Monmouth, Temporary Road Closure Due To Works
What is happening?
HYSBYSIAD STATUDOL
I gael copi print bras o’r Hysbysiad hwn, ffoniwch 0300 0604400 neu e-bostiwch Trafnidiaeth. YGangenOrchmynion@llyw.cymru
GORCHYMYN CEFFORDD YR A40 (FFORDD YMYNO O CINDERHILL STREET, TREFYNWY, SIR FYNWY) (GWAHARDDIADAU TRAFFIG DROS DRO) 2025
MAE GWEINIDOGION CYMRU wedi gwneud Gorchymyn o dan adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984. Mae angen y Gorchymyn arfaethedig er mwyn gwneud gwaith ar gefnffordd yr A40, neu gerllaw iddi, yn Nhrefynwy, Sir Fynwy.
Effaith y Gorchymyn fydd gwahardd dros dro bob cerbyd, ac eithrio’r rhai a ddefnyddir gan y gwasanaethau brys ac ar gyfer y gwaith, pob beicwr a phob cerddwr rhag mynd ar y darn hwnnw o ffordd ymuno tua’r dwyrain (cefnffordd yr A40 o Cinderhill Street, Trefynwy, Sir Fynwy i brii gyfthtffordd tua’r dwyrain y gefnffordd.
Y llwybr arall ar gyfer cerbydau sy’n teithio tua’r gogledd-ddwyrain, y bydd cau’r ffordd yn effeithio arnynt, yw mynd ar y B4233 tua’r gogledd-orllewin ac yna’r B4293 tua’r gogledd-ddwyrain a’r A466 Dixton Road i ymuno â’r A40 drwy Gyfuchlan Dixton.
Daw’r Gorchymyn i rym ar 24 Tachwedd 2025. Disgwylir i’r achos o gau ffordd dros dro fod yn weithredol dros nos o 20:00 o’r gloch ar 24 Tachwedd 2025 hyd 06:00 o’r gloch ar 25 Tachwedd 2025 a’r nosweithiau dilynol hyd nes y bydd y gwaith wedi ei gwblhau neu pan gaiff yr arwyddion traffig dros dro eu symud ynta’n barhaol.
Dim ond yn ystod y cyfnod a bennir uchod y disgwylir i’r gwaharddiadau dros dro fod yn weithredol. Er hynny, bydd y Gorchymyn yn parhau’n ddilys am gyfnod o 18 mis ar y mwyaf, rhag ofn y bydd angen ailwasanaelennu’r gwaith neu wneud gwaith canlynol neu waith arall. Bydd hysbysiad ynlan llaw am unrhyw newidiadau i’r amseroedd a’r dyddiadau yn cael ei arddangos cyn gwneud unrhyw waith a ailamserlennir.
Gellir gweld copi o’r Gorchymyn a’r Hysbysiad ar wefan Llywodraeth Cymru ar https://llyw.cymru/gorchmynion-ffyrdd
C WYNN, Trafnidiaeth, Llywodraeth Cymru
STATUTORY NOTICE
For a large print copy of this Notice contact 0300 0604400 or email Transportordersbranch@gov.wales
THE A40 TRUNK ROAD (ON-SLIP ROAD FROM CINDERHILL STREET, MONMOUTH, MONMOUTHSHIRE) (TEMPORARY TRAFFIC PROHIBITIONS) ORDER 2025
THE WELSH MINISTERS have made an Order under section 14 of the Road Traffic Regulation Act 1984, which is necessary to undertake works on or near the A40 trunk road at Monmouth, Monmouthshire.
The effect of the Order will be to temporarily prohibit all vehicles, other than those being used by the emergency services and for the works, cyclists and pedestrians from proceeding on that length of the A40 trunk road eastbound on-slip road from Cinderhill Street, Monmouth, Monmouthshire onto the main eastbound carriageway of the trunk road.
The alternative route for northeastbound vehicles, affected by the closure is via the B4233 northwestwards and then the B4293 northeastwards and A466 Dixton Road to join the A40 via the Dixton Roundabout.
The Order will come into force on 24 November 2025. The temporary road closure is expected to operate overnight from 20:00 hours on the 24 November 2025 to 06:00 hours on the 25 November 2025 and subsequent nights until the works are complete or when the temporary traffic signs are permanently removed.
Although the temporary prohibitions are only expected to operate during the period specified above the Order will remain valid for a maximum period of 18 months, as a contingency, should the work need to be rescheduled or consequential or other work is required. Advance notice of any changes to times and dates will be displayed before any rescheduled work.
A copy of the Order and Notice can be viewed on the Welsh Government’s website at https://gov.wales/road-orders
C WYNN, Transport, Welsh Government
How long will it take?
Planned start
24-Nov-2025
Estimated end
25-Nov-2025