Tan y Graig, Temporary Road Closure Due To Utility Works
What is happening?
DEDDF RHEOLEIDDIOL TRAFFIG FFYRDD 1984 ADRAN 14(1)
Gorchymyn Cyngor Bwrdeistref Sirol Conwy
(Tan y Graig Llanrwst) (Gwaharddiad Dros Dro ar Draffig Trwodd) 2025
RHODDIR RHYBUDD fod Cyngor Bwrdeistref Sirol Conwy yn bwriadu gwneud Gorchymyn, ddim llai na saith niwrnod weld dyddiad y Rhybudd hwn, i wahardd unrhyw gerbyd rhag mynd ar hyd y darn hwnnw o Tan y Graig Llanrwst o’i chyffordd â Jones Terrace i gyffordd Heol Watling.
Mae angen y Gorchymyn er mwyn caniatáu gwaith gan Scottish Power. Caniateir mynediad i gerddwyr ac i’r gwasanaethau brys tra bydd y ffordd ar gau. Bydd y llwybr amgen ar hyd Heol Ddinbych, ymlaen i’r A470 ac yn ôl ar Tan Y Graig ac fel arall.
Daw’r Gorchymyn i rym ar 10 Medi 2025. Disgwylir y bydd y ffordd ar gau am gyfnod o ddim mwy na 12 diwrnod.
Dyddiedig 20 Awst 2025
M Georgiou
Pennaeth y Gyfraith a Llywodraethu
ROAD TRAFFIC REGULATION ACT 1984 SECTION 14(1)
Conwy County Borough Council
(Tan y Graig Llanrwst) (Temporary Prohibition of Through Traffic) Order 2025
NOTICE IS GIVEN that the Conwy County Borough Council intend not less than seven days from the date hereof to make an Order, the effect of which will be to prohibit vehicles to proceed in that length of Tan y Graig Llanrwst from its junction with Jones Terrace to the junction of Watling Street.
The Order is necessary to facilitate works by Scottish Power. Pedestrian and Emergency access will be maintained. The alternative route will be via Denbigh Street, on to the A470 and back onto Tan Y Graig and vice versa.
The Order comes into effect on 10 September 2025. It is anticipated that the road will be closed for a maximum period of 12 days.
Dated: 20 August 2025
M Georgiou
Head of Law and Governance
Blwch Post 1 / PO Box 1
Bae Colwyn Bay
LL29 0GG
Cyf/Ref: CCBC - 050027
How long will it take?
Planned start
10-Sept-2025
Estimated end
21-Sept-2025