Ivor Park - Temporary Closure Due to Works to the Riverbank and Path Surface
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF (LLWYBR TROED 341 LLANTRISANT) GORCHYMYN (CAU DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf wedi gwneud Gorchymyn o dan Adran 14(1) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, a fydd yn para chwe mis ar y mwyaf. Effaith y Gorchymyn fydd cau'r rhan ganlynol o'r llwybr dros dro:
Cau Llwybr Troed Dros Dro Llwybr Troed 341 Llantrisant
Y rhan honno o'r llwybr troed sy'n cychwyn ym mhen dwyreiniol Parc Ivor (NGR ST 0334 8073) ac yn parhau i gyfeiriad cyffredinol y gogledd-ddwyrain am oddeutu 450 metr ac yn dod i ben wrth ei gyffordd â llwybr troed 322 Llantrisant (NGR ST 0362 8090) Yn ystod y cyfnod y bydd y llwybr troed ar gau, dylai'r cyhoedd ddefnyddio'r rhwydwaith priffyrdd presennol.
Fydd DIM mynediad ar gyfer cerbydau'r gwasanaethau brys Mae’r cau yn angenrheidiol er budd diogelwch y cyhoedd oherwydd gwaith sy’n cael ei wneud i lan yr afon ac arwyneb y llwybr Mae disgwyl i'r llwybr troed fod ar gau yn ystod y dyddiadau canlynol neu hyd nes y bydd y gwaith wedi'i gwblhau:
• O 27 Awst 2025 am gyfnod o 6 mis
Dyddiad 26 Awst 2025
Andrew Wilkins Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol 2 Llys Cadwyn, Stryd y Taf, Pontypridd, CF37 4TH.
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL (FOOTPATH 341 LLANTRISANT) (TEMPORARY CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council have made an Order under Section 14(1) of the Road Traffic Regulation Act 1984 which will have a maximum duration of six months. The effect of the Order will be to temporarily close the following section of path:-
Temporary Footpath Closure Footpath 341 Llantrisant
That part of the footpath commencing at the eastern end of Ivor Park (NGR ST 0334 8073) and proceeds in a general north-easterly direction for approximately 450 metres to terminate at its junction with Footpath 322 Llantrisant (NGR ST 0362 8090) During the period of the closure, the public should use the existing highway network.
Access for emergency services WILL NOT be maintained.
The closure is necessary in the interests of public safety due to works to the riverbank and path surface being undertaken The closure is expected to be in operation during the following dates, or until such time as the works have been completed
• From 27th August 2025 for a period of 6 months
Dated 26th August 2025
Andrew Wilkins Director of Legal and Democratic Services 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH.
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: