Brynteg Street And Baldwin Street, Bryn - Temporary Road Closure For Highway Maintenance Works
What is happening?
NEATH PORT TALBOT COUNTY BOROUGH COUNCIL
CYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT
(BRYNTEG STREET AND LANE ADJACENT TO BALDWIN STREET, BRYN)
(TEMPORARY ROAD CLOSURE) ORDER 2025
NOTICE is hereby given that Neath Port Talbot County Borough Council intend in not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 (as amended).
The effect of the Order will be to temporarily prohibit vehicular traffic from proceeding along the length of road set out in the Schedule below whilst the Order is in force. During such periods as are indicated by traffic signs informing the public that the road is closed.
The Order is necessary to enable Openreach to carry out civil engineering works in the road and for the Highways Section to carry out any ancillary highway maintenance works resulting therefrom.
The Order will come into force on the 18th September 2025 and shall continue in force for a maximum duration of 18 months, or until the works are completed whichever is the sooner.
It is anticipated that the works will take 2 days to complete.
SCHEDULE
Brynteg Street will be closed from outside Property “Chrhianris” in an easterly direction for a distance 125m along its length.
Lane adjacent to 34 to 37 Baldwin Street will be closed from the side of 34 Baldwin Street in an easterly direction for a distance of 50m along its length.
The alternative route for vehicular traffic will be via Baldwin Street, Bryngurnos Street and Coronation Street.
Access for pedestrian and emergency vehicles will be maintained.
DATED 21st AUGUST 2025
M C GRIFFITHS, HEAD OF LEGAL AND DEMOCRATIC SERVICES