Princethorpe / Kenilworth / Rowington / Leamington Spa / Whitnash / Wooton / Radford Semele / Warwick - Various Traffic Orders

CV23Published 07/08/26
Warwickshire World • 

What is happening?

Warwickshire County Council

ROAD TRAFFIC REGULATION ACT 1984

Warwickshire County Council has made the following Temporary Traffic Orders:

B4455 FOSSE WAY, PRINCETHORPE/EATHORPE

Order Effect: Road closed to vehicular traffic from the A423 Oxford Road to Penns Lane. In addition, a 40mph speed limit will be imposed from existing 40 mph (at Princethorpe Nameplate) to Penns Lane while the road is open during the day.

Reason for Order: Carriageway resurfacing and associated works, overnight 20.00hrs-06.00hrs, speed restriction for public safety.

Order Commences: 10 August 2026 for up to 18 months.

Anticipated Completion: 21 August 2026.

Access & Diversion: A423, A425, B4455 Fosse Way and vice versa.

Contractor: Balfour Beatty, Tel: 01926 245650.

WINDY ARBOUR, KENILWORTH

Order Effect: Road closed to vehicular traffic between properties number 51 and 59.

Reason for Order: To enable installation of a new water pipe.

Order Commences: 8 August 2026 for up to 18 months.

Anticipated Completion: 9 August 2026.

Access & Diversion: Windy Arbour, Whitemoor Road, Farmer Ward Road, Birches Lane and vice versa.

Contractor: Chevron TM Ltd, Tel: 0330 008 0820.

B4439 OLD WARWICK ROAD & STATION LANE, ROWINGTON

Order Effect: Roads Closed to vehicular traffic.

Reason for Order: Drainage works and associated works, 09.30hrs-15.30hrs.

Order Commences: 10 August 2026 for up to 18 months.

Anticipated Completion: 14 August 2026.

Access & Diversion: B4439 Five Ways Road, Shrewley Common, The Cumsey, Lye Green Road, The Green, A4189 Henley Road, A4189 Warwick Road, A34 High Street, A34 Birmingham Road, A34 Liveridge Hill, A34 Stratford Road, B4439 Old Warwick Road, Packwood Lane, Rising Lane, A4141 Birmingham Road, B4439 Five Ways Road and vice versa.

Contractor: Balfour Beatty, Tel: 03452 415302.

D4306 WOODCOTE ROAD, LEAMINGTON SPA

Order Effect: Road closed to vehicular traffic from A452 Kenilworth Road to College Drive.

Reason for Order: Carriageway resurfacing and associated works, 09.30hrs-15.30hrs.

Order Commences: 10 August 2026 for up to 18 months.

Anticipated Completion: 13 August 2026.

Access & Diversion: Woodcote Road, Northumberland Road, A452 Kenilworth Road and vice versa.

Contractor: Balfour Beatty, Tel: 01926 245650.

WISE STREET & WISE TERRACE, LEAMINGTON SPA

Order Effect: Roads closed to vehicular traffic along their entire lengths

Reason for Order: Drainage and associated works, 09.30hrs15.30hrs.

Order Commences: 10 August 2026 for up to 18 months.

Anticipated Completion: 14 August 2026.

Access & Diversion: No diversion available.

Contractor: Balfour Beatty, Tel: 03452 415302.

Warwickshire County Council proposes to make the following Temporary Traffic Orders:

ERICA DRIVE, WHITNASH

Order Effect: Road closed to vehicular traffic.

Reason for Order: To enable duct laying works.

Order Commences: 24 August 2026 for up to 18 months.

Anticipated Completion: 26 August 2026.

Access & Diversion: Erica Drive, Firethorn Crescent, Coppice Road and vice versa.

Contractor: Openreach, Tel: 03700 500792.

HIGHLAND ROAD, KENILWORTH

Order Effect: Road closed to vehicular traffic.

Reason for Order: To enable new gas service works.

Order Commences: 24 August 2026 for up to 18 months.

Anticipated Completion: 27 August 2026.

Access & Diversion: Highland Road and vice versa.

Contractor: Cadent Gas, Tel: 0800 111 999.

HOME FARM, LEEK WOOTTON

Order Effect: Road closed to vehicular traffic.

Reason for Order: To enable duct laying works.

Order Commences: 24 August 2026 for up to 18 months.

Anticipated Completion: 26 August 2026.

Access & Diversion: No diversion available.

Contractor: Quantum TM, Tel: 01724 786286.

WESTONBIRT CLOSE, KENILWORTH

Order Effect: Road closed to vehicular traffic outside properties 23 to 24.

Reason for Order: To enable duct laying works.

Order Commences: 26 August 2026 for up to 18 months.

Anticipated Completion: 28 August 2026.

Access & Diversion: Bodnant Way, Rawnsley Drive, Tisdale Riase, Westonbirt Close and vice versa.

Contractor: Quantum TM Ltd, Tel: 01724 786286.

WELLINGTON ROAD, LILLINGTON, LEAMINGTON SPA

Order Effect: Road closed to vehicular traffic between its junction with Haddon Road and Compton Close.

Reason for Order: To enable installation of a new water pipe.

Order Commences: 25 August 2026 for up to 18 months.

Anticipated Completion: 28 August 2026.

Access & Diversion: Haddon Road, Buckley Road, Wellington Road and vice versa.

Contractor: Chevron TM Ltd, Tel: 0330 008 0820.

B4455 FOSSE WAY, RADFORD SEMELE

Order Effect: Road closed to vehicular traffic between A425 Southam Road Roundabout and its junction with Harbury Lane crossroads. In addition, a 40mph speed restriction will be imposed between the entrance to Leamington Hall Farm and the entrance to Sharmer Farm/Sharmer Field House.

Reason for Order: Carriageway resurfacing and associated works, weeknights 20.00hrs-06.00 hrs.

Order Commences: 24 August 2026 for up to 18 months.

Anticipated Completion: 29 August 2026.

Access & Diversion: A425 (Southam Road, Ufton Hill, Southam Road), B4452 (Ufton Road, Deppers Bridge Road), B4451 (Station Road, Gaydon Road), B4100 Banbury Road, B4455 Fosse Way and vice versa.

Contractor: Balfour Beatty, Tel: 01926 245650.

For all of the above temporary orders, pedestrian access to and egress from properties and land situated adjacent to the length of road to be closed will be maintained at all times. Vehicular access will be maintained where possible.

To report any problems with these works or for further details of our current & planned roadworks visit our website warwickshire.gov.uk/roadworksmap or call us 01926 412515.

WARWICKSHIRE COUNTY COUNCIL

HIGHWAYS ACT 1980, SECTION 90G

PROPOSED GIVE-WAY PRIORITY BUILD-OUT ARRANGEMENT ON FUSILIERS WAY, WARWICK

Warwickshire County Council is proposing to install a single proposed give-way priority build-out pursuant to S90G of the Highways Act 1980 on Fusiliers Way in Warwick located between Butler Way and Pinewood Avenue as described in further detail in the Schedule below.

A copy of the plans showing the location of the Give-Way and a statement of the Council’s reasons for proposing to install the Give-Way, may be inspected at Shire Hall, Market Place, Warwick, during usual opening hours and on the Council’s website: https://www.warwickshire.gov.uk/news/20210/warwick-district 

Any enquiries relating to the proposals may be made to Chris Round, Communities Directorate, Warwickshire County Council (Telephone Number 01926 413789).

Any objections to or representations in support of the proposals, which must be in writing and specify the grounds on which they are made, should be addressed to Chris Round, County Highways Minor Works, Shire Hall, Market Place, Warwick, CV34 4RL or via email to pmc@warwickshire.gov.uk using the reference Fusiliers Ways Warwick – Proposed Give-way Priority build-out arrangement.

(Objections, representations, and the name of the objector or person making a representation, will normally be treated as public information and may be published. For further information on how Warwickshire County Council processes personal data please refer to the Customer Privacy Notice which is available at https://www.warwickshire.gov.uk/privacy).

Objections and representations must be sent so as to be received by 31st August 2026.

SCHEDULE

(Location of Priority Give-Way Build-out on Fusiliers Way, Warwick) Fusiliers Way, Warwick

Located from the corner of property No.02 on Fusiliers Way in a North-easterly direction at a point 54m away from that starting location.

The size of the build-out is – 6m in length x 1.5m wide with a gap of 75mm between the existing kerb line and the proposed build-out

WARWICKSHIRE COUNTY COUNCIL

HIGHWAYS ACT 1980, SECTION 90G

PROPOSED GIVE-WAY PRIORITY BUILD-OUT ARRANGEMENTS ON MONTAGUE ROAD, EMSCOTE – WARWICK

Warwickshire County Council is proposing to install two giveway priority build-outs pursuant to S90G of the Highways Act 1980 on Montague Road, Emscote in Warwick located outside properties 86/88 & 4/6 as described in further detail in the Schedule below.

A copy of the plans showing the locations of the Give-Way and a statement of the Council’s reasons for proposing to install the Give-Way, may be inspected at Shire Hall, Market Place, Warwick, during usual opening hours and on the Council’s website: https://www.warwickshire.gov.uk/news/20210/warwick-district 

Any enquiries relating to the proposals may be made to Chris Round, Communities Directorate, Warwickshire County Council (Telephone Number 01926 413789).

Any objections to or representations in support of the proposals, which must be in writing and specify the grounds on which they are made, should be addressed to Chris Round, County Highways Minor Works, Shire Hall, Market Place, Warwick, CV34 4RL or via email to pmc@warwickshire.gov.uk using the reference “Montague Road Priority Give-Way Buildouts x 2”

(Objections, representations, and the name of the objector or person making a representation, will normally be treated as public information and may be published. For further information on how Warwickshire County Council processes personal data please refer to the Customer Privacy Notice which is available at https://www.warwickshire.gov.uk/privacy).

Objections and representations must be sent so as to be received by 31st August 2026.

SCHEDULE

(Location of Priority Give-Way Buildouts on Montague Road, Emscote – Warwick)

1. Montague Road, Emscote – Warwick

Located centrally between properties 88/86 on Montague Road, Emscote.

The size of the build-out is – 6m in length x 1.5m wide with a gap of 75mm between the existing kerb line and the proposed build-out.

2. Montague Road, Emscote – Warwick

Located centrally between properties 4/6 on Montague Road, Emscote.

The size of the build-out is – 6m in length x 1.5m wide with a gap of 75mm between the existing kerb line and the proposed build-out

S Duxbury, Director of Strategy, Planning & Governance, Shire Hall, Warwick CV34 4RL

Date 07 August 2026

Need to publish a public notice?

If you need to publish a public notice, please contact Warwickshire World directly at:

publicnotices@nationalworld.com

02070237931

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association