Blackwood Way, Temporary Road Closure Due To HV Cable Installation & Lane Restrictions
What is happening?
Mae Cyngor Bwrdeistref Sirol Wrecsam yn bwriadu gwneud GORCHYMYN (GWAHARDD TRAFFIG TRWODD) DROS DRO dan Adran 14(1) Deddf Rheoleiddio Traffig Ffyrdd 1984
o 29/09/2025 a fydd yn gwahardd unrhyw gerbyd rhag defnyddio’r darn hwnnw o A5156 Blackwood Way, Ffordd Gyswllt Llan-y-Pwll, Stad Ddiwydiannol Wrecsam rhwng y gyffordd â chylchfan Lôn y Bryn i’r gyffordd â Lôn Bryn Estyn am 246m i alluogi O’Connor Utilities ar ran Scottish Power gloddio a gosod cebl folted uchel ar y llain yn y llwybr troed defnydd deuol. Dim ond Llwybr Troed a Lôn 1 yn unig fydd yn cau, i roi llwybr mynediad diogel i feicwyr a cherddwyr. Bydd mynediad i gerddwyr yn cael ei gynnal drwy gydol y cyfnod y bydd y ffordd ar gau. Mewn cysylltiad â’r cau hwn ar Lôn 1 ar yr A5156 Ffordd y Coed Duon, bydd lonydd ar gau ar gylchfan Lôn y Bryn. Yn ogystal, bydd Gostyngiad Cyflymder i 30mya ar waith trwy gydol y cyfnod.
Disgwylir i’r gwaharddiad bara am 3 wythnos, neu nes y caiff y gwaith ei gwblhau os yn gynt, a gallai bara hyd at 18 mis
Dyddiad 16/09/25
Darren Williams – Prif Swyddog, Amgylcheddol a Thechnegol
Rydym yn croesawu gohebiaeth yn Gymraeg. Byddwn yn ymateb i unrhyw ohebiaeth yn Gymraeg ac ni fydd hyn yn arwain at unrhyw oedi.
Wrexham County Borough Council intends to make a TEMPORARY (PROHIBITION OF THROUGH TRAFFIC) ORDER under Section 14(1) of the Road Traffic Regulation Act 1984
effective from 29/09/2025 prohibiting any vehicle from using that length of A5156 Blackwood Way, Llan-y-Pwll Link, Wrexham Industrial Estate between its junction with Bryn Lane Roundabout to its junction with Bryn Estyn Road for a distance of 246m to enable O’Connor Utilities on behalf of Scottish Power to excavate and install a HV cable in the verge and in the dual use footway. The closure will be on the Dual use Footway and Lane 1 only, to provide a safe access route for cyclists and pedestrians. Pedestrian access will be maintained throughout the period of closure. In association with this Lane 1 closure on A5156 Blackwood Way, there will be lane closures on Bryn Lane roundabout. Additionally, a Speed Reduction to 30mph will be in place throughout the duration. The prohibition is expected to last for 3 weeks, or until completion of the works if earlier, with a maximum duration of 18 months.
Dated 16/09/25
Darren Williams – Chief Officer, Environment & Technical
We welcome correspondence in Welsh. We will respond to any correspondence in Welsh which will not lead to a delay.
How long will it take?
Planned start
29-Sept-2025
Estimated end
20-Oct-2025