Norfolk - Multiple Traffic Notices, Temporary Traffic Regulations
What is happening?
Norfolk County Council
TEMPORARY TRAFFIC REGULATION ORDERS 2026
Road Traffic Regulation Act 1984
Norfolk County Council in exercise of its powers under Section 14(1), of the Road Traffic Regulation Act 1984, hereby give notice that:
i) THEY PROPOSE TO MAKE Temporary Traffic Regulation Orders in respect of the following roads:
ALDBOROUGH AND THURGARTON – U14306 Harmers Lane from its junction with U14392 School Road for 140m northwards to facilitate BT pole testing works between 09:30 and 15:30 on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: School Road, The Street, Sustead Road, Ringbank Lane, Harmers Lane. The works promoter is Openreach.
BECKHAM EAST AND WEST – C302 Gibbet Lane from its junction with A148 Holt Road for 440m southwards to facilitate telegraph pole testing works between 09:30 and 15:30 on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: C302 Gibbet Lane, C623 Red Barn Lane, C308 Mill Road, C301 Holt Road, C301 Church Lane, C301 Cromer Road, C301 Church Road, A148 Holt Road (East Beckham, Aylmerton, Gresham, Upper Sheringham, West Beckham, Beeston Regis). The works promoter is BT.
BLOFIELD – Woodbastwick Road from 125m south of its junction with Bullacebush Lane for 680 metres northwards to facilitate installation of new duct with cab and chamber for network infrastructure cabling works from 10th to 30th September 2026 (may continue until 11th November 2026). Alternative route is via: Woodbastwick Road, Mill Road, Pedham Road, South Walsham Road, Newport Road, A47 From Start Of Dualling West Of J B1140 To Start Of Dualling East Of Blofield, A47 From J Blofield Gt Yarmouth Road To J B1140 E, A47 From J B1140 To J Blofield Gt Yarmouth Road W, A47 From Blofield Parish Boundary To Lingwood Parish Boundary, A47 From J Blofield Gt Yarmouth Road To J A1042 Including Roundabouts W, A47 From J A1042 To J Blofield Gt Yarmouth Road Excluding Roundabouts E, Shack Lane (South Walsham, Woodbastwick, Postwick with Witton, Lingwood and Burlingham, Blofield, Hemblington). The works promoter is CityFibre Metro Networks Ltd.
_:empty]:hidden">
BRISTON – Hell Pit Lane from 26m south of its junction with High Road for 390m south-eastwards to facilitate tree cutting works between 18:00 and 23:59 on 9th September 2026 (may continue until 21st October 2026). Alternative route is via: High Road, Pack Lane, Tithe Barn Lane. The works promoter is Oakwick Utility Arborists.
BRUNDALL – Saint Laurence Avenue from 135m north of its junction with The Street for 40m northwards to facilitate new fibre connection works between 09:30 and 15:30 from 9th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Saint Laurence Avenue, The Street, Cucumber Lane. The works promoter is BT.
CANTLEY, LIMPenHOE AND SOUTHWOOD – Freethorpe Road from its junction with Norwich Road to its junction with Well Road to facilitate new duct installation works from 8th to 21st September 2026 (may continue until 2nd November 2026). Alternative route is via: Church Road, Cantley Road, Limpenhoe Road, Hall Road, Cow Meadow Road, Grove Road, The Common, Chapelfield, The Green, Reedham Road, Freethorpe Road, Norwich Road (Cantley, Limpenhoe and Southwood; Freethorpe; Reedham). The works promoter is CityFibre Metro Networks Ltd.
DUNTON, SHEREFORD AND TOFTREES – A1065 Swaffham Road from its junction with U14152 Lamb Lane to its junction with U14040 Church Lane to facilitate carriageway lining and stud replacement works between 19:00 and 05:00 from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: A1065 Swaffham Road/Fakenham Road/Castleacre Road, A47, Magpie Farm Road, Norwich Road, Constitution Hill, A47, A149 Queen Elizabeth Way, A148 Hillington Road/Creake Road, Roundabout Leading To Fakenham Bypass, A1065 Raynham Road, A148 Gravelpit Hill (Hillington, Roydon, Swaffham, Congham, Castle Rising, Wellingham, South Acre, Narford, Narborough, Weasenham All Saints, Flitcham with Appleton, North Runcton, West Rudham, East Rudham, Tattersett, East Winch, South Wootton, Pentney, Raynham, Lexham, Sporle with Palgrave, Sculthorpe, Bawsey, Newton By Castle Acre, Hempton, Weasenham St. Peter, Grimston, Middleton, Harpley, Dunton, Shereford and Toftrees). The works promoter is Norfolk County Council.
EAST RUSTON AND BRUMSTEAD AND STALHAM – B1159 Stalham Road from its junction with U19082 Long Common to its junction with B1159 Stepping Stone Lane to facilitate carriageway patching works, the Road will be temporarily subject to a 30 miles per hour speed restriction on 9th September 2026 (may continue until 21st October 2026). Alternative route is via: N/A. The works promoter is Norfolk County Council.
FLEGGBURGH – U69473 Marsh Road from 50m north of its junction with U69474 Beech Lane for 100m southwards to facilitate new duct installation works from 7th to 16th September 2026 (may continue until 28th October 2026). Alternative route is via: Beech Lane, Silver Street, Ruggs Lane, A1064 Main Road. The works promoter is CityFibre Metro Networks Ltd.
GREAT YARMOUTH – A) Suffolk Place from its junction with South Market Road for 70m south-westwards and B) Union Road from its junction with South Market Road for 40m southwards and C) South Market Road from its junction with Suffolk Place for 145m westwards to facilitate footway reconstruction works. The Roads A - B will be temporarily closed (except for pedestrian access), traffic (constituting any class of vehicle) over the Road C shall be temporarily prohibited to park, stop, load, and/or unload, and traffic (constituting any class of vehicle) over the Roads A - C shall be temporarily subject to the suspension of the prohibition of waiting restrictions from 7th September to 23rd October 2026 (may continue until 23rd April 2027). Alternative route is via: N/A. The works promoter is Norfolk County Council.
HAPPISBURGH – C643 North Walsham Road from its junction with U19098 Grub Street to its junction with U19680 Blacksmiths Lane to facilitate carriageway patching works on 9th September 2026 (may continue until 21st October 2026). Alternative route is via: North Walsham Road, B1159 Stalham Road, Vicarage Road, Happisburgh Road, The Common, Coronation Close, Coronation Road, Whimpwell Green, Whimpwell Street, The Street. North Walsham Road (East Ruston, Happisburgh, Walcott). The works promoter is Norfolk County Council.
HORSHAM AND NEWTON ST. FAITHS – Blind Lane from its junction with Old Norwich Road for 74m westwards to facilitate gas main replacement scheme works from 7th to 25th September 2026 (may continue until 6th November 2026). Alternative route is via: Old Norwich Road, Church Street, Crown Road, Back Street. The works promoter is Norfolk County Council.
ROLLESBY – U69330 Back Lane from 90m north of its junction with A149 Main Road for 215m northwards to facilitate new duct and chamber works owing to cabling for network infrastructure from 7th to 18th September 2026 (may continue until 30th October 2026). Alternative route is via: A149 Main Road, Martham Road, Back Lane. The works promoter is CityFibre Metro Networks Ltd.
RUNTON – Felbrigg Road from its junction with A149 High Street to its junction with Broomhill to facilitate carriageway patching and road marking works from 7th to 8th September 2026 (may continue until 20th October 2026). Alternative route is via: A149 High Street/Cromer Road/Runton Road/Prince Of Wales Road/Hamilton Road/Church Street/Mount Street/Louden Road, A148 West Street/Holt Road, Davey Hill, Top Common, Lower Common (Cromer, Runton, Felbrigg). The works promoter is Norfolk County Council.
SMALLBURGH, BARTON TURF AND IRSTEAD – A) U19029 Barton Road from its junction with A1151 Norwich Road to its junction with C399 Church Road and B) C401 Smallburgh Road from its junction with A1151 Norwich Road to its junction with U19042 Beeston Lane to facilitate carriageway repair works on 8th September 2026 (may continue until 20th October 2026). Alternative route is via: A) Church Road, A1151 Norwich Road.
B) A1151 Norwich Road, Stalham Road, Norwich Road, The Street, Smallburgh Road (Smallburgh, Barton Turf, Ashmanhaugh). The works promoter is Norfolk County Council.
STALHAM – U19149 Chapel Field Road from its junction with A149 Yarmouth Road for 200m southwards to facilitate carriageway patching works on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: A149 Yarmouth Road, The Staithe, Mill Road, Chapel Field Road. The works promoter is Norfolk County Council.
STRATTON STRAWLESS – Shortthorn Road from its junction with Stratton Strawless FP1 (also known locally as The Wilderness) for 100m eastwards to facilitate sewer connection construction works from 9th to 16th September 2026 (28th October 2026). Alternative route is via: Holt Road, Buxton Road, High Street, Cromer Road, Shortthorn Road (Marsham, Felthorpe, Hevingham, Cawston, Haveringland, Stratton Strawless). The works promoter is Anglian Water.
STRUMPSHAW – Wood Lane from its junction with Stone Road for 570m westwards to facilitate pole test works between 09:30 and 15:30 on 9th September 2026 (may continue until 21st October 2026). Alternative route is via: Hassingham Road, Strumpshaw Road, Buckenham Road, Norwich Road, Long Lane, Stone Road, Low Road, Wood Lane (Strumpshaw, Lingwood and Burlingham). The works promoter is BT.
SWANTON ABBOTT – C274 The Hill from its junction with U19226 Millers Lane for 80m westwards to facilitate stop tap replacements from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: The Hill, B1150 Norwich Road, Swanton Abbott Road, Aylsham Road, Felmingham Road, Swanton Abbott Road, The Hill (Swanton Abbott, Skeyton, Westwick). The works promoter is Anglian Water.
WALSINGHAM – Fakenham Road from its junction with Blind Dicks Lane to its junction with Church Street to facilitate wall repair works from 8th September to 5th October 2026 (may continue until 5th April 2027). Alternative route is via: High Street, Common Place, Holt Road, Snoring Road, Walsingham Road, Barsham Road, Water Lane, Fakenham Road (Great Snoring, Barsham, Walsingham). The works promoter is Walsingham Estates Ltd.
*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" data-turn-id-container="request-WEB:c6a02d56-686f-4302-a3b8-29471ee06944-125" data-turn="assistant" data-testid="conversation-turn-14" data-turn-id="request-WEB:c6a02d56-686f-4302-a3b8-29471ee06944-125">
WELLS-NEXT-THE-SEA – C881 The Quay from its junction with Beach Road for 30m eastwards to facilitate flood gate testing works between 05:30 and 12:30 on 8th September 2026 (may continue until 20th October 2026). Alternative route is via: C881 The Quay/Standard Road/Polka Road, A149 Church Street/Burnt Street/Two Furlong Hill/Mill Road, C881 Holkham Road/Freeman Street. The works promoter is Environment Agency.
WELLS-NEXT-THE-SEA – Market Lane from 150m south of its junction with Waveney Close for 50m south-eastwards to facilitate new water connection works from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: N/A. The works promoter is Anglian Water.
WITTON AND RIDLINGTON (NORTH WALSHAM) – C414 Hoolehouse Road from 120m south of its junction with C414 Stone Bridge Road for 50m southwards to facilitate chamber, frame and cover replacement works from 9th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Hoolehouse Road, Stone Bridge Road, Mill Common Road, Rookery Farm Road, B1159 Coast Road, North Walsham Road, Happisburgh Road, North Walsham Road, Hole House Road (Honing, Walcott, Witton and Ridlington). The works promoter is Anglian Water.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
ALDEBY – U76509 Waterheath Road from its junction with C388 Beccles Road for 100m north-westwards to facilitate kerb replacement works on 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Waterheath Road, Elms Road, Beccles Road (Toft Monks, Aldeby). The works promoter is Norfolk County Council.
BEESTON WITH BITTERING – C221 Dereham Road from its junction with C241 Back Lane to its junction with U35120 Chapel Lane to facilitate gulley replacement and pipe jetting works from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: C241 Back Lane, U35120 Chapel Lane and vice versa. The works promoter is Norfolk County Council.
BROCKDISH – C352 The Street from 160m south of its junction with C352 Mill Road for 130m southwards to facilitate pole testing works between 09:30 and 15:00 on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: The Street, Grove Road, Scole Road, A143 Scole Road, The Street. The works promoter is Openreach.
_:empty]:hidden">
CHEDGRAVE – A) C202 Langley Road from its junction with U76332 Rectory Lane for 50m northwards and B) C384 Hardley Road from its junction with C202 Langley Road for 30m eastwards to facilitate new fibre network installation works from 7th to 11th September 2026 when signed on site (may continue until 23rd October 2026). Alternative route is via: A) Langley Road, Staithe Road, Langley Green, Norwich Road, Ferry Road, The Street, Claxton Corner, Lower Road, New Inn Hill, Rookery Hill, Bramerton Lane, Rockland Road, Kirby Road, A146 Loddon Road, A146 Norwich Road, Norwich Road and B) Lower Hardley Road, Cross Stone Road, Hardley Road, Langley Street, Staithe Road, Langley Road (Framingham Pigot, Claxton, Rockland St. Mary, Trowse with Newton, Kirby Bedon, Yelverton, Langley with Hardley, Hellington, Bramerton, Ashby St. Mary, Thurton, Caistor St. Edmund and Bixley, Holverston, Carleton St. Peter, Chedgrave). The works promoter is CityFibre.
COLNEY – Hethersett Lane from its junction with Braymeadow Lane for 800m northwards to facilitate footway reconstruction works from 7th September to 24th December 2026 (may continue until 6th March 2028). Alternative route is via: Hethersett Lane, Watton Road, A47, Norwich Road, Colney Lane (Little Melton, Cringleford, Hethersett, Ketteringham, Colney). The works promoter is Norfolk County Council.
DITCHINGHAM – U76316 Drapers Lane from its junction with B1332 Norwich Road for 175m northwards to facilitate new fibre network installation works from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: Bakers Lane, Belsey Bridge Road, B1332 Norwich Road. The works promoter is CityFibre.
FRAMINGHAM PIGOT – C187 Gull Lane from its junction with A146 Loddon Road for 120m south-westwards to facilitate pothole repair works on 10th September 2026 (may continue until 22nd October 2026). Alternative route is via: Gull Lane, Hall Road, Long Road, Pigot Lane, The Street, Fox Road, A146 Loddon Road (Framingham Earl, Kirby Bedon, Framingham Pigot). The works promoter is Norfolk County Council.
GILLINGHAM – A143 Yarmouth Road from its junction with U76302 Dogs Lane to its junction with C388 Hollow Way Hill to facilitate carriageway repair works between 19:00 and 06:00 from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: A143 Yarmouth Road, Beccles Road (Toft Monks), Yarmouth Road; B1136 Loddon Road (Haddiscoe), Yarmouth Road (Raveningham), Yarmouth Road (Hales); A146 Beccles Road, Norwich Road (Stockton); A143 Norwich Road (Gillingham), Yarmouth Road (Stockton, Haddiscoe, Hales, Heckingham, Gillingham, Thurlton, Toft Monks, Raveningham). The works promoter is Norfolk County Council.
HARLING – C154 Memorial Green from its junction with B1111 Market Street for 36m northwards to facilitate footway HRA works on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: C154 Quidenham Road, C153 Road From Kenninghall To Eccles/Road From The Butts To Quidenham, C156 Kenninghall Road/King Street, B1111 Market Street, C154 White Hart Street (Quidenham, Kenninghall, Harling). The works promoter is Norfolk County Council.
KIRBY CANE AND ELLINGHAM – U71545 Old Yarmouth Road from 40m northwest of its junction with A143 Broome Bypass for 120m westwards to facilitate new electricity supply works from 7th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Old Yarmouth Road, A143 Broome Bypass, Yarmouth Road (Ditchingham, Broome, Kirby Cane and Ellingham). The works promoter is UK Power Networks.
LODDON – C395 High Bungay Road from its junction with Low Bungay Road for 75m northwards to facilitate new fibre network installation works from 7th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: High Bungay Road, High Street, Church Plain, Bridge Street, George Lane, A146 Loddon Bypass. The works promoter is CityFibre.
OLD BUCKENHAM – Fen Street from 78m northwest of its junction with Barkers Lane for 24m north-westwards to facilitate environmental sensor installation and associated pipework and cabling works from 7th to 18th September 2026 (may continue until 30th October 2026). Alternative route is via: U33083 Fen Street, C138 Hargham Road/The Green, B1077 Attleborough Road, U33083 Fen Street. The works promoter is Anglian Water.
PULHAM MARKET – U76019 Wood Lane from 469m southeast of its junction with A140 Ipswich Road for 120m south-eastwards to facilitate tree cutting and pole testing works between 09:30 and 15:30 on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: Wood Lane, A140 Ipswich Road, Tivetshall Road, Tattlepot Road, Colegate End Road, Common Road (Tivetshall, Wacton, Pulham Market). The works promoter is Openreach.
SHELTON AND HARDWICK – U76134 Primrose Lane from its junction with C359 The Common for 742m northwards to facilitate verge repair works on 9th September 2026 (may continue until 21st October 2026). Alternative route is via: Shelton Green, The Common. The works promoter is Norfolk County Council.
SPARHAM – C198 Lyng Road from 400m north of its junction with U35065 Rectory Road for 160m northwards to facilitate pole testing works between 09:30 and 15:30 on 7th September 2026 (may continue until 19th October 2026). Alternative route is via: C198 The Street/The Common, U35062 Elsing Road/Eustyweed, C212 Mill Street/Elsing Lane, A1067 Fakenham Road/Main Road, C198 Lyng Road and vice versa (Bawdeswell, Bylaugh, Lyng, Elsing, Sparham). The works promoter is BT.
STOKE HOLY CROSS – C201 Norwich Road from its junction with C187 Shotesham Road for 150m northwards to facilitate pole testing works between 09:30 and 15:00 on 10th September 2026 (may continue until 22nd October 2026). Alternative route is via: Norwich Road, Skeet’s Hill, The Street, Church Hill, The Green, Broaden Lane, The Street, B1527 Bungay Road/Hempnall Road/Short New Road/Church Road, B1332 Norwich Road/The Street, Stoke Road, Poringland Road, Long Lane (Poringland, Kirstead, Brooke, Topcroft, Woodton, Hempnall, Saxlingham Nethergate, Shotesham, Stoke Holy Cross). The works promoter is Openreach.
TOPCROFT – C369 Church Road from its junction with C368 Low Road to its junction with U76385 Rectory Road to facilitate new fibre network installation works from 7th to 16th September 2026 (may continue until 28th October 2026). Alternative route is via: Mill Road, Oxnead Lane, B1527 Hempnall Road, B1332 Norwich Road, Church Road, Low Road (Woodton, Hempnall, Bedingham, Hedenham, Topcroft). The works promoter is CityFibre.
WACTON – Wacton FP6 from its joining with U76170 Wash Lane to its joining with Wacton FP23 to facilitate bridge replacement works from 7th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: N/A. The works promoter is Norfolk County Council.
WYMONDHAM – Middleton Street from its junction with Vicar Street for 100m southwards to facilitate link box replacement works from 7th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Middleton Street, Church Street, Vicar Street. The works promoter is UK Power Networks.
The team dealing with enquiries at Norfolk County Council is South Streetworks.
BAWSEY – B1145 Lynn Road/Gayton Road from 527m east of its junction with A149 Gayton Road Roundabout (Hospital Roundabout) for 2425m eastwards to facilitate cats eyes replacement works between 19:00 and 07:00 from 10th to 12th September 2026 (may continue until 24th October 2026). Alternative route is via: Lynn Road, Gayton Road, Queen Elizabeth Way, Hillington Road, Station Road, Wheatfields, Grimston Road, Congham Road, Lime Kiln Road, Orchard Road (Hillington, Roydon, Congham, Castle Rising, Gayton, South Wootton, Leziate, Grimston, Bawsey). The works promoter is Norfolk County Council.
CRIMPLESHAM – C543 Main Road from 150m south of its junction with A1122 Downham Road for 350m south-eastwards to facilitate joint box access and cabling works between 09:30 and 15:30 on 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Main Road, Church Road, Lynn Road, Downham Road (Stradsett, West Dereham, Crimplesham). The works promoter is BT.
DOWNHAM WEST – A1122 Downham Road from 93m west of its junction with U21378 Farthing Road for 1708m south-westwards to facilitate cats eyes replacement works between 19:00 and 07:00 from 7th to 8th September 2026 (may continue until 20th October 2026). Alternative route is via: Downham Road, Outwell Road, Well Creek Road, Church Terrace, Rectory Road, Town Street, New Road, Townsend Road, Main Road, Welney Road, Wisbech Road, Main Street, Wash Road, Suspension Bridge, Bates Drove, A1101 Wisbech Road, A10 Lynn Road, Ferry Bank, A10 Southery Bypass/Lynn Road/Fordham Bypass/Downham Eastern Bypass, A1122 Southery Bypass/Western Bypass, Station Road, Bridge Road, Lady Drove (Downham, Nordelph, Denver, Downham Market, Southery, Littleport, Hilgay, Fordham, Ryston, Welney, Outwell, Upwell, Downham West). The works promoter is Norfolk County Council.
KING’S LYNN – U20609 Extons Road from 90m east of its junction with B1144 Goodwins Road for 50m eastwards to facilitate new water connection works from 9th to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: Extons Road, Tennyson Road, Avenue Road. The works promoter is Anglian Water.
NORDELPH – B1094 Silt Road from 10m south of its junction with U21242 High Street for 1023m south-westwards to facilitate cats eyes replacement works between 19:00 and 07:00 from 9th to 10th September 2026 (may continue until 22nd October 2026). Alternative route is via: Silt Road, Main Road, Townsend Road, New Road, Town Street, Rectory Road, Isle Road, Wisbech Road, Downham Road, Outwell Road (Outwell, Upwell, Nordelph). The works promoter is Norfolk County Council.
OUTWELL – A1101 from 5m east of its junction with A1101 Church Terrace for 2368m south-eastwards to facilitate cats eyes replacement works between 19:00 and 07:00 from 8th to 9th September 2026 (may continue until 21st October 2026). Alternative route is via: Wisbech Road, Church Terrace, Rectory Road, Town Street, New Road, Townsend Road, Main Road, Welney Road, Main Street, Wash Road, Suspension Bridge, Bates Drove, A1101 Wisbech Road, A10 Lynn Road, Ferry Bank, A10 Southery Bypass/Lynn Road/Fordham Bypass/Downham Eastern Bypass, A1122 Southery Bypass/Western Bypass, Station Road, Bridge Road, Lady Drove, Downham Road, Outwell Road, Pincushion Drove (Downham West, Downham, Nordelph, Denver, Downham Market, Southery, Littleport, Hilgay, Fordham, Ryston, Welney, Upwell, Outwell). The works promoter is Norfolk County Council.
STOW BARDOLPH AND WIMBOTSHAM – A) C5 Stow Bridge Road from its junction with A10 Stow Bardolph Bypass to its junction with C51 Wimbotsham Road, B) C51 Wimbotsham Road/West Way from its junction with C5 Stow Bridge Road for 1085m southwards and C) C5 Stow Bridge Road from its junction with U21530 Lynn Road for 30m eastwards to facilitate mains laying scheme works from 7th September to 29th November 2026 (may continue until 29th May 2027). Alternative route is via: A10 Stow Bardolph Bypass, Lynn Road, Broomhill, Low Road, West Way, Wimbotsham Road, Stow Bridge Road (Downham Market, Wimbotsham,
Stow Bardolph). The works promoter is Anglian Water. NB: It is anticipated that these works will take place in phases: Road A – Phase 1 is anticipated to take place from 7th September to 26th October 2026. Phase 2 is anticipated to take place from 28th September to 26th October 2026. Road B – Phase 3 is anticipated to take place from 26th October to 29th November 2026. Road C – Phase 4 is anticipated to take place from 23rd to 29th November 2026.
The team dealing with enquiries at Norfolk County Council is West Streetworks.
ii) THEY HAVE MADE Temporary Traffic Regulation Orders in respect of the following roads:
AYLSHAM – Red Lion Street from 30m south of its junction with White Hart Street to its junction with Blofields Loke to facilitate duct laying works from 2nd to 4th September 2026 (may continue until 16th October 2026). Alternative route is via: Market Place, Penfold Street, Norwich Road, Burgh Road, Buckenham Road, Sir Williams Lane, Gashouse Hill, White Hart Street, Cromer Road. The works promoter is Openreach.
BEIGHTON – Low Farm Road (also known locally as Acle Road) from its junction with Coxhill Road for 150m eastwards to facilitate carriageway resurfacing works from 1st to 2nd September 2026 (may continue until 14th October 2026). Alternative route is via: Coxhill Road, Sandy Lane, Church Hill. The works promoter is Norfolk County Council.
BEIGHTON – B1140 Coxhill Road from its junction with C446 Acle Road to its junction with C432 Southwood Road to facilitate carriageway patching taking place on Low Farm Road from 1st to 2nd September 2026 (may continue until 14th October 2026). Alternative route is via: N/A. The works promoter is Norfolk County Council.
CROMER – Hillside from 25m southwest of its junction with A149 Norwich Road for 25m south-westwards to facilitate water communication pipe repair works from 1st to 3rd September 2026 (may continue until 15th October 2026). Alternative route is via: Hillside, A149 Norwich Road. The works promoter is Anglian Water.
DRAYTON – Hall Lane from its junction with Drayton Lane to its junction with Reepham Road to facilitate kerb and bollard replacement works from 1st to 2nd September 2026 (may continue until 14th October 2026). Alternative route is via: Drayton Lane, Reepham Road (Horsford, Drayton). The works promoter is Norfolk County Council.
FAKENHAM – Valley Way from 11m south of its junction with The Ridings for 40m south-eastwards to facilitate cover replacement works on 1st September 2026 (may continue until 13th October 2026). Alternative route is via: Valley Way, Norwich Road, Warren Avenue. The works promoter is Norfolk County Council.
HONING – C413 Hall Road from 160m southwest of its junction with C416 North Walsham Road for 345m southwards to facilitate pole testing works on 1st September 2026 (may continue until 13th October 2026). Alternative route is via: North Walsham Road, Old Hall Road, Kitlings Beck Road, Broom Lane, Hall Road (Witton and Ridlington, Honing). The works promoter is Openreach.
HORSHAM AND NEWTON ST. FAITHS – Old Norwich Road from its junction with Crown Road to its junction with Blind Lane to facilitate gas main replacement works from 1st September to 5th October 2026 (may continue until 5th April 2027). Alternative route is via: Blind Lane, West Lane, West Lane Cycleway, Church Street, Crown Road. The works promoter is Cadent.
KNAPTON – Hall Lane from 340m north of its junction with North Walsham Road for 50m northwards to facilitate replacement chamber, cover and frame works from 2nd to 4th September 2026 (may continue until 16th October 2026). Alternative route is via: C421 Hall Lane, B1145 Mundesley Road/Knapton Road, C635 Water Lane, C634 Paston Road/Stow Hill/Bacton Road, C420 Paston Road, C636 North Walsham Road (Paston, Mundesley, Knapton). The works promoter is Anglian Water.
MAUTBY – C448 Low Road from 170m west of its junction with U69527 Swim Road for 755m westwards to facilitate new duct and chamber installation works from 1st to 11th September 2026 (may continue until 23rd October 2026). Alternative route is via: School Road, The Street, Mautby Lane, Swim Road. The works promoter is CityFibre Metro Networks.
SOUTH WALSHAM – C428 Burlingham Road from its junction with B1140 Chameryhall Lane for 40m southwards to facilitate new duct and chamber installation works from 3rd to 7th September 2026 (may continue until 19th October 2026). Alternative route is via: Burlingham Road, Hemblington Hall Road, Pedham Road, Plumstead Road, Scotts Corner, B1140 South Walsham Road/Chameryhall Lane (Woodbastwick, Blofield, South Walsham). The works promoter is CityFibre Metro Networks.
WALSINGHAM – Fakenham Road from its junction with Blind Dicks Lane for 40m north-westwards to facilitate stop tap replacement works from 2nd to 4th September 2026 (may continue until 16th October 2026). Alternative route is via: Fakenham Road, High Street, Friday Market Place, Station Road, Cokers Hill, Back Lane, Blind Dicks Lane. The works promoter is Anglian Water.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
BAWBURGH – U78131 Sparrows Hill from its junction with U78184 Church Street for 200m southwards to facilitate new electrical installation works from 1st to 8th September 2026 (may continue until 20th October 2026). Alternative route is via: Sparrows Hill, Bawburgh Road, Watton Road, Stocks Hill, Church Street (Great Melton, Bawburgh). The works promoter is UK Power Networks.
BILLINGFORD – B1145 Elmham Road from its junction with C219 Bintree Road for 240m westwards to facilitate pole testing works between 09:30 and 15:30 on 2nd September 2026 (may continue until 14th October 2026). Alternative route is via: B1145 The Street/Bawdeswell Road/Billingford Road, A1067 Fakenham Road/Norwich Road, B1110 Bridge Road/Broom Green/Broom Green Road/Pump Street/High Street/Dereham Road, B1145 Back Lane/Station Road/Elmham Road and vice versa (Bawdeswell, Twyford, Guist, North Elmham, Foxley, Bintree, Billingford). The works promoter is BT.
CARLETON RODE AND BANHAM – Cherry Tree Road from its junction with B1113 The Turnpike to its junction with Long Lane to facilitate JCB patching trial works from 1st to 4th September 2026 (may continue until 16th October 2026). Alternative route is via: Cherry Tree Road, Heath Road, Mile Road, Haugh Road, Castle Hill Road, B1113 King Street/Queen Street/Market Place/Norwich Road/The Turnpike (New Buckenham, Tibenham, Old Buckenham, Winfarthing, Banham, Carleton Rode). The works promoter is Norfolk County Council.
DISS – B1077 Stuston Road from its junction with A1066 Victoria Road to its junction with U71691 Trafalgar Way to facilitate footway repair works between 20:00 and 06:00 from 3rd to 4th September 2026 (may continue until 16th October 2026). Alternative route is via: A1066 Victoria Road/Diss Road, A140 Scole Stuston Bypass, A143 Bury Road, B1077 Stuston Road (Stuston, Scole, Diss). The works promoter is Norfolk County Council.
DITCHINGHAM – A) U76318 Fen Lane from its junction with B1332 Norwich Road to its junction with U76317 Pound Lane and B) U73617 Pound Lane from its junction with U76318 Fen Lane for 250m westwards to facilitate new fibre network installation works from 4th to 14th September 2026 (may continue until 26th October 2026). Alternative route is via: Earsham Road, B1332 Norwich Road (Hedenham, Ditchingham). The works promoter is CityFibre.