Havering, Multiple Traffic Notices, Road Closures
What is happening?
LONDON BOROUGH OF HAVERING
ROAD TRAFFIC REGULATION ACT 1984 SECTION 14(1) AND 16, PROPOSED AND MADE ORDER NOTICES
WE THE LONDON BOROUGH OF HAVERING GIVE NOTICE THAT WE PROPOSE TO MAKE THOSE RESTRICTIONS REFERRED TO IN PART 1 TO THIS NOTICE AND HAVE MADE THE RESTRICTIONS REFERRED TO IN PART 2 TO THIS NOTICE, IN EACH CASE FOR THE REASONS AND DURATION STATED (OR UNTIL THE COMPLETION OF THE WORKS OR EVENT – WHICHEVER IS THE SOONER) AND WITH DIVERSION ROUTES AVAILABLE
IMRAN KAZALBASH, DIRECTOR ENVIRONMENT
(PUBLISHED IN THE ROMFORD RECORDER 7th NOVEMBER 2025)
PART 1 – PROPOSED NOTICE (PROPOSED RESTRICTIONS)
| TT No | Road Name and Restriction(s) | Reason | Diversion Route | Duration of Works/Event |
|---|---|---|---|---|
| 1134 | Road Closure and No Waiting No Loading Beaulay Way closed from its junction with Pettits Lane North to the side entrance of the fire station Contact: NRSWA@havering.gov.uk | Sewer cover replacement | Pettits Lane North, Ayr Way, Deveron Way, Clyde Way, Beaulay Way (in both directions) | Between 09:30 – 15:30 on 17th November 2025 or upon completion of the works whichever is the sooner |
| 1160 | Road Closure and No Waiting No Loading Ashton Road closed between its junctions of Tangent Link and Spilsby Road Bampton Road closed at its junction with Ashton Road Contact: Bryn.Jellis@havering.gov.uk | Carriageway resurfacing and concrete repairs | Ashton Road, Faringdon Avenue, Spilsby Road | Between 18:30 – 06:00 on 17?? to 21st November 2025 nightly or upon completion of the works whichever is the sooner and between 18:30 – 06:00 on 25th and 26th November 2025 nightly or upon completion of the works whichever is the sooner |
| 1185 | Road Closure and No Waiting No Loading Herbert Road closed at its junction with Curtis Road Contact: Dean.R.Martin@havering.gov.uk | Carriageway resurfacing | Wingletye Lane, Parkstone Avenue, Ernest Road | Between 08:00 – 16:00 on 21st November 2025 or upon completion of the works whichever is the sooner |
| 1186 | Road Closure and No Waiting No Loading Glenwood Drive closed from the side no. 41 Carlton Road Contact: Matt.Jones@havering.gov.uk | Carriageway resurfacing | Carlton Road, Stanley Avenue |
| No | Road Name and Restriction(s) | Reason | Diversion Route | Duration of Works/Event |
|---|---|---|---|---|
| 1192 | Road Closure and No Waiting No Loading Phase 1: South End Road closed between its junctions of Airfield Way and Haynes Drive. Airfield Way closed at its junction with South End Road. Phase 2: South End Road closed between its junctions of Airfield Way and Haynes Drive. Heron Flight Avenue closed at its junction with South End Road. Phase 3: South End Road closed between its junctions of Airfield Way and Mungo Park Road. Phase 4: South End Road closed between its junctions of Airfield Way and Jersey Road. Haynes Road closed at its junction with Airfield Way. Mungo Park Road closed at its junction with Airfield Way. Phase 5: South End Road closed between its junctions of Mungo Park Road and Ford Lane. Princes Park closed at its junction with Airfield Way. St Johns Close closed at its junction with South End Road. Phase 6: South End Road closed between its junctions of Mungo Park Road and Ford Lane. Jersey Road closed at its junction with South End Road. Contact: Bryn.Jellis@havering.gov.uk | Carriageway resurfacing | Phase 1 Diversion for South End Road: Wood Lane, Mungo Park Road (both directions). Diversion for Airfield Way: Suttons Avenue, Abbs Cross Lane, South End Road (both directions). Phase 2 Diversion for South End Road: Wood Lane, Mungo Park Road (both directions). Heron Flight Avenue: no diversion. Phase 3 Diversion for South End Road: Wood Lane (Westbound), Mungo Park Road (Southbound) (both directions). Phase 4 Diversion for South End Road: Wood Lane, Rainham Road, South End Road (both directions). Diversion for Mungo Park Road (Southbound): Wood Lane (Westbound), Rainham Road (Southbound), Rainham Road (Eastbound), South End Road (Northbound). Diversion for Mungo Park Road (Northbound): Wood Lane (Eastbound), South End Road (Northbound). Diversion for Haynes Drive: Haynes Drive, Avelon Road, Grove Park Road (both directions). Phase 5 Diversion for South End Road: Mungo Park Road, Wood Lane, Rainham Road, South End Road (both directions). Princes Park: no diversion. Albyns Close: no diversion. St Johns Close: no diversion. Phase 6 Diversion for South End Road: Mungo Park Road, Wood Lane, Rainham Road, South End Road (both directions). Diversion for Jersey Road: Jersey Road, Mungo Park Road (both directions). |
| TT No | Road Name and Restriction(s) | Reason | Diversion Route | Duration of Works/Event |
|---|---|---|---|---|
| 1178 | Road Closure and No Waiting No Loading Philip Road closed from its junction with Stanley Road Contact: NRSWA@havering.gov.uk | Pole renewal | Philip Road, New Road (A1306), Cherry Tree Lane, Stanley Road (in both directions) | Between 08:00 – 16:00 on 16th November 2025 or upon completion of the works whichever is the sooner |
| 1189 | Road Closure and No Waiting No Loading Pettitts Boulevard closed outside nos. 14 and 15 Contact: Drazen.Milasin@havering.gov.uk | Carriageway resurfacing | Rise Park Boulevard, Beauly Way, Pettitts Lane North | Between 08:00 – 16:00 on 6th November 2025 or upon completion of the works whichever is the sooner |
Need to publish a public notice?
If you need to publish a public notice, please contact Romford Recorder directly at: