Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Basildon - Temporary Traffic Restrictions due to Road Works
What is happening?
Essex County Council
(Various Roads, Borough of Basildon)
(Temporary Prohibition of Traffic & Temporary Introduction of a Clearway)
& (West Mayne, Basildon)
(Temporary Introduction of Banned Left Turn) (No.12)
Order 2026
Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order:
1. To temporarily close those lengths of road in the Borough of Basildon as specified in the schedule.
2. A temporary ‘No Waiting, No Loading and No Stopping’ restriction will be introduced on both sides of carriageway on the above lengths of road for the duration of the closures to facilitate the works. Signs will be installed indicating when the No Waiting restriction will be in force.
3. To temporarily introduce a banned left turn from West Mayne into A127 westbound slip road at Dunton Roundabout.
“The Essex County Council (Basildon Borough) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019” will be temporarily amended to include the temporary ‘No Waiting at Any Time’ restriction and suspend any existing parking and waiting restrictions on the above lengths of road only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 3rd September 2026 exact dates will be specified on one.network. The roads will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location, and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries, please contact our Contact Centre on 0345 603 7631.
The Order came into effect on 3rd September 2026 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
Road | Description | Alternative Route |
Southend Arterial Road Slip Road From West Mayne To A127 Westbound, Basildon | From its junction with West Mayne Roundabout to A127 a distance of approximately 310m | West Mayne Roundabout, A127 Eastbound, A126, A127 Westbound |
Southend Arterial Road, Nevendon/Ramsden Crays | From the junction with A127 off slip to A132 for a distance of approximately 2841m in westerly direction | A132, A1235, A176, A127 |
Southend Arterial Road Slip Road From A132 To A127 Westbound, Basildon | From its junction with Nevendon Roundabout to the A127 a distance of approximately 520m | A132, A1235, A176, A127 |
Southend Arterial Road Slip Road From A127 To West Mayne Eastbound, Basildon | From A127 to its junction with West Mayne Roundabout a distance of approximately 250m | A127 Eastbound, A176, A127 Westbound |
Southend Arterial Road Slip Road From West Mayne To A127 Eastbound, Basildon | From its junction with West Mayne Roundabout to A127 a distance of approximately 315m | West Mayne RAB, A127 W/B, Halfway House RAB, A127 E/B |
Southend Arterial Road Slip Road From A127 To West Mayne Westbound, Basildon | From A127 to its junction with West Mayne Roundabout a distance of approximately 290m | A127 Westbound, Halfway House Roundabout, A127 Eastbound |
DATED: 10TH SEPTEMBER 2026
Need to publish a public notice?
If you need to publish a public notice, please contact Basildon Echo directly at: