Brighton and Hove - Temporary Traffic Restrictions due to Boundary Park Festival
What is happening?
national highways
A27 TRUNK ROAD – COLDEAN - HOUSEDEAN TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that National Highways Limited has made an Order on the A27 Trunk Road in the County of East Sussex and the Unitary Authority of the City of Brighton and Hove, under Section 14(1)(b) of the Road Traffic Regulation Act 1984, owing to the likelihood of danger to the public.
The effect of the Order is to impose:-
a 24-hour 50 mph speed restriction on the A27 –
a) eastbound between points approximately 700 metres and 1100 metres east of Ditchling Road overbridge; and
b) westbound between a point approximately 155 metres east of the South Downs Way overbridge (Housedean) and a point approximately 245 metres west of said overbridge; and
a 24-hour 40 mph speed restriction on the A27 –
a) eastbound between a point 1100 metres east of Ditchling Road overbridge and a point approximately 155 metres east of the South Downs Way overbridge (Housedean);
b) westbound between a point approximately 245 metres west of South Downs Way overbridge (Housedean) and a point approximately 700 metres east of Ditchling Road overbridge; and
c) the road leading to the eastbound carriageway of the A27, from a point approximately 260 metres measured eastbound along the road from the crossroad junction with Stony Mere Way to its merge with the main carriageway.
These measures are in the interests of road safety during the Boundary Park Festival and before and after as necessary.
The Order will come into force on 23rd September 2025 and have a maximum duration of eighteen months, expiring when the festival is over.
The temporary speed restrictions will be clearly indicated by traffic signs while it is in operation during the danger period.
I Rosendaal, an Official of National Highways Limited.
Ref: NH/SE/2025/A27/50
National Highways Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@nationalhighways.co.uk
How long will it take?
Planned start
23-Sept-2025
Estimated end
24-Sept-2025
Need to publish a public notice?
If you need to publish a public notice, please contact Brighton Argus directly at: