/Fakenham Bypass, B1105 Barsham Road/Wells Road/Fakenham Road, A149 Burnet Street/Church Street/Stiffkey Road/Coast Road (Stiffkey, Morston, Wiveton, Cley-Next-The-Sea, Salthouse, Kelling, Weybourne, Sheringham, Bodham, Holt, Letheringsett with Glandford, Thornage,
Brinton, Gunthorpe, Thursford, Little Snoring, Fakenham, Barsham, Walsingham, Wells-Next-The-Sea, Warham). The works promoter is Norfolk County Council.
SWAFIELD WITH BRADFIELD – B1145 The Street from its junction with Little London Road to its junction with Swafield Lane to facilitate pole test works between 09:00 and 15:00 on 7th October 2026 (may continue until 18th November 2026). Alternative route is via: B1145 Mundesley Road, C635 Water Lane, C634 Stow Hill/Mundesley Road, B1159 Paston Road/Coast Road/Walcott Road/Coast Road/Stalham Road/Stepping Stone Lane, A149 Wayford Road/Yarmouth Road/North Walsham Bypass, B1145 North Walsham Bypass (Swafield, Knapton, Mundesley, Paston, Bacton, Walcott, East Ruston, Brumstead, Stalham, Smallburgh, Dilham, Worstead, North Walsham). The works promoter is BT.
TAVERHAM – A1270 Broadland Northway from its junction with A1067 Fakenham Road to its junction with A140 Cromer Road to facilitate gulley cleaning, weed spraying and verge lowering works between 19:00 and 06:00 from 5th to 10th October 2026 (may continue until 21st November 2026). Alternative route is via: Cromer Road, Holt Road, Boundary Road, Aylsham Road, Boundary Road, Drayton High Road, Fakenham Road (Hellesdon, Horsford, Drayton, Horsham St. Faith and Newton St. Faith, Taverham, Attlebridge). The works promoter is Norfolk County Council.
WELLS-NEXT-THE-SEA – Theatre Road from its junction with Blackhorse Yard for 30m eastwards to facilitate stop tap replacement works from 6th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Theatre Road, Clubbs Lane, Mill Road, Park Road. The works promoter is Norfolk County Council.
WELLS-NEXT-THE-SEA – Wells-Next-the-Sea BR18/Plummers Hill from 40m north of its junction with Burnt Street for 40m north-eastwards to facilitate duct installation works from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Bridleway – Wells-Next-the-Sea Bridleway 18, Plummers Hill, A149 Burnt Street/Two Furlong Hill, Mill Road, Station Road, The Buttlands. Road – N/A. The works promoter is BT.
WITTON AND RIDLINGTON (NORTH WALSHAM) – A) U19178 Thatched Cottage Road from its junction with C47 Old Hall Road for 160m eastwards and B) C417 Old Hall Road from its junction with U19178 Thatched Cottage Road for 100m southwards to facilitate overhead power line and pole replacement works between 08:00 and 18:00 from 6th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Old Hall Road, Bacton Road, Well Street, Bacton Road, North Walsham Road, Old Hall Road. The works promoter is UK Power Networks.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
BRANDON PARVA, COSTON, RUNHALL AND WELBORNE – Black Horse Road from its junction with Banham Hill for 460m westwards to facilitate new water connection works from 6th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Black Horse Road, Mill Road, Norwich Road, Dereham Road, Barnham Broom Road, Rush Green, Bell Road, Runhall Road, Church Road (Barnham Broom, Brandon Parva, Coston, Runhall and Welborne, Hardingham, Kimberley and Carleton Forehoe). The works promoter is Anglian Water.
DISS – U76275 Croft Lane from 40m south of its junction with C880 Roydon Road for 40m southwards to facilitate chamber, cover and frame works from 7th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Croft Lane, A1066 Stanley Road, B1077 Denmark Street, Roydon Road. The works promoter is Anglian Water.
FRAMINGHAM EARL – U71372 St Annes Road from 78m south of its junction with C797 Long Road for 120m south-eastwards to facilitate duct works between 09:30 and 15:30 from 7th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: St Annes Road, All Saints Road, St Marys Road, Rectory Lane, Upgate, Hall Road, Long Road (Poringland, Framingham Earl). The works promoter is Openreach.
GELDESTON – The Street from its junction with U76303 Dunburgh Road for 130m westwards to facilitate carriageway patching works on 5th October 2026 (may continue until 16th November 2026). Alternative route is via: The Street, Geldeston Hill, Yarmouth Road, Old Yarmouth Road, Geldeston Road, Gillingham Road (Geldeston, Gillingham). The works promoter is Norfolk County Council.
HEDENHAM – C364 Earsham Road from its junction with B1332 Norwich Road for 480m southwards to facilitate fibre network installation works from 5th to 16th October 2026 (may continue until 27th November 2026). Alternative route is via: B1332 Norwich Road, A143 Yarmouth Road/Bungay Road/Old Railway Road, Hall Road, Earsham Road (Bungay, Earsham, Ditchingham, Hedenham). The works promoter is CityFibre.
HETHERSETT – Little Melton Road from its junction with Longview for 50m northwards to facilitate cabling works from 8th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Little Melton Road, Coachmaker Way, Baker Drive, Back Lane. The works promoter is BT.
HOCKERING – Hockering Footpath 8 from 310m east of its junction with Mattishall Lane for 44m eastwards to facilitate timber footbridge replacement works from 5th to 12th October 2026 (may continue until 23rd November 2026). Alternative route is via: N/A. The works promoter is Norfolk County Council.
MORNINGTHORPE AND FRITTON – U76025 Norwich Road from its junction with U76129 Edges Lane to its junction with U76026 Church Lane to facilitate verge repair works from 6th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: School Road, Common Lane, The Street, B1527 Hempnall Road, Brick Kiln Lane (Morningthorpe and Fritton, Long Stratton). The works promoter is Norfolk County Council.
NARBOROUGH – Narford Road from 400m west of its junction with the A47 for 100m westwards to facilitate pipe laying works from 7th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: C68 Narford Road, C573 Swaffham Road, A47, C68 Narford Road (Narford, Narborough). The works promoter is Anglian Water.
NORTON SUBCOURSE – C385 Loddon Road from its junction with U76353 Croft Road for 50m westwards to facilitate new water connection works from 6th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Loddon Road, The Street, Beccles Road, B1136 Yarmouth Road, A146 Beccles Road, Norton Road, Loddon Road. The works promoter is Anglian Water.
QUIDENHAM – Heath Road from its junction with Harling Road for 60m northwards to facilitate vegetation removal and structure examination works between 22:00 and 06:00 from 7th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: U33063 Heath Road, U33062 Eccles Heath, C155 Harling Road, U33063 Heath Road. The works promoter is Network Rail Infrastructure Ltd.
SPARHAM – C476 The Street from its junction with C216 Well Lane for 100m north-eastwards to facilitate drainage works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: C216 Church Lane, A1067 Main Road/Sparham Hill, C199 Nowhere Lane, C476 Whitwell Road and vice versa (Sparham, Great Witchingham). The works promoter is Norfolk County Council.
STOKE HOLY CROSS – C192 Stoke Lane from its junction with C192 Mill Road for 270m southwards to facilitate electrical cable and pole replacement works between 09:00 and 18:00 on 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Stoke Lane, A140 Ipswich Road, Stoke Road. The works promoter is UK Power Networks.
SWAINSTHORPE – Church Road from its junction with U78025 Swardeston Lane for 440m eastwards to facilitate frame and cover repairs from 7th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Swainsthorpe Road, Church Road, Norwich Road, Ipswich Road, Mulbarton Road, Main Road, The Common, Rectory Lane, The Warren Lane (Swainsthorpe, Mulbarton, Keswick and Intwood, Stoke Holy Cross, Swardeston, Caistor St. Edmund and Bixley). The works promoter is Anglian Water.
THETFORD – A) St Nicholas Street from its junction with London Road for 119m northwards and B) Abbey Green from its junction with St Nicholas Street for 57m westwards to facilitate electrical maintenance works from 5th to 16th October 2026 (may continue until 27th November 2026). Alternative route is via: N/A. The works promoter is UK Power Networks.
TOPCROFT – C369 Mill Road from its junction with C369 Church Road for 240m northwards to facilitate fibre network installation works from 5th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Oxnead Lane, B1527 Hempnall Road, B1332 Norwich Road, Church Road, Low Road (Topcroft, Woodton, Hempnall, Bedingham, Hedenham). The works promoter is CityFibre.
The team dealing with enquiries at Norfolk County Council is South Streetworks.
BRANCASTER AND BURNHAM NORTON – A149 Main Road from 35m west of its junction with C95 Dalegate Road for 3349m eastwards to facilitate cats eye replacement works between 19:00 and 07:00 from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Bellamys Lane, North Street, Market Place, Church Walk, Docking Road, Stanhoe Road, Burnham Road, Bircham Road, Fakenham Road, High Street, Chequers Street, Church Place, Station Road, Sandy Lane, Brancaster Road, Mill Road, Main Road (Burnham Norton, Docking, Barwick, Burnham Market, Stanhoe, Brancaster, North Creake). The works promoter is Norfolk County Council.
BURNHAM MARKET – B1155 Stanhoe Road from 35m south of its junction with C88 Docking Road for 4662m southwards to facilitate cats eye replacement works between 19:00 and 07:00 from 7th to 9th October 2026 (may continue until 20th November 2026). Alternative route is via: Docking Road, Whiteway Road, Main Road, Mill Road, Brancaster Road, Station Road, Sandy Lane, Church Place, Well Street, Chequers Street, Bircham Road, High Street, Fakenham Road, Burnham Road (Burnham Norton, Docking, Barwick, Burnham Market, Stanhoe, Brancaster, North Creake). The works promoter is Norfolk County Council.
EAST WALTON – B1153 Gayton Road from 250m north of its junction with A47 Lynn Road to its junction with C65 Walton Road to facilitate pole test works between 09:30 and 15:30 from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Gayton Road, Main Road, A47, Magpie Farm Road, Lynn Road, Norwich Road, Constitution Hill, A47, Queen Elizabeth Way, Spot Lane, East Walton Road (Gayton, North Runcton, East Winch, Pentney, Leziate, Bawsey, East Walton, Middleton). The works promoter is BT.
FELTWELL – B1112 Lodge Road from 2m west of its junction with C873 Brandon Road for 2973m westwards to facilitate cats eye replacement works between 19:00 and 17:00 from 9th to 10th October 2026 (may continue until 21st November 2026). Alternative route is via: Brandon Road, Lynn Road, Main Road, Munford Road, Bridge Street, High Street, London Road, Mile End, Road From A1065 To B1112, The Street, Road From A1065 To Norfolk County Boundary, Road To A1101, Eriswell Road, Station Road, Cowles Drove, Feltwell Road, Wilton Road, Oak Street, Lodge Road (Feltwell, Lakenheath, Brandon, Weeting-with-Broomhill, Eriswell, Hockwold-cum-Wilton). The works promoter is Norfolk County Council.
HUNSTANTON – U20032 Church Street from its junction with C481 Greevegate for 115m northwards to facilitate overhead cable replacement works between 09:00 and 16:00 on 5th October 2026 (may continue until 16th November 2026). Alternative route is via: Austin Street, Northgate, Greevegate. The works promoter is UK Power Networks.
SOUTH WOOTTON – A148 Grimston Road from its junction with A148 Wootton Road to its junction with Queen Elizabeth Way to facilitate resurfacing works between 19:30 and 23:00 from 6th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Queen Elizabeth Way, Gayton Road, Wootton Road, River Lane (Castle Rising, Bawsey, Grimston). The works promoter is Norfolk County Council.
WEST DEREHAM – C33 Ryston Road from its junction with C35 Church Road for 300m westwards to facilitate overhead cable repair works from 9th to 12th October 2026 (may continue until 23rd November 2026). Alternative route is via: Church Road, Hilgay Road, Ryston Road. The works promoter is UK Power Networks.
WEST DEREHAM – C33 The Row from 165m west of its junction with U21265 St Andrews Close for 285m westwards to facilitate overhead cable repairs between 09:00 and 16:00 from 7th to 8th October 2026 (may continue until 19th November 2026). Alternative route is via: Ryston Road, Church Road, Hilgay Road, Ryston Road. The works promoter is UK Power Networks.
WEST WALTON – U21027 Salts Road from 140m east of its junction with U21177 Mill Lane for 1500m eastwards to facilitate duct laying works from 5th to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: School Road, Lynn Road. The works promoter is BT.
The team dealing with enquiries at Norfolk County Council is West Streetworks.
(ii) THEY HAVE MADE Temporary Traffic Regulation Orders in respect of the following roads:
ACLE – The Street from its junction with Old Road for 40m northwards to facilitate duct with chamber and cab installation works from 1st to 7th October 2026 (may continue until 18th November 2026). Alternative route is via: Old Road, Bridewell Lane, The Street. The works promoter is CityFibre Metro Networks.
BACTON – C636 Bacton Road from its junction with Mill Road to its junction with The Street to facilitate pole test works between 09:30 and 15:30 on 2nd October 2026 (may continue until 13th November 2026). Alternative route is via: C636 Bacton Road/Pollard Street/North Walsham Road, B1159 Walcott Road/Coast Road/Stalham Road/Stepping Stone Lane, A149 Wayford Road/Norwich Road/Yarmouth Road, B1145 North Walsham Bypass, C636 Lyngate Road/Mundesley Road/Crow Road (East Ruston, Witton, Stalham, Dilham, Paston, Smallburgh, Bacton, Brumstead, Worstead, Walcott, North Walsham). The works promoter is BT.
BRINTON – U14127 The Street from 114m northeast of its junction with Thornage Road for 30m north-eastwards to facilitate Sharrington culvert CCTV survey works on 1st October 2026 (may continue until 12th November 2026). Alternative route is via: The Street, Thornage Road, Brinton Road, Hall Lane. The works promoter is Norfolk County Council.
CATFIELD – U19052 School Road from its junction with C405 Ludham Road for 50m north-westwards to facilitate sluice valve repair works from 29th September to 1st October 2026 (may continue until 12th November 2026). Alternative route is via: Ludham Road, The Street, Parkers Close, Church Road. The works promoter is Anglian Water.
CORPUSTY AND SAXTHORPE – The Street from 30m west of its junction with Mountains Road for 30m westwards to facilitate new service connection works between 09:30 and 15:30 on 30th September 2026 (may continue until 11th November 2026). Alternative route is via: The Street, Horseshoe Lane, Heydon Road. The works promoter is BT.
CROMER – Jetty Street from its junction with Tucker Street for 30m northwards to facilitate building maintenance and scaffolding erection works from 1st October to 6th November 2026 (may continue until 6th May 2027). Alternative route is via: Jetty Cliff, Promenade, High Street. The works promoter is BM Norfolk.
FELTHORPE – A) Bilney Lane from its junction with The Street to its junction with Church Lane, B) Church Lane from its junction with Brands Lane to its junction with Taverham Road, C) Brands Lane from its junction with Church Lane to its junction with Reepham Road, D) Hall Lane from its junction with The Street for 200m northwards and E) Mill Lane from its junction with The Street for 400m northwards to facilitate traffic signage installation works from 28th September to 16th October 2026 (may continue until 27th November 2026). Alternative route is via: A) The Street, Taverham Road, Church Lane; B) Bilney Lane, The Street, Taverham Road; C) Church Lane, Taverham Road, Reepham Road; D) N/A; E) The Street, Haveringland Road, Abbey Lane, Mill Lane (Felthorpe, Haveringland). The works promoter is Norfolk County Council.
Need to publish a public notice?