Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Fairoak Lane - Temporary Road Closure Due To HV Electrical Duct & Cable Works
What is happening?
ROYAL BOROUGH OF KINGSTON UPON THAMES
Road Traffic Regulation Act 1984 – Section 14(1)
1. THE COUNCIL OF THE ROYAL BOROUGH OF KINGSTON UPON THAMES hereby gives notice that in order to facilitate the installation of HV electrical ducts and cables and because these works are being executed on or near the carriageway it intends to make an Order the effect of which is summarised in paragraph 3 below.
2. The Order will come into effect on Wednesday 14th October 2026 and is expected to take 2 months to complete, however the Order will remain in force for 18 months to be re-introduced should further works be required.
3. When the works are taking place and the appropriate traffic signs are displayed the Order will temporarily prohibit all vehicular traffic including pedal cycles from entering, exiting, stopping or proceeding in B280 Fairoak Lane from Outside the Electrical Sub-station to No.45.
4. An alternative route for vehicular traffic when the prohibition is in place will be via: A243 Leatherhead Road, A243 Kingston Road, A244 Oxshott Road, A244 Leatherhead Road, A244 Warren Lane and vice versa.
5. Vehicles access to properties adjacent to the prohibited length of road will be maintained at all times insofar as access is reasonably practicable without interference with the said works.
6. The prohibitions specified above apply only during such times and to such extent as indicated by traffic signs prescribed by the Traffic Signs Regulations and General Directions 2016.
Craig Adams Head Of Shared Services,
Highways and Transport
Dated: 17th September 2026
How long will it take?
Planned start
14-Oct-2026
Estimated end
14-Dec-2026