Public Notice Portal - Brought to you by Britain's Local News Media
Traffic & Roads

Try our AI Explainer

This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.

Wiltshire - Multiple Temporary Closures Due To Various Works

BA12•Published 25/09/26
Wiltshire Times • 

What is happening?

SECTION 14(1) OF THE ROAD TRAFFIC REGULATION ACT 1984

Notice is hereby given that the Wiltshire Council intends to make Orders to close temporarily to all traffic:

A) A360 (Part), West Lavington; from its junction with Duck Street to its junction with Church Street to enable Wessex Water Services to carry out repair mains leak and other associated works. Alternative route: via A360 (unaffected length) – B3086 – The Packway – A345 – A342 – A360 (unaffected length) and vice versa. Alternative route HGVs: via A360 (unaffected length) – Cheverell Road – B3098 – B3008 – The Packway – A345 – A342 – A360 (unaffected length) and vice versa. This Order will come into operation on 22 October 2026 and the closure will be required for 2 days. For further information please contact Wessex Water Services on 0345 6004600. Notice is hereby given that the Wiltshire Council has made Orders to close temporarily to all traffic:

B) Fairwood Road (Part), Dilton Marsh; from the railway bridge to its property known as No.39 Fairwood Road to enable Network Rail Infrastructure Ltd to carry out safety examination of bridge structure. No alternative route is available. This Order will come into operation on 29 September 2026 and the closure will be required between the hours of 22:00 and 06:00 for 1 night. For further information please contact Safer Roadworks on behalf of Network Rail Infrastructure Ltd on 07752 710214.

C) Rock Lane (Part), Warminster; from its junction with Boreham Road to its property known as No.01 Rock Lane to enable Openreach to carry out tree cutting and associated works. No alternative route is available. This Order will come into operation on 28 September 2026 and the closure will be required between the hours of 08:00 and 18:00 for 2 days. For further information please contact MJ Quinn on behalf of Openreach on 01515 478945.

D) B3095 (Part), Kingston Deverill; from its property known as No.63 Kingston Deverill to its property known as No.68 Kingston Deverill to enable Wessex Internet to carry out ducting and associated works. Diversion route for lights and vehicles over 7.5t. Diversion route to be symbolised hollow for clockwise diversion and for anti clockwise diversion. Alternative route clockwise light vehicles under 7.5t via B3095 (unaffected length) – A350 – B3089 – A303 – B3095 (unaffected length). Alternative route anti clockwise light vehicles under 7.5t via B3095 (unaffected length) – A303 – A350 – B3095 (unaffected length). Alternative route HGVs over 7.5t via B3095 (unaffected length) – A350 – A303 – B3095 (unaffected length) and vice versa. This Order will come into operation on 28 September 2026 and the closure will be required for 3 days. For further information please contact 4 Site Fibre on behalf of Wessex Internet on 02394 318286.

E) The Butts (Part), Bratton; from its property known as No.04 The Butts to its property known as No.06 The Butts to enable Scottish and Southern Power Distribution to carry out new connection and associated works. Alternative route via The Butts (unaffected length) – Upper Garston Lane – Combe Lane – Westbury Road – The Butts (unaffected length) and vice versa. This Order will come into operation on 28 September 2026 and the closure will be required for 5 days. For further information please contact Scottish and Southern Power Distribution on 07918 305900.

F) Greater Lane (Part), Edington; from its property known as No.15 Greater Lane for a distance of approximately 30m in a southerly direction to enable Openreach to carry out pole and associated works. Alternative route via Greater Lane (unaffected length) – B3098 – C49 – Greater Lane (unaffected length) and vice versa. This Order will come into operation on 29 September 2026 and the closure will be required between the hours of 08:00 and 18:00 for 1 day. For further information please contact Circet on behalf of Openreach on 07368977325.

G) Stibb Hill (Part), West Lavington; from its junction with Ramscliff for a distance of approximately 140m in a northerly direction to enable Openreach to provide a pole and other associated works. Alternative route via Church Street – Rutts Lane – Stibb Hill (unaffected length) and vice versa. This Order will come into operation on 28 September 2026 and the closure will be required for 1 day. For further information please contact Openreach on 0800 085 9194.

H) Dynham Lane (Part), Trowbridge; from its junction with A363 for a distance of approximately 300m in a north easterly direction to enable Mua Electricity Ltd to carry out connection and associated works. No alternative route is available. This Order which previously came into operation on 03 August 2026 will now recommence on 28 September 2026 and the closure will be required until 09 October 2026. For further information please contact Mua Electricity Ltd on 01489 535600.

I) C10 (Part), Stockton; from its property known as The Glebe to its property known as Yew Tree Cottage to enable MJ Abbott Ltd to carry out installation of 90mm and 63mm diameter water main via directional drill and associated works. Alternative route via C10 (unaffected length) – Station Road – A36 – A303 and vice versa. This Order which previously came into operation on 14 September 2026 will now recommence on 28 September 2026 and the closure will be required until 20 November 2026. For further information please contact MJ Abbott Ltd on 01722 716361.

Orders A) to G) will have a maximum duration of 18 months, Order H) and I) has a maximum duration of 18 months. The closures and diversion routes will be clearly indicated by traffic signs. It is anticipated that the works will take the stated duration to complete depending upon weather conditions. Access will be maintained for residents and businesses where possible, although delays are likely due to the nature of the works.

SECTION 14(1) OF THE ROAD TRAFFIC REGULATION ACT 1984

Notice is hereby given that the Wiltshire Council has made an Order to temporarily close to all vehicles:

A) UC 863802, Brixton Deverill; from its junction with B3095 to its junction with Bridleway 6, Brixton Deverill. And to temporarily close to all users:

B) Bridleway 6 (Part), Brixton Deverill; from its junction with UC 863802 for a distance of approximately 70m in an easterly direction to enable Wessex Internet to carry out ducting and associated works.

No alternative route is available. The closure will be clearly indicated by traffic signs. This Order will come into operation on 30 September 2026 and the closure will be required for 3 days. It is anticipated that the works will take the stated duration to complete depending upon weather conditions. Access will be maintained for residents and businesses where possible, although delays are likely due to the nature of the works. Order A) will have a maximum duration of 18 months. Order B) will have a maximum duration of 06 months. For further information please contact 4 Site Fibre on behalf of Wessex Internet on 02394 318286.

SECTION 14(1) OF THE ROAD TRAFFIC REGULATION ACT 1984

THE COUNTY OF WILTSHIRE (VARIOUS ROADS, VARIOUS PARISHES) (TEMPORARY PROHIBITION OF TRAFFIC) ORDER (No.70) 2026 (Ref TTRO: 11764)

Notice is hereby given that Wiltshire Council has made an Order to close temporarily, to all vehicles, the lengths of roads specified in the Schedule to this notice. The order is required to enable carriageway patching, surface dressing and other associated works and will be operative from the 28 September 2026 for a maximum period of 18 months. The closures are anticipated to be up for 5 days but only when traffic signs are in position and only for so long as is necessitated by the works. It is anticipated that advance signs will be deployed 2 weeks prior to the closure dates. Access will be maintained where possible although delays are likely due to the nature of the works. The closures are anticipated to take place between 28 September 2026 and 31 January 2027.

Schedule 1.

The Lagger, Corsham; from its junction with Kings Avenue to its junction with Cross Keys Road.

  1. Devizes Road (Part), Hilperton; from its junction with Trowbridge Road for its entire length.

  2. Devizes Road (Part), Hilperton; from its junction with A361 for its entire length.

  3. UC 824701, Chapmanslade; from its junction with C274 for its entire length.

  4. C227 (Part), North Bradley and Southwick; from its property known as No.15 Mead Court to its junction with C234.

  5. C234 (Part), Southwick; from its junction with C227 to its junction with A361.

  6. A350 (Part), Westbury, Upton Scudamore and Warminster; from its junction with A3098 to its junction with A36.

  7. UC 944201, Knock; from its junction with A36 for its entire length.

  8. B3414 (Part), Warminster; from its junction with Sambourne Road for a distance of approximately 555m in a north westerly direction.

  9. C362 (Part), Warminster; from its junction with Masefield Road to its junction with B3414.

  10. Marsh Street, Warminster; from its junction with Wylye Road to its junction with Fanshaw Way.

Alternative routes (vice versa).

  1. via Cross Keys Road – Kings Avenue.

    5/6. via A361 – A363 – C227 (unaffected length).

  2. via A36 – A361 – Wymsome Street – Westbury Road – A363.
  3. HGVs via A36 – A361 – A363.
  4. via B3414 (unaffected length) – A36.
  5. via B3414 – A36 – C362.
  6. via Fanshaw Way – Wylye Road.

All works will be published on Wiltshire Council website https://one.network/public when confirmed dates are known. For further information please contact Atkins on 01225 730360.

SECTION 14(1) OF THE ROAD TRAFFIC REGULATION ACT 1984

Notice is hereby given that the Wiltshire Council intends to make an Order to close temporarily to all users:

Footpath 73, Melksham Without; from its junction with West Hill to its junction with West Hill Lane to enable Wessex Water are carrying out essential works to the sewer network, comprising the relining of an existing sewer pipeline. Access to the PRoW cannot be maintained for this section of the works. Alternative route via West Hill – West Hill Lane and vice versa.

The closure and diversion route will be clearly indicated by traffic signs. This Order will come into operation on 19 October 2026 and it is anticipated that the closure will be required until 30 October 2026. Access will be maintained where possible although delays are likely due to the nature of the works. The Order will have a maximum duration of 6 months. For further information please contact Wessex Water Services Ltd on 0345 6004600 or Ben Braine, Countryside Access Officer on 07788 345979 or Wiltshire Council on 0300 456 0100.

Wiltshire Council

Need to publish a public notice?

If you need to publish a public notice, please contact Wiltshire Times directly at:

swindonbmds@newswilts.co.uk

01793 501880

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association