Temporary Restriction of Vehicular Traffic Order 2025

Westwood Lane, Sutherland Avenue, Ingleton Avenue, Groombridge Close, Wendover Way, Welling - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE, that to enable highway improvement works by a council contractor on behalf of the London Borough of Bexley they intend to make an Order the effects of which will be the introduction of:

    • Prohibition of traffic (Road Closure) in Westwood Lane from outside 268 to the side of 656 East Rochester Way, Sidcup

    • Prohibition of traffic (Road Closure) in Sutherland Avenue at the junction with Westwood Lane, Welling preventing ingress and egress to Westwood Lane, Welling

    • Prohibition of traffic (Road Closure) in Ingleton Avenue at the junction with Westwood Lane, Welling preventing ingress and egress to Westwood Lane, Welling

    • Prohibition of traffic (Road Closure) in Groombridge Close at the junction with Westwood Lane, Welling preventing ingress and egress to Westwood Lane, Welling

    • Prohibition of traffic (Road Closure) in Wendover Way at the junction with Westwood Lane, Welling preventing ingress and egress to Westwood Lane, Welling

    • No waiting no loading (Parking Restrictions) as detailed in schedule one of this order

  2. The Order will come into effect on 27 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 4 days.

  3. Whilst the works are in progress alternative routes will be via,

    • Westwood Lane

    • Blackfen Road, Danson Underpass, Danson Road, Park View Road, Welling High Street, Bellegrove Road and reverse

    • Blackfen Road, Wellington Avenue, The Oval, Wilsley Avenue, Halfway Street, Hurst Road, Penhill Road, Danson Underpass, Danson Road, Park View Road, Welling High Street, Bellegrove Road, Westwood Lane

    • Localised diversions to be signposted as and when required

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Schedule One

Westwood Lane, Welling both sides of carriageway from outside 268 to side of 656 East Rochester Way, Sidcup

Sutherland Avenue, Welling both sides of carriageway at the junction with Westwood Lane, Welling

Ingleton Avenue, Welling both sides of carriageway at the junction with Westwood Lane, Welling

Groombridge Close, Welling both sides of carriageway at the junction with Westwood Lane, Welling

Wendover Way, Welling both sides of carriageway at the junction with Westwood Lane, Welling

Temporary Restriction of Vehicular Traffic Order 2025

The Park, Sidcup - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable highway improvement works by a council contractor on behalf of London Borough of Bexley the effects of which will be the introduction of:

    • Prohibition of traffic (Road Closure) in The Park from the junction with Carlton Road to the Junction with Elm Road, Sidcup

    • No waiting no loading (Parking Restrictions) in The Park from the junction with Carlton Road to the Junction with Elm Road, Sidcup

  2. The Order will come into effect on 18 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 3 days.

  3. Whilst the works are in progress alternative routes will be provided via,

    • Carlton Road, Elm Road and reverse

    • Chislehurst Road, 4th Exit at roundabout, Chislehurst Road, Elm Road, Carlton Road

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford

Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: John Stevens, Highways and Amenity Services, Civic Offices, Bexleyheath (Tel. No. 020 3045 4545)

Temporary Restriction of Vehicular Traffic Order 2025

Cumberland Avenue and Buckingham Avenue, Welling

Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable JDT Utilities Ltd on behalf of Southern Gas Networks to undertake their Gas Mains Replacement works, the effects of which will be the introduction of:

    • Prohibition of traffic on Cumberland Avenue at the junction with Buckingham Avenue, Welling

    • Prohibition of traffic on Cumberland Avenue at the junction with Northumberland Avenue, Welling

    • Prohibition of traffic on Buckingham Avenue from outside 30 to The Green, Welling

    • Waiting restriction and Loading prohibition Buckingham Avenue from No. 30 to the junction with The Green (both sides of the carriageway)

    • Waiting restriction and Loading prohibition on Cumberland Avenue from the junction with Northumberland Avenue to junction with Buckingham Avenue, Welling (both sides of the carriageway)

    • Restrictions to be removed when not required.

  2. The Order will come into effect on 14 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 6 weeks.

  3. Whilst the works are in progress alternative routes will be provided via:

    • Cumberland Avenue Diversion

    ? Hook Lane, Westwood Lane, Northumberland Avenue, and reverse

    • Buckingham Avenue Diversion

    ? The Green, Hook Lane, Yorkland Avenue, and reverse

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: Southern Gas Networks – 07583 020235

Temporary Restriction of Vehicular Traffic Order 2025

Orchard Avenue and Barnfield Road, Belvedere - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that, to enable Forefront Utilities on behalf of Southern Gas Networks to undertake their Gas Mains Replacement works, they intend to make an Order the effects of which will be the introduction of:

    • Prohibition of traffic on Orchard Avenue, Belvedere – the entire length

    • Prohibition of traffic on Barnfield Road, Belvedere, from the junction with Nuxley Road to the junction with Harold Avenue, Belvedere

    • Waiting restriction and Loading prohibition in Orchard Avenue, Belvedere – entire length of the carriageway, both sides of the road.

    • Waiting restriction and Loading prohibition in Barnfield Road, Belvedere – entire length of the carriageway, both sides of the road.

  2. The Order will come into effect on 25 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 4 weeks.

  3. Whilst the works are in progress alternative routes will be via:

    • Orchard Avenue, Belvedere

    ? Barnfield Road, Woolwich Road, Avenue Road and reverse

    ? King Harold’s Way, Bedonwell Road, Orchard Avenue

    • Barnfield Road, Belvedere

    ? Nuxley Road, Albert Road, Woolwich Road, Harold Avenue

    ? Nuxley Road, Bedonwell Road, Osbourne Road, Harold Avenue

    ? Nuxley Road, Picardy Road, Clovelly Road, Bedonwell Road, Nuxley Road

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: Southern Gas Networks – 0800 912 1700

Temporary Restriction of Vehicular Traffic Order 2025

Durham Road, Lincoln Road, Sussex Road, Warwick Road, Sidcup

Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that, to enable highway improvement works by a Council contractor on behalf of London Borough of Bexley, they intend to make an Order the effects of which will be the introduction of:

    • Prohibition of traffic (Road Closure) in Durham Road at the junction with Warwick Road, Sidcup

    • Prohibition of traffic (Road Closure) in Lincoln Road at the junction with Warwick Road, Sidcup preventing ingress and egress to Warwick Road, Sidcup

    • Prohibition of traffic (Road Closure) in Sussex Road at the junction with Warwick Road, Sidcup preventing ingress and egress to Warwick Road, Sidcup

    • Prohibition of traffic (Road Closure) in Warwick Road from the junction with Durham Road to the junction with Oxford, Sidcup

    • No waiting no loading as detailed in schedule one of this order

  2. The Order will come into effect on 21 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 2 days.

  3. Whilst the works are in progress alternative routes will be via,

    • Warwick Road diversion

    ? Sidcup Hill, Oxford Road and reverse

    • Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  4. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: John Stevens, Highways and Amenity Services, Civic Offices, Bexleyheath (Tel. No. 020 3045 4545)

Schedule One

Durham Road, Sidcup both sides of carriageway at the junction with Warwick Road, Sidcup

Lincoln Road, Sidcup both sides of carriageway at the junction with Warwick Road, Sidcup

Sussex Road, Sidcup both sides of carriageway at the junction with Warwick Road, Sidcup

Warwick Road, Sidcup both sides of carriageway from the junction with Durham Road to the junction with Oxford Road, Sidcup

Temporary Restriction of Vehicular Traffic Order 2025

Foots Cray Lane, Canterbury Avenue, Sidcup - Notice of Making an Order

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable highway improvement works by a council contractor on behalf of London Borough of Bexley the effects of which will be the introduction of:

    • Prohibition of traffic (Road Closure) in Foots Cray Lane from outside 300 to the junction with Eynsford Crescent, Sidcup

    • Prohibition of traffic (Road Closure) in Canterbury Avenue at the junction with Foots Cray Lane, Sidcup

    • No waiting no loading (Parking Restrictions) as detailed in schedule one of this order

  2. The Order will come into effect on 20 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 4 days.

  3. Whilst the works are in progress alternative routes will be provided via

    • Hurst Road, Halfway Street, Avery Hill Road, Foots Cray Road, Main Road, Station Road, Hatherley Road and reverse

    • Faraday Avenue, Hatherley Crescent, Station Road, Elm Road, Chislehurst Road, 4 exit on roundabout Chislehurst Road, Elm Road then join Hurst Road diversion

    • Access to Canterbury Avenue via Hurst Road, Sidcup

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: John Stevens, Highways and Amenity Services, Civic Offices, Bexleyheath (Tel. No. 020 3045 4545)

Schedule One

Foots Cray Lane, Sidcup both sides of carriageway, from outside 300 to the junction with Eynsford Crescent, Sidcup

Canterbury Avenue, sidcup both sides of carriageway at the junction with Foots Cray Lane

Temporary Restriction of Vehicular Traffic Order 2025

Slade Green Road, Erith - Notice of Intention

  1. The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE, that to enable highway improvement works by a Council contractor on behalf of London Borough of Bexley, they intend to make an Order the effects of which will be the introduction of:

    • Prohibition of traffic on Slade Green Road, Erith from the junction with Bridge Road to the junction with Hazel Road, Slade Green Road, Erith

    • Waiting restriction and Loading prohibition in Slade Green Road, Erith, from the junction with Bridge Road to the junction with Hazel Road, Slade Green Road, Erith

  2. The Order will come into effect on 26 August 2025 and is valid for a period of 18 months. However, the works are expected to be completed within 6 days.

  3. Whilst the works are in progress alternative routes will be via:

    • Bridge Road, Northend Road, South Road Queens Road, James Watt Way, Manor Road, Slade Green Road, and reverse

    • Cedar Road, Forest Road, Bridge Road, Northend Road, South Road, Queens Road, James Watt Way, Manor Road, Slade Green Road, and reverse

    • Northend Road, Southend roundabout roundabout, Northend Road northbound , South Road, Queens Road, James Watt Way, Manor Road, Slade Green Road and reverse

  4. Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.

  5. The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.

Andrew Bashford, Head of Highways, Traffic and Infrastructure

Dated: 13 August 2025

Further enquiries in respect of this notice should be addressed to: London Borough of Bexley, Area Team North – 020 8303 7777

Need to publish a public notice?

If you need to publish a public notice, please contact Bromley News Shopper directly at:

se-sales@localiq.co.uk

01268 522792

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 42 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association