Holt Road, Temporary One-Way Road Closure For Electrical Repairs
What is happening?
Mae Cyngor Bwrdeistref Sirol Wrecsam wedi gwneud GORCHYMYN (GWAHARDD TRAFFIG TRWYDD) DROS DRO dan Adran 14(1) Deddf Rheoleiddio Traffig Ffyrdd 1984
o 15/09/2025 a fydd yn gwahardd unrhyw gerbyd rhag defnyddio’r darn hwnnw o’r A534 Ffordd Holt, Wrecsam, o’r gyffordd â chylchfan Greyhound, i gyfeiriad y de am gyfanswm o 75 metr i alluogi O’Connor Utilities ar ran Scottish Power i gynnal Atgyweiriadau Trydanol ar y droedffordd. Bydd y ffordd ar gau i un cyfeiriad, gyda llif y traffig i gyfeiriad y de tuag at ganol dinas Wrecsam.
Y ffordd amgen i gerbydau yr effeithir arnynt gan hyn yw ar hyd yr A5152 Bodhyfryd, A5152 Ffordd Powell, A5152 Ffordd Caer, A483 Cyffordd 5 Cyfnewidfa Gresffordd, A5152 Ffordd Gyswllt Llan-y-pwll, a’r A4835 Ffordd Holt a chodiir arwyddion yn unol â hynny. Bydd mynediad i gerddwyr yn cael ei gynnal drwy gydol y cyfnod y bydd y ffordd ar gau.
Disgwylir i’r gwaharddiad bara am 5 diwrnod gwaith, neu nes cwblhau’r gwaith yn gynt, a gallai bara hyd at 18 mis.
Dyddiedig: 12.9.25
Darren Williams – Prif Swyddog, Amgylcheddol a Thechnegol
Rydym yn croesawu gohebiaeth yn Gymraeg. Byddwn yn ymateb i unrhyw ohebiaeth yn Gymraeg ac ni fydd hyn yn arwain at unrhyw oedi.
Wrexham County Borough Council has made a TEMPORARY (PROHIBITION OF THROUGH TRAFFIC) ORDER under Section 14(1) of the Road Traffic Regulation Act 1984
effective from 15/09/2025 prohibiting any vehicle from using that length of A534 Holt Road, Wrexham, from its junction with Greyhound roundabout, in a southerly direction for a total of 75 metres to enable O’Connor Utilities on behalf of Scottish Power to carry out Electrical Repairs in the footway. The closure will be in one-direction, with flow of traffic in a southerly direction towards Wrexham City Centre.
The alternative route for vehicles affected by the closure is via A5152 Bodhyfryd, A5152 Powell Road, A5152 Chester Road, A483 Junction 5 Gresford Interchange, A5152 Llan-y-Pwll Link Road, and A534 Holt Road which will be signposted accordingly. Pedestrian access will be maintained throughout the period of closure.
The prohibition is expected to last for 5 working days, or until completion of the works if earlier, with a maximum duration of 18 months.
Dated: 12.9.25
Darren Williams – Chief Officer, Environment & Technical
We welcome correspondence in Welsh. We will respond to any correspondence in Welsh which will not lead to a delay.
Open to feedback
From
12-Sept-2025
To
17-Sept-2025
Need to publish a public notice?
If you need to publish a public notice, please contact The Leader directly at: