Barne, Permanent Waiting & Stopping Restrictions With New Zebra Crossing
What is happening?
LONDON BOROUGH OF BARNET
THE BARNET (FREE PARKING PLACES, LOADING PLACES, WAITING, LOADING AND STOPPING RESTRICTIONS) (AMENDMENT NO. 274) ORDER 2025
THE BARNET (CHARGED-FOR PARKING PLACES) (AMENDMENT NO.181) ORDER 2025
NOTICE IS HEREBY GIVEN that the Council of the London Borough of Barnet have made on the 14th August 2025 the above-mentioned Orders under Sections 6, 45, 46, 49 and 124 of and Schedule 9 to the Road Traffic Regulation Act 1984 and all other enabling powers.
The general effect of the Free Order will be to make permanent the provisions of The Barnet (Free Parking Places, Loading Places, Waiting, Loading and Stopping Restrictions) (Amendment No.241) Order 2024.
The general effect of the Charged-for Order will be to make permanent the provisions of The Barnet (Charged-for Parking Places) (Amendment No.152) Order 2024.
The above mentioned Orders, which all came into operation on the 19th February 2024, introduced on an experimental basis, the following measures below:
In order to deter obstruction, improve traffic flow and general road safety the general effect of the Free Order will be on an experimental basis introduce the following measures below:
(a) upgrade lengths of existing waiting restrictions operating 8am to 5pm Monday to Friday on both side of Nether Street N12 between the junctions of Essex Park and Moss Hall Grove to operate ‘at any time’.
(b) extend the existing ‘at any time’ waiting restrictions on both side of Bellevue Road at the junction of The Crescent N11 by approximately 3 metres.
(c) upgrade and extend the existing waiting restrictions operating 8am to 9.30am and 2.30pm to 4.30pm Monday to Friday at the junction of Bellevue Road and Holly Park Road N11 to operate ‘at any time’.
In order to improve access and general road safety the length of the existing No Stopping restrictions operating 8am to 4.15pm Monday to Friday outside Childs Hill School on Greenfield Gardens NW2, will be extended. As a result of the No Stopping restrictions being introduced the general effect of the Charged-for will be on an experimental basis will remove two resident permit holders only parking bays operating 10am to 11am Monday to Friday outside Childs Hill Primary School on Greenfield Gardens NW2.
NOTICE IS HEREBY GIVEN that the London Borough of Barnet in exercise of powers conferred by Section 23 of the Road Traffic Regulation Act 1984, intends to install Zebra Crossing on Nether Street N12 outside and opposite No.181 to No.189 Nether Street.
As a result of the Zebra Pedestrian Crossing being introduced on Nether Street N12 outside and opposite No.181 to No.189 Nether Street, the general effect of the Free Order will be to remove existing lengths of waiting restrictions operating ‘at any time’. A length of No Stopping restrictions operating 8am to 5pm Monday to Friday outside No.189 Nether Street N12, will also be removed.
A copy of the Orders, which will come into operation on Saturday 16th August 2025 and the Council’s Statement of Reasons for making the Orders can be obtained, for a period of 6 weeks from the date on which this notice is published, by emailing parking.consultations@barnet.gov.uk or by writing to the Design Team, Highways Section, 6th Floor, 2 Bristol Avenue, Colindale, London NW9 4EW.
Any person wishing to question the validity of the Orders or any of its provisions on the grounds that they are not within the relevant powers of the Road Traffic Regulation Act 1984 or that any of the relevant requirements thereof or any regulations made there under have not been complied with in relation to the Orders may, within six weeks of the date on which the Orders was made, make application for the purpose to the High Court.
Dated 14th August 2025
Ian Edser
Director of Highways and Transportation, Environment Directorate
Open to feedback
From
14-Aug-2025
To
25-Sept-2025
Need to publish a public notice?
If you need to publish a public notice, please contact Barnet Borough Times directly at: