Worcestershire – Multiple Temporary Road Closures due to Works
What is happening?
WORCESTERSHIRE COUNTY COUNCIL
PUBLIC NOTICE
Road Traffic Regulation Act 1984
(B4202 Clows Top Road/C2071 Apostles Oak, Abberley) (Temporary Closure) Order 2025
Proposed Order: To close that part of
Closure 1 – B4202 Clows Top Road from its junction with U64410 Suffolk Ln to its junction with C2230 The Common.
Closure 2 – C2071 Apostles Oak from its junction with B4202 Clows Top Rd for a distance of 50 metres in an easterly direction.
Reason: Development works by S&R Construction.
Alternative route:
Closure 1 Diversion – B4202 Pensax, B4202 Worcester Rd, A456 Mamble Rd, A456 Mamble, A456 Newnham Bridge, A443 Newnham Bridge, A443 Eardiston, A443 Stockton, A443 The Common Abberley to Wynnaits Way, B4202 Apostles Oak and vice versa.
Closure 2 Diversion – C2071 Apostles Oak (part), U64410 Abberley, U64410 Suffolk Ln and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs). Commencing: 27 October 2025.
(C2064 Bridges Stone, Alfrick) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2064 Bridges Stone from its junction with UC6225 Alfrick for a distance of 250 metres in a westerly direction.
Reason: Tree maintenance by Adam Hope Tree Services Ltd.
Alternative route: C2064 Alfrick Pound, C2233 Alfrick, C2065 Knight’s Rd to Hopton Ln, C2245 Hopton Ln, C2064 Stitchens Hill, C2064 Bridges Stone (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs). Commencing: 27 October 2025.
(C2293 Coombs Road/B4482 Bilford Road, Worcester)
(Temporary Closure) Order 2025
Proposed Order: To close that part of:
Closure 1 – C2293 Coombs Road from its junction with A449 Ombersley Rd to its junction with A38 Droitwich Rd. Closure 2 – B4482 Bilford Road from its junction with A38 Droitwich Rd to its junction with U5021 Bilford Beach Ave North.
Reason: Drainage/flood alleviation by WCC.
Alternative route:
Diversion Closure 1 – C2293 Coombs Road – A449 Ombersley Rd, C2281 Checketts Ln, A38 Droitwich Rd and vice versa.
Diversion Closure 2 – B4482 Bilford Road (Clockwise): B4482 Bilford Rd (part), B4482 Astwood Rd, B4550 Rainbow Hill, B4550 Lowesmoor Terrace, B4205 Pheasant St, B4205 St Martins Gate, A38 City Walls Rd, A38 St Nicholas St, A38 Foregate St, A38 The Tything, A38 Barbourne Rd, A38 Droitwich Rd.
Diversion Closure 2 – B4482 Bilford Road (Anticlockwise): A38 Droitwich Rd, A38 Barbourne Rd, A38 The Tything, A38 St Marys St, A38 Sansome Walk, A38 Sansome Pl, A38 City Walls Rd, B4205 St Martins Gate, B4205 Pheasant St, B4550 Lowesmoor Terrace, B4550 Rainbow Hill, B4482 Astwood Rd, B4482 Bilford Rd (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs). Commencing: 27 October 2025.
(U50113 St Oswalds Road, Worcester) (Temporary Closure) Order 2025
Proposed Order: To close that part of U50113 St Oswalds Rd from its junction with A38 Upper Tything to its junction with C2294 Sansome Walk.
Reason: Dropped kerb installation by WCC.
Alternative route:
Diversion Anticlockwise: A38 The Tything, A38 St Marys St, C2294 Sansome Walk.
Diversion Clockwise: C2294 Sansome Walk, B4205 Pheasant St, B4205 St Martins Gate, A38 Sansome Walk, A38 Sansome Pl, A38 St Nicholas St, A38 Foregate St, A38 The Tything and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs). Commencing: 27 October 2025.
(U52124 Camp Hill Road, Worcester) (Temporary Closure) Order 2025
Proposed Order: To close that part of U52124 Camp Hill Rd from its junction with A44 London Rd for a distance of 525 metres in a south easterly direction.
Reason: Carriageway patching for surface dressing by WCC.
Alternative route: U52124 Battenhall Ave, U52117 Arundel Dr, U52116 Sebright Ave, A44 London Rd.
Maximum duration: 18 Months. Anticipated duration: 1 day between 27 October 2025 and 7 November 2025.
(U50365 Green Lane/U50319 Northwick Road, Worcester) (Temporary Closure) Order 2025
Proposed Order: To close that part of
Closure 1 – U50365 Green Lane from its junction with U50319 Northwick Rd to its junction with U50366 Bevere Cl.
Closure 2 – U50319 Northwick Road from its junction with U50365 Green Ln for a distance of 40 metres in a southerly direction and for a distance of 70 metres in a northerly direction until its junction with U50319 Bevere Green.
Reason: Electricity cable replacement by National Grid.
Alternative route:
Closure 1 Diversion – U50366 Bevere Cl, U50319 Northwick Rd (part) and vice versa.
Closure 2 Diversion – U50365 Green Ln (part), A449 Ombersley Rd, U41080 Bevere Ln, U50319 Bevere Green and vice versa.
Maximum duration: 18 Months. Anticipated duration: 11 days. Commencing: 27 October 2025.
(C2256 Sinton Green/C2256 Dark Lane, Hallow) (Temporary Closure) Order 2025
Proposed Order: To close that part of
Closure 1 – C2256 Sinton Green from a point of 310 metres southeast of its junction with U64007 Sinton Green to its junction with C2256 Dark Ln.
Closure 2 – C2256 Dark Lane from its junction with C2256 Sinton Green for a distance of 280 metres in an easterly direction.
Reason: Drainage work for flood alleviation by WCC.
Alternative route:
Diversion (Northbound) – U64008 Walton Ln, A443 Main Rd, C2256 Dark Ln (part) and vice versa.
Diversion (Southbound) – C2256 Dark Ln (part), A443 Main Rd, C2068 Moseley Rd, C2256 Sinton Green, C2256 Sinton Green (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 3 days (24hrs). Commencing: 27 October 2025.
(C2236 Wichenford) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2236 Wichenford from its junction with U64614 Poplar Rd to its junction with B4204 Martley.
Reason: Drainage/flood alleviation by WCC.
Alternative route: C2236 Wichenford (part), B4204 Martley, B4197 Witley Rd, C2243 Horne Ln, C2243 Wichenford, C2068 Wichenford, C2236 Wichenford (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days.
Commencing: 27 October 2025.
(C2078 Broughton Hackett to Crowle, Broughton Hackett) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2078 Broughton Hackett to Crowle from its junction with Harrison Fields (NSG Ref 45405767) for a distance of 30 metres in a southerly direction.
Reason: New customer connection by Western Power Distribution.
No access for emergency services diversion route will need to be followed.
Alternative route: C2078 Church Rd, C2032 Crowle Green, C2032 Crowle Rd, C2032 Rd from A4538 Pershore Ln to Crowle Rd, A4538 Pershore Ln, A422 Alcester Rd, C2078 Broughton Hackett to Crowle (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 4 days (24hrs).
Commencing: 27 October 2025.
(C2064 Longley Green, Suckley) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2064 Longley Green from its junction with U62217 Suckley to its junction with C2064 Longley Green to Stocks Ln Alfrick.
Reason: New customer connection by A G Redman & Son Ltd.
Alternative route: C2064 Longley Green to Stocks Ln Alfrick, C2064 Alfrick Pound, C2233 Alfrick, C2245 Hopton Ln, C2068 C2244 News Hill, C2244 Suckley, C2070 Suckley, C2064 Malvern Hills Bound, Longley Green Rd, C2064 Longley Green (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs).
Commencing: 27 October 2025.
(C2069 Sinton Green, Hallow) (Temporary Closure) Order 2025
Proposed Order: To close that part of C2069 Sinton Green from its junction with U64004 Sinton Green to its junction with C2256 Sinton Green.
Reason: Drainage work for flood alleviation by WCC.
Alternative route:
Diversion 1 – C2069 Ockeridge, C2068 Wichenford, C2068 Monkwood Green, C2068 Moseley Rd, C2069 Worlds End and vice versa.
Diversion 2 – U64005 Sinton Green, U64004 Sinton Green and vice versa.
Maximum duration: 18 Months. Anticipated duration: 2 days.
Commencing: 23 October 2025.
(U51012 Lansdowne Crescent, Worcester) (Temporary Closure) Order 2025
Order made: To close that part of U51012 Lansdowne Cres from its junction with C2294 Lansdowne Rd to its junction with U51012 Lansdowne Crescent Ln.
Reason: Single dropped kerb by WCC.
Alternative route: C2294 Lansdowne Rd, U51014 Lansdowne Walk, U51014 Rogers Hill, U51012 Lansdowne Crescent Ln and vice versa.
Maximum duration: 18 Months. Anticipated duration: 2 days.
Commencing: 6 October 2025.
(U51336 Dee Way, Worcester) (Temporary Closure) Order 2025
Order made: To close that part of U51336 Dee Way from its junction with U51335 Avon Rd to its junction with U51334 Teme Rd.
Reason: Footway reconstruction by WCC.
Alternative route: U51334 Teme Rd, U51335 Conway, U51335 Avon Rd and vice versa.
Maximum duration: 18 Months. Anticipated duration: 8 days (24hrs).
Commencing: 7 October 2025.
(U52035 Prestwich Avenue, Worcester) (Temporary Closure) Order 2025
Order made: To close that part of U52035 Prestwich Ave from its junction with U52036 Devon Rd to its junction with U52037 Redfern Ave.
Reason: Utility by Cadent.
Alternative route: U52036 Devon Rd, U52037 Redfern Ave and vice versa.
Maximum duration: 18 Months. Anticipated duration: 2 days (24hrs).
Commencing: 4 October 2025.
(C2115 Stonebow Road, Drakes Broughton) (Temporary Closure) Order 2025
Order made: To close that part of C2115 Stonebow Rd from its junction with U47629 Shrubbery Rd to its junction with Williamson Way (NSG Ref 45405931).
Reason: Water main replacement by STW.
Alternative route: C2115 Stonebow Rd (part), A44 Evesham Rd Egdon to Stonebow Rd, B4084 Egdon Ln, B4084 Windmill Ln, B4084 Worcester Rd, C2115 Stonebow Rd (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days.
Commencing: 6 October 2025.
(U60003 Brookend Lane, Kempsey) (Temporary Closure) Order 2025
Order made: To close that part of U60003 Brookend Ln from its junction with U60027 Brook Cl to its junction with U60002 Holdings Ln.
Reason: Water main replacement by STW.
Alternative route: U60003 Brookend Ln (part), U60002 Roman Rd, C2208 Post Office Ln, A38 Main Rd, U60003 Brookend Ln (part) and vice versa.
Maximum duration: 18 Months. Anticipated duration: 5 days (24hrs).
Commencing: 6 October 2025.
(B4482 Bilford Road, Worcester) (Temporary Closure) Order 2025
Order made: To close that part of B4482 Bilford Rd from its junction with U50200 Wordsworth Ave to its junction with U51034 Kingston Ave.
Reason: Resurfacing works by WCC.
Alternative route:
Diversion clockwise: B4482 Bilford Rd (part), B4482 Astwood Rd, B4550 Rainbow Hill, B4550 Lowesmoor Terrace, B4205 Pheasant St, B4205 St Martins Gate, A38 City Walls Rd, A38 St Nicholas St, A38 Forgate St, A38 The Tything, A38 Barbourne Rd, A38 Droitwich Rd
Diversion anti-clockwise: A38 Droitwich Rd, A38 Barbourne Rd, A38 The Tything, A38 St Marys St, A38 Sansome Walk, A38 Sansome Place, A38 City Walls Rd, B4205 St Martins Gate, B4205 Pheasant St, B4550 Lowesmoor Terrace, B4550 Rainbow Hill, B4482 Astwood Rd, B4482 Bilford Rd (part).
Maximum duration: 18 Months. Anticipated duration: 1 day.
Commencing: 5 October 2025.
(A44 Spetchley Roundabout/A44 Spetchley Road, Spetchley) (Temporary Closure) Order 2025
Order made: To close that part of
Closure 1 – A44 Spetchley Roundabout – Closure of whole roundabout from its junction with A4538 Pershore Ln & A422 Alcester Rd.
Closure 2 – A44 Spetchley Road from its junction with A44 Spetchley Roundabout for a distance of 300 metres in a Westerly direction.
Reason: Carriageway resurfacing and civils work by WCC
Alternative route:
Diversion 1 – Main Diversion: A422 Alcester Rd, A422 Broughton Hackett to Upton Snodsbury, A422 Worcester Rd, B4082 Pershore Rd, B4082 Naunton Rd, B4082 Seaford, B4082 Upton Snodsbury, B4082 Main St, A44 Abbey View Rd, A4104 Link Rd, B4083 Wyre Rd, A44 Station Rd, B4084 Worcester Rd, B4084 Allesborough Hill, B4084 Worcester Rd, A44 Whittington Rd, A4440 Swinesherd Way, A4440 Nunnery Way, B4636 Nunnery Way to A4538 Pershore Lane, A4538 Pershore Lane and vice versa.
Diversion 2 – Eastbound (Closure to Plvinn): A44 Evesham Rd, A44 Allens Hill, B4082 Main St, B4082 Upton Snodsbury, B4082 Seaford, B4082 Naunton Rd, B4082 Pershore Rd, A422 Worcester Rd, A422 Broughton Hackett to Upton Snodsbury, A422 Alcester Rd and vice versa.
Diversion 3 – Westbound (Closure to Plvinn): A44 Evesham Rd, A44 Evesham Rd, Egdon to Stonebow Rd, A44 Worcester Rd, A44 Allens Hill, B4082 Main St, B4082 Upton Snodsbury, B4082 Seaford, B4082 Naunton Rd, B4082 Pershore Rd, A422 Worcester Rd, A422 Broughton Hackett to Upton Snodsbury, A422 Alcester Rd and vice versa.
Diversion 4 – Northbound (Closure to Worcester): A44 Spetchley, A4440 Nunnery Way, B4636 Nunnery Way to A4538 Pershore Lane, A4538 Pershore Ln and vice versa.
Diversion 5 – Southbound (Closure to Worcester): A44 Worcester Rd, B4084 Pershore Rd, A44 Station Rd, B4084 Worcester Rd, A44 Allens Hill, B4082 Main St, B4082 Upton Snodsbury, B4082 Seaford, B4082 Naunton Rd, B4082 Pershore Rd, A422 Worcester Rd, A422 Broughton Hackett to Upton Snodsbury, A422 Alcester Road and vice versa.
Maximum duration: 18 Months. Anticipated duration: 2 nights (20:00–06:00 between 3 October 2025 and 7 October 2025.
(A38 Main Road, Kempsey) (Temporary Closure) Order 2025
Order made: To close that part of A38 Main Rd from its junction with U60012 Bestmans Ln to its junction with C2056 The Nash.
Reason: New development works by Walsh Construction Ltd.
Alternative route: A38 Main Rd (part), A38 Clifton, A38 Severn Stoke Bank, A38 Worcester Rd, A4104 Pershore Rd, A4104 Defford Rd, A4104 Baughton Hill, A4104 Woodmancote Rd, A4104 Defford Rd, A4104 Three Springs Rd, B4084 Worcester Rd, A4184 Main Rd, B4083 Wyre Rd, B4083 Terrace Rd, A44 Evesham Rd, A44 Evesham Rd, Egdon to Stonebow Rd, A44 Evesham Rd, A4538 Pershore Ln, B4636 Nunnery Way to A4538 Pershore Ln, A4440 Nunnery Way, A4440 Swinesherd Way, A4440 Whittington Rd, A4440 Crookbarrow Way, A38 Worcester Rd, A38 Worcester Rd and vice versa.
Maximum duration: 18 Months. Anticipated duration: 1 night (20:00–06:00).
Commencing: 7 October 2025.
(C2072 Hope Lane, Clifton upon Teme) (Temporary Closure) Order 2025
Order made: To close that part of C2072 Hope Ln from its junction with U64602 Hope Ln to its junction with U64603 Kenelm Rd.
Reason: Development Works (S278) by Guild Homes.
Alternative route: C2072 Clifton upon Teme, C2072 Hollybush Ln to the Herefordshire, B4204 The Village to Herefordshire, B4204 The Village and vice versa.
Maximum duration: 18 Months. Anticipated duration: 3 days (24hrs).
Commencing: 3 October 2025.
(Link Footpath F50196 Lark Hill, Worcester) (Temporary Closure) Order 2025
Order made: To close that part of Link Footpath F50196 Lark Hill from its junction with U52333 Lark Hill Rd to its junction with U52037 Silverdale Ave.
Reason: Unsafe wall repairs by WCC.
Alternative route: U52333 Lark Hill Rd, A44 London Rd, U52138 Spetchley Rd, U52039 Hillery Rd, U52037 Silverdale Ave and vice versa.
Maximum duration: 6 Months. Anticipated duration: 390 days (24hrs).
Commencing: 7 October 2025.
EXEMPTIONS: TO PERMIT ACCESS TO ANY LAND OR PREMISES FRONTING THE HIGHWAY AFFECTED WHERE THERE IS NO OTHER FORM OF ACCESS; AND TO ALLOW THE WORKS TO BE UNDERTAKEN.
THOMAS POLLOCK, Head of Commercial Law, (Legal and Governance) Services, County Hall, Spetchley Road, Worcester WR5 2NP
2 Oct 2025