North Finchley - Temporary Road Closures Due To Carriageway Works
What is happening?
THE LONDON BOROUGH OF BARNET
Road Traffic Regulation Act 1984 As Amended By The Road Traffic (Temporary Restrictions) Act 1991 Section 14(1) - Temporary Road Closure Lullington Garth, N12 Area
WHEREAS the Mayor and Burgesses of THE LONDON BOROUGH OF BARNET acting by the Council of the said Borough by Ian Edser, Director of Highways and Transportation (hereinafter called ‘the Council’) being the highway authority for the affected roads in the said London Borough are satisfied that, owing to the need to facilitate planned carriageway reconstruction and resurfacing works to take place, they intend to make an Order, the effect of which will be to close roads listed on the attached Schedule, and to prohibit parking within these roads or parts of road when the closures are in place. The Order will also have the effect of closing side roads at their junctions with those roads included on the attached schedule, when appropriate.
It is anticipated that the works shall be carried out over certain periods between Friday 11th September 2026 and Monday 12th October 2026. However, the temporary prohibitions will only be enforced when indicated by the presence of appropriate signs and/or traffic cones.
The alternative route for motorists will be via Frith Lane, Dollis Road, Nether Street, Ballards Lane, Alexander Grove and vice versa.
Any vehicle parked in contravention of the provisions of this Order may be removed.
During the closures traffic and pedestrians will be diverted by appropriately signed routes. Access for residents and essential services will be maintained as far as is practicable.
Nothing in paragraphs one and two of this Notice shall apply to anything done with the permission of or at the direction of a Police Constable in uniform.
Further information may be obtained by contacting The NRSWA Team, London Borough of Barnet, Tel: 020 8359 3555.
SCHEDULE 1
|
Road |
Location |
Duration of Works |
|
Lullington Garth, N12 |
Between the common property boundaries of Nos. 1A and 1 Sussex Ring, N12 south-eastwards for a distance of 20 metres. |
Between 9:00am to 6:00pm on Friday 11th September 2026 to Monday 12th October 2026, or until works have been completed. |
|
Argyle Road, N12 |
Between its junction with the southeastern arm of Sussex Ring roundabout, south-eastwards for a distance of 95 metres. |
Between 9:00am to 6:00pm on Friday 11th September 2026 to Friday 28th September 2026 or until works have been completed. |
|
Sussex Ring (including ring roundabout), N12 |
Between its junctions with Lullington Garth, Wilmington Folland and Chanctonbury Way. |
Between 9:00am to 6:00pm on Friday 11th September 2026 to Friday 28th September 2026 or until works have been completed. |
|
Lullington Garth, N12 |
Between its junctions with Singleton Scarp and Wolstonbury. |
Between 9:00am to 6:00pm on Friday 25th September 2026 to Monday 28th September 2026 or until works have been completed. |
|
Cisbury Ring North, N12 |
Between its junction with Lullington Garth northeastwards for a distance of 10 metres. |
Between 9:00am to 6:00pm on Friday 2nd October 2026 to Monday 12th October 2026 or until works have been completed. |
|
Cisbury Ring South, N12 |
Between its junction with Lullington Garth southwestwards for a distance of 10 metres. |
Between 9:00am to 6:00pm on Friday 2nd October 2026 to Monday 12th October 2026 or until works have been completed. |
|
Rodmell Slope, N12 |
Between its junction with Lullington Garth, northwards for a distance of 10 metres. |
Between 9:00am to 6:00pm on Friday 9th October 2026 to Monday 12th October 2026 or until works have been completed. |
|
Offham Slope N12 |
Between its junction with Lullington Garth southwards for a distance of 10 metres. |
Between 9:00am to 6:00pm on Friday 9th October 2026 to Monday 12th October 2026 or until works have been completed. |
|
Lullington Garth, N12 |
Between its junction with Wolstonbury northwards for a distance of 278 metres. |
Between 9:00am to 6:00pm on Friday 11th September 2026 to Monday 12th October 2026 or until works have been completed. |
Ian Edser Director Of Highways And Transportation,
Environment Directorate, 2 Bristol Avenue, Colindale, London, NW9 4EW
Dated this 27th August 2026