Conway Cres Cent, Tonteg - Temporary Footpath Closure For Electrical Works
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(CILGANT CONWY, TON-TEG)
GORCHYMYN (CAU LLWYBR TROED DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf 7 diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y’i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau’r llwybr troed er mwyn cynnal gwaith t rydanol sy’n cynnwys gwaith cloddio.
Cau Llwybr Troed Dros Dro:
Effaith y Gorchymyn fydd cau’r rhan o’r llwybr troed s ydd o flaen Rhif 55 i 63, Cilgant Conwy.
Llwybr amgen i gerddwyr:
Ewch ar hyd Heol yr Eglwys, y llwybr troed rhwng Rhif 3 3 a 55 Cilgant Conwy, ac yna ar hyd Cilgant Conwy.
Bydd mynediad ar gael i gerbydau’r gwasanaethau brys, ac eiddo.
Fydd DIM mynediad i gerddwyr.
Mae disgwyl i’r llwybr troed fod ar gau rhwng y dyddiadau ac amseroedd canlynol neu hyd nes y bydd y gwaith wedi’i gwblhau: -
• Cau yn ystod y dydd rhwng 8am a 4pm ar 6-10 Hydref 2025.
Dyddiad 16 Medi 2025
Andrew Wilkins, Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol, 2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA C YNON TAFF COUNTY BORO UGH COUNCIL
(CONWAY CRES CENT, TONTEG)
(TEMPORARY FOOTPATH CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council, intends, not less than 7 days from the date of this Notice, to make an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to facilitate electrical works involving excavation.
Temporary Footpath Closure:
The effect of the Order will be to close that section of the footpath fronting No. 55 to 63 Conway Crescent.
Alternative Route for pedestrians:
Available via Church Road, the footpath between No. 33 and 55 Conway Crescent and Conway Crescent
Access will be maintained for emergency services and to premises.
Access WILL NOT be maintained for pedestrians
The closure is expected to be in operation between the following dates and times, or until such time as the works has been completed: -
• Daytime closure between 8:00am – 4:00pm 6th October – 10th October 2025
Dated 16th September 2025
Andrew Wilkins, Director of Legal and Democratic Services, 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: