Bryn Bedw Street - Temporary Traffic Order Install A New Service Connection
What is happening?
GORCHYMYN CAU FFORDD DROS DRO
(BRYN BEDW STREET, BLAENGARW) CYNGOR BWRDEISTREF SIROL PEN-Y-BONT AR OGWR 2025 RHODDIR HYSBYSIAD DRWY HYN bod y Cyngor fel yr Awdurdod Priffyrdd ar gyfer Blaengarw wrth arfer ei bwerau dan Adran 14(1) Deddf Rheoleiddio Traffig Ffyrdd 1984 (fel y’i diwygiwyd), heb fod yn llai na 7 diwrnod o ddyddiad yr Hysbysiad hwn, yn bwriadu creu Gorchymyn a fydd yn cyflwyno, dros dro, y cyfyngiad a nodir yn yr atodlen isod. Mae’r Gorchymyn yn angenrheidiol oherwydd bod angen cau’r ffordd i osod cysylltiad gwasanaeth newydd gyda’r ffordd nad yw’n ddigon llydan ar gyfer parth diogelwch digonol. Daw’r Gorchymyn i rym ar 08/12/2025 a bydd yn parhau mewn grym am uchafswm o 18 mis, neu hyd nes y bydd y gwaith wedi’i gwblhau, p’un bynnag sydd gynharaf. Rhagwelir y bydd y gwaith arfaethedig yn cael ei wneud rhwng 08:00 ar 08/12/2025 a 18:00pm ar 10/12/2025.
Atodlen - Ni fydd unrhyw berson yn achosi i unrhyw gerbyd fynd ar hyd oddeutu 50 metr o Bryn Bedw Street, Blaengarw, i gyfeiriad y gogledd o’r gyffordd â David Street. Y llwybr amgen ar gyfer cerbydau yw trwy Bryn Bedw Street, Herbert Street, The Strand, David Street, ac i’r gwrthwyneb. Ni fydd mynediad ar gyfer y gwasanaethau brys. Bydd mynediad i gerddwyr at yr holl eiddo. Fodd bynnag, bydd y cyfyngiadau’n berthnasol dim ond ar adegau ac i’r graddau a ddangosir o bryd i’w gilydd ar arwyddion traffig a osodir gan Reoliadau a Chyfarwyddiadau Cyffredinol Arwyddion Traffig 2016.
Dyddiedig: 20/11/2025
K Watson, Prif Swyddog Gwasanaethau Cyfreithiol a Rheoliadol, Adnoddau Dynol a Pholisi Corfforaethol – Cyfarwyddiaeth y Prif Weithredwr, Cyngor Bwrdeistref Sirol Pen-y-bont ar Ogwr, Swyddfeydd Dinesig, Stryd yr Angel, Pen-y-bont ar Ogwr CF31 4WB
BRIDGEND COUNTY BOROUGH COUNCIL
(BRYN BEDW STREET, BLAENGARW) TEMPORARY TRAFFIC ORDER 2025 NOTICE IS HEREBY GIVEN that the Council as the Highway Authority for Blaengarw in exercise of its powers under Section 14(1) of the Road Traffic Regulation Act 1984 (as amended) intends in not less than 7 days from the date of this Notice to make an Order which will temporarily introduce the restriction set out in the schedule below. The Order is necessary due to a road closure being required to install a new service connection with the road not being wide enough for a sufficient safety zone. The Order will come into force on the 08/12/2025 and will continue in force for a maximum period of 18 months, or until such time as the works are completed, whichever is the sooner. It is anticipated the planned works will be undertaken between the hours of 08:00am on 08/12/2025 until 18:00pm on 10/12/2025.
Schedule - No person shall cause any vehicle to proceed along approximately 50 metres of Bryn-Bedw Street, Blaengarw, in a Northerly direction from its junction with David Street. The alternative route for vehicles is via Bryn-Bedw Street, Herbert Street, The Strand, David Street and vice versa. Access will not maintained for emergency services. Pedestrian access will be maintained to all properties. The restrictions shall however only apply at such time and to such extent as shall from time to time be indicated by traffic signs prescribed by The Traffic Signs Regulations and General Directions 2016. Dated: 20/11/2025
K Watson, Chief Officer Legal & Regulatory Services, Human Resources and Corporate Policy – Chief Executive’s Directorate, Bridgend County Borough Council, Civic Offices, Angel Street, Bridgend CF31 4WB
Need to publish a public notice?
If you need to publish a public notice, please contact Glamorgan Gazette directly at: