Taf Trail - Temporary Footpath Closure For works
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(LLWYBR TAITH TAF)
GORCHYMYN (CAU LLWYBR TROED DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf saith diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14(1) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, a fydd yn para chwe mis ar y mwyaf.
Rhaid cau’r llwybr er mwyn cynnal gwaith adeiladu ar frys.
Cau Llwybr Troed Dros Dro
Effaith y Gorchymyn fydd cau’r rhan honno o Lwybr Taith Taf sy’n rhan o Lwybr Beicio Cenedlaeth Rhif 8, sy’n mynd i gyfeiriad y gogledd o Heol Coedpenmaen, Trallwn ac sy’n dod i ben oddeutu175 metr i’r gorllewin o Ysgol Bro Taf, Cilfynydd.
Llwybr Amgen i gerddwyr – Dylai cerddwyr ddefnyddio rhwydwaith presennol y priffyrdd tra bod y gwaith yma’n mynd rhagddo.
Fydd DIM mynediad ar gyfer y gwasanaethau brys.
Mae disgwyl i’r llwybr troed fod ar gau yn ystod y dyddiadau canlynol neu hyd nes y bydd y gwaith wedi’i gwblhau:
• Cau’n gyfan gwbl rhwng 15 Hydref 2025 a 25 Ionawr 2026
Dyddiad 29 Medi 2025
Andrew Wilkins, Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol, 2 Llys Cadwyn, Stryd y Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(TAF TRAIL)
(TEMPORARY FOOTPATH CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council intends not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 which will have a maximum duration of six months.
The closure is necessary to enable urgent construction works.
Temporary Footpath Closure
The effect of the Order will be to close that section of the Taf Trail forming part of the National Cycle Route no. 8 proceeding northwards from Coedpenmaen Road, Trallwn and terminating approximately 175 metres to the west of Ysgol Bro Taf, Cilfynydd.
Alternative Route for pedestrians – during the closure, pedestrians are advised to use the existing highway network.
Access for emergency services WILL NOT be maintained.
The closure is expected to be in operation during the following dates, or until such time as the works have been completed
• Full closure 15th October 2025 – 25th January 2026
Dated 29 September 2025
Andrew Wilkins, Director of Legal and Democratic Services, 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH