(A4184 Abbey Road, Evesham) (Temporary Closure) Order 2025
Proposed Order: To close that part of A4184 Abbey Rd from its junction with B4035 Waterside for a distance of 110 metres in a northerly direction.
Reason: Manhole Sewer Lining Repairs by STW.
Alternative route: B4035 Waterside, B4035 Port St, B4035 Elm Rd, B4035 Badsey Rd, A46 Evesham Bypass, A44 Twyford Roundabout to Norton Lenchwick Bypass, A4184 Twyford Bank, A4184 Greenhill, A4184 High St, A4184 Abbey Rd (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 1 day. Commencing: 16 November 2025.
(U45046 Orchard Close, South Littleton) (Temporary Closure) Order 2025
Proposed Order: To close that part of U45046 Orchard Cl from a point 129 metres north of its junction with C2009 Shinehill Ln for a distance of 40 metres in an easterly direction.
Reason: Manhole cover replacement by STW.
Alternative route: No diversion due to it being a dead end.
Maximum duration: 18 Months. Anticipated duration: 1 day. Commencing: 18 November 2025.
(C2049 High Street, Honeybourne) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2049 High St from its junction with Maple Cl (NSG Ref 45406074) for a distance of 30 metres in a south westerly direction.
Reason: Manhole cover renewal by STW.
Alternative route: C2049 High St (part), C2006 Weston Rd into Gloucestershire, B4035 Weston Rd, B4035 New St, C2049 Bretforton Rd, C2049 High St (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 1 day. Commencing: 18 November 2025.
(B4078 Winchcombe Road, Sedgeberrow) (Temporary Closure) Order 2025
Proposed Order: To close that part of B4078 Winchcombe Rd from its junction with U45633 Millfield for a distance of 990 metres in a southerly direction until the boundary with Gloucestershire.
Reason: Carriageway resurfacing by AMT Project Construction Limited.
Alternative route: B4078 Cheltenham Rd, A46 Cheltenham Rd into Gloucestershire and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs). Commencing: 27 October 2025.
(B4084 Pershore Road, Stoulton) (Temporary Closure) Order 2025
Order made: To close that part of B4084 Pershore Rd from its junction with B4084 Pershore Rd to its junction with U47619 Abbotswood Rd.
Reason: New customer connection by Western Power Distribution.
Alternative route: C2100 Wadborough Rd, C2100 Abbotswood Rd to Mill Ln, C2109 Mill Ln, B4084 Worcester Rd, B4084 Pershore Rd (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 12 days (24hrs). Commencing: 27 October 2025.
(C2007 Childswickham Road, Broadway) (Temporary Closure) Order 2025
Order made: To close that part of C2007 Childswickham Rd from its junction with B4632 Cheltenham Rd to its junction with U45616 Penny Lands Bank.
Reason: Utility work by STW.
Alternative route: C2007 Childswickham Rd (part), C2007 Hinton Rd, C2007 Broadway Rd, A46 Cheltenham Rd, A46 Evesham Bypass, A44 Broadway Rd, A44 Longdon Hill, A44 Evesham Rd, A44 Broadway Bypass, C2300 Leamington Rd, C2299 High St, B4632 Cheltenham Rd, C2007 Childswickham Rd (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 1 night (20:00–23:59). Commencing: 27 October 2025.
(C2009 Shinehill Lane, South Littleton) (Temporary Closure) Order 2025
Order made: To close that part of C2009 Shinehill Ln from its junction with U45046 Orchard Cl to its junction with U45023 Norval Rd.
Reason: Utility work by STW.
Alternative route: C2009 Shinehill Ln (part), C2009 Blacksmiths Ln, B4085 Main St, B4085 Station Rd, B4085 Blackminster, C2047 Station Rd, C2049 Honeybourne Rd, C2049 Bretforton Rd, C2049 High St, C2006 Station Rd, C2009 Shinehill Rd, C2009 Shinehill Ln (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 3 days. Commencing: 27 October 2025.
(C2114 Dorsington Road, Pebworth) (Temporary Closure) Order 2025
Order made: To close that part of C2114 Dorsington Rd from its junction with Long Marston Rd, Warwickshire, for a distance of 235 metres in a southerly direction.
Reason: New water connection by STW.
Alternative route: C2114 Dorsington Rd (part), C2114 Back Ln, C2114 Long Marston Rd into Warwickshire and vice versa.
Maximum duration: 18 Months. Anticipated duration: 3 days (24hrs). Commencing: 28 October 2025.
(U44206 The Strand/ U44206 Canada Bank/ U44206 Yessel Lane/ U44206 Boston Lane, Charlton) (Temporary Closure) Order 2025
Proposed Order: To close that part of:
Closure 1 – U44206 The Strand from its junction with C2022 Church Leys to its junction with U44206 Canada Bank.
Closure 2 – U44206 Canada Bank from its junction with U44206 The Strand to its junction with U44206 Yessel Ln.
Closure 3 – U44206 Yessel Lane from its junction with U44206 Canada Bank to its junction with U44206 Boston Ln.
Closure 4 – U44206 Boston Lane from its junction with U44206 Yessel Ln to its junction with B4084 Pershore Rd.
Reason: Carriageway patching for surface dressing over multiple phases by WCC.
Alternative route: B4084 Pershore Rd, B4084 Main Rd, C2022 Brook Ln, C2022 Church Leys and vice versa.
Maximum duration: 18 Months. Anticipated duration: 4 days between 17 November 2025 and 28 November 2025.
EXEMPTIONS: TO PERMIT ACCESS TO ANY LAND OR PREMISES FRONTING THE HIGHWAY AFFECTED WHERE THERE IS NO OTHER FORM OF ACCESS; AND TO ALLOW THE WORKS TO BE UNDERTAKEN.
THOMAS POLLOCK, Head of Commercial Law, (Legal and Governance) Services, County Hall, Spetchley Road, Worcester WR5 2NP
23 October 2025
Need to publish a public notice?
If you need to publish a public notice, please contact Evesham Journal directly at: