Graig Terrace, Ferndale - Temporary Road Closure To Replacement The Stone Boundary Wall
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(TERAS GRAIG, GLYNRHEDYNOG)
GORCHYMYN (CAU FFORDD DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf wedi gwneud Gorchymyn o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y’i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau’r ffordd er mwyn cynnal gwaith ailosod y wal derfyn sydd wedi’i gwneud o gerrig.
Cau Ffordd Dros Dro:
Effaith y Gorchymyn fydd cau Teras Graig, o’i chyffordd â Stryd y Dyffryn, tua’r gogledd-orllewin am bellter o 30 metr.
Llwybr Amgen:
Tra bod y ffordd ar gau, ewch ar hyd Stryd y Rhaglyw, Stryd yr Undeb, Stryd y Nant a Stryd y Dyffryn/Teras Brynteg.
Bydd mynediad ar gael i gerbydau’r gwasanaethau brys, i gerddwyr ac i eiddo.
Bydd Mynediad yn cael ei gynnal ar gyfer cerbydau sbwriel.
Mae disgwyl i’r ffordd fod ar gau rhwng y dyddiadau a’r amseroedd canlynol, neu hyd nes y bydd y gwaith wedi’i gwblhau:-
• Cau’r ffordd yn gyfan gwbl rhwng 29 Medi a 22 Rhagfyr 2025
Dyddiad 24 Medi 2025
Andrew Wilkins, Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol, 2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(GRAIG TERRACE, FERNDALE)
(TEMPORARY ROAD CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council have made an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to facilitate works to replacement the stone boundary wall.
Temporary Road Closure:
The effect of the Order will be to close Graig Terrace, from its junction with Dyffryn Street, north-westwards for a distance of 30 metres.
Alternative Route:
During this closure, an alternative route is available via Regent Street, Union Street, Brook Street and Dyffryn Street/Brynteg Terrace.
Access will be maintained for emergency services, pedestrians and to premises.
Access will be maintained for refuse vehicles.
The closure is expected to be in operation between the following dates and times, or until such time as the works has been completed: -
• Full closure between 29th September – 22nd December 2025
Dated 24th September 2025
Andrew Wilkins, Director of Legal and Democratic Services, 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: