Try our AI Explainer
This notice is long. Get a simplified view of the most important information, including key dates and locations is seconds.
Footpaths 26 & 27 Llwydcoed And 39 Aberdare - Temporary Footpath Closure For Reinforcement Works
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(LLWYBRAU TROED 26 A 27 LLWYDCOED A 39 ABERDÂR)
GORCHYMYN (CAU DROS DRO) 2026
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf saith diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14(1) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, a fydd yn para chwe mis ar y mwyaf.
Mae angen cau’r llwybrau er mwyn hwyluso gwaith atgyfnerthu i’r rhwydwaith dŵr presennol.
Cau Llwybrau Troed Dros Dro
Effaith y Gorchymyn fydd cau Llwybrau Troed 26 a 27 Llwydcoed a 39 Aberdâr – yn dechrau ar Ffordd Llwydcoed (SN99500409) ac yn parhau i gyfeiriad y dwyrain yn gyffredinol ac yna I’r de-ddwyrain hyd at ei chyffordd â Llwybrau Troed 38, 40 a 63 (Aberdâr) wrth (SO00500384)
Llwybr amgen i gerddwyr:
Dylai cerddwyr ddefnyddio rhwydwaith presennol y priffyrdd tra bod y llwybrau ar gau.
Fydd DIM mynediad i gerbydau’r gwasanaethau brys.
Mae disgwyl i'r llwybr troed fod ar gau yn ystod y
dyddiadau canlynol neu hyd nes y bydd y gwaith wedi'i gwblhau:
• Cau’r llwybrau’n gyfan gwbl rhwng 20 Gorffennaf a 20 Medi 2026
Dyddiad 7 Gorffennaf 2026
Andrew Wilkins
Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol
2 Llys Cadwyn, Stryd y Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(FOOTPATHS 26 & 27 LLWYDCOED AND 39 ABERDARE)
(TEMPORARY FOOTPATH CLOSURE) ORDER 2026
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council intends not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 which will have a maximum duration of six months.
The closure is necessary to facilitate reinforcement works to the existing water network.
Temporary Footpath Closures
The effect of the Order will be to close Footpaths 26 & 27 Llwydcoed and 39 Aberdare – commences on Llwydcoed Road (SN99500409) and proceeds in a generally easterly and then south-easterly direction to its junction with Footpaths 38, 40 and 63 (Aberdare) at (SO00500384)
Alternative Route for pedestrians:
During the period of the closure, the public should use the existing highway network.
Access for emergency services WILL NOT be maintained.
The closure is expected to be in operation during the following dates, or until such time as the works have been completed
• Full Closure 20th July 2026 – 20th September 2026
Dated 7th July 2026
Andrew Wilkins
Director of Legal and Democratic Services
2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: