The Craig road, Penallt - Temporary restrictions for Dwr Cymru Welsh Waterworks
What is happening?
CYNGOR SIR FYNWY
HYSBYSIAD RHEOLEIDDIO TRAFFIG DROS DRO
ADRAN 14 - DEDDF RHEOLEIDDIO TRAFFIG FFORDD 1984
CYNGOR SIR FYNWY
(HEOL Y GRAIG, PENALLT, SIR FYNWY)
HYSBYSIAD RHEOLEIDDIO TRAFFIG DROS DRO 2025
HYSBYSIR DRWY HYN bod CYNGOR SIR FYNWY, Neuadd y Sir, y Rhadyr, Brynbuga, NP15 1GA ("y Cyngor") yn bwriadu gwneud Gorchymyn yn unol â'r pwerau a roddwyd gan Adran 14(1)(a) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984:
1. Daeth y Gorchymyn i rym ar 11eg Rhagfyr 2025 a bydd yn parhau i fod mewn grym am gyfnod nad yw'n hwy na 18 mis neu nes bod y gwaith y cynigir ei wneud wedi'i gwblhau, pa un bynnag yw'r cynharaf. Rhagwelwyd bod y gwaith yn cael ei gwblhau rhwng 11eg Rhagfyr 2025 a’r 13eg Rhagfyr 2025.
2. Roedd y Gorchymyn yn angenrheidiol er mwyn i Dŵr Cymru wneud gwaith mewn modd diogel yn y lleoliad. Cedwir mynediad rhesymol i eiddo sy'n wynebu'r darnau o'r ffordd yr effeithir arnynt yn ystod y cyfnod cau.
3. Effaith y Gorchymyn oedd cau dros dro rhan o Heol y Graig, Penallt, Sir Fynwy, ~115m o'r gyffordd â’r C48.1 Heol y Graig i Benallt am ~135m.
4.Nid oedd llwybr dargyfeirio gan nad yw'r ffordd yn ffordd drwodd - bydd mynediad/allanfa yn cael ei chynnal o dan oedi byr.
5. Gellir enwi'r Gorchymyn hwn fel Gorchymyn Rheoleiddio Traffig Dros Dro Heol y Graig, Penallt, Sir Fynwy 2025.
6. Yn sgil Adran 16(1) Deddf Rheoleiddio Traffig Ffordd 1984 bydd person sy'n torri cyfyngiad neu waharddiad a osodir dan Adran 14 y Ddeddf yn euog o drosedd.
Dyddiad: 10fed Rhagfyr 2025
Carl Touhig
Pennaeth Gwasanaethau Cymdogaeth
Cyngor Sir Fynwy
Neuadd y Sir
Y Rhadyr
Brynbuga
Sir Fynwy
NP15 1GA
MONMOUTHSHIRE COUNTY COUNCIL
TEMPORARY TRAFFIC REGULATION NOTICE
SECTION 14 - ROAD TRAFFIC REGULATION ACT 1984
MONMOUTHSHIRE COUNTY COUNCIL
(THE CRAIG ROAD, PENALLT, MONMOUTHSHIRE)
TEMPORARY TRAFFIC REGULATION NOTICE 2025
NOTICE IS HEREBY GIVEN that MONMOUTHSHIRE COUNTY COUNCIL of County Hall, The Rhadyr, Usk, NP15 1GA (“the Council”) Has made an order pursuant to the powers conferred by Section 14(1)(a) of the Road Traffic Regulation Act 1984
1. The Order came into operation on the 11th December 2025 and will continue to be in force for a period not exceeding 18 months or until the works which it is proposed to carry out have been completed, whichever is the earlier. It is anticipated that the works will be completed between 11th December 2025 and 13th December 2025.
2. The order was necessary for Dwr Cymru Welsh Waterworks to take place in a safe manner at the location. Reasonable access will be maintained for properties fronting the affected lengths of road during the period of the closure.
3. The effect of the order was to temporarily close a section of The Craig Road, Penallt, Monmouthshire, ~115m from its junction with C48.1 The Craig Road to Penallt for ~135m.
4. There was no signed diversion route as the road is a no through road, access/egress will be maintained under short delays.
5. This order may be cited as the The Craig Road, Penallt, Monmouthshire Temporary Traffic Regulation Order 2025
6. By virtue of Section 16(1) of the Road Traffic Regulation Act 1984 a person who contravenes a restriction or prohibition imposed under Section 14 of the Act shall be guilty of an offence.
Dated: 10th December 2025
Carl Touhig
Head of Neighbourhood Services
Monmouthshire County Council
County Hall
The Rhadyr
Usk
Monmouthshire
NP15 1GA
Need to publish a public notice?