Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Various North Tyneside Locations, August - Temporary Restriction Of Traffic Order
What is happening?
THE COUNCIL OF THE BOROUGH OF NORTH TYNESIDE
VARIOUS NORTH TYNESIDE LOCATIONS, AUGUST
TEMPORARY RESTRICTION OF TRAFFIC ORDER 2026
North Tyneside Council gives notice that it intends not less than seven days from the date of this Notice to make Orders under Section 14 (1) of the Road Traffic Regulation Act 1984. The effect of the Orders prohibits all through traffic on the following, and as and when signage indicates:
NORTH SHIELDS
Laet Street Lane At Side.
An alternate route is available via Sibthorpe Street, Laet Street, Yeoman Street Lane. With access to be given to residents/refuge.
The proposed temporary Order is required to excavate on existing stop tap and adjacent service to renew with boundary box and meter.
The Order will come into force on 17th August 2026 for a period not exceeding 4 days.
Further information may be obtained by contacting Lisa Stokes of Northumbrian Water on lisa.stokes@nwl.co.uk
PALMERSVILLE
The footpath to the side of number 28 Great Lime Road.
An alternate route is available via the adjacent footpaths.
The proposed temporary Order is required to excavate on existing stop tap and adjacent service to renew with boundary box and meter.
The Order will come into force on 11th August 2026 for a period not exceeding 4 days.
Further information may be obtained by contacting Lisa Stokes of Northumbrian Water via lisa.stokes@nwl.co.uk
TYNEMOUTH
Percy Park Lane from the junction with Percy Park to the rear of 10 The Drive.
An alternate route is available via Percy Park, Grand Parade, Parkside, Abbey Drive, Percy Park Lane.
The proposed temporary Order is required to install 1 new BT telegraph pole.
The Order will come into force on 25th August 2026 for a period not exceeding 3 days.
Further information may be obtained by contacting Dutton Traffic Management on 01606 836 522.
WALLSEND
Side of 31 Welwyn Close to at the rear of 30 Welwyn Close
An alternate route is available via onsite signage
The proposed temporary Order is required to facilitate ducting works as minimum width cannot be maintained for pedestrians
The Order will come into force on 10th August 2026 for a period not exceeding 5 days.
Further information may be obtained by telephoning Chloe Mann on 0191 414 3399.
WHITLEY BAY
Maple Avenue from the junction with Sycamore Avenue to the junction with Chestnut Avenue.
An alternate route is available via Chestnut Avenue, Hillheads Road, Sycamore Avenue
The proposed temporary Order is required for a CCTV survey to the sewer.
The Order will come into force on 27th August 2026 for a period not exceeding 1 day.
Further information may be obtained by contacting Esh Civils on 07813 366826.
Dated: 24 July 2026
Director of Regeneration and Economic Development, Quadrant East, The Silverlink North, Cobalt Business Park, North Tyneside, NE27 0BY
Need to publish a public notice?
If you need to publish a public notice, please contact The Journal directly at: