Brook Street, Porth - Temporary Road Closure For Works To A Retaining Wall
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(STRYD Y NANT, PORTH)
GORCHYMYN (CAU FFORDD DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf 7 diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y’i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau’r ffordd ar gyfer gwaith ar wal gynnal.
Effaith y Gorchymyn fydd cau Stryd y Nant, o fan sy’n 20 metr i’r gogledd o’i chyffordd â Heol Coedcae yr A4058, tua’r gogledd-orllewin i’w chyffordd â Stryd Britannia.
Llwybr Amgen – ar gael ar hyd Stryd Britannia a Heol Eirw, yr A4058 Heol Coedcae.
Fydd DIM mynediad i gerddwyr.
Bydd mynediad ar gael i gerbydau’r gwasanaethau brys ac i bob eiddo.
Mae disgwyl i’r ffordd fod ar gau rhwng y dyddiadau a’r amseroedd canlynol, neu hyd nes y bydd y gwaith wedi’i gwblhau:-
• Cau’r ffordd yn gyfan gwbl rhwng 18 Awst a 31 Hydref 2025.
Dyddiad 5 Awst 2025
Andrew Wilkins, Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol, 2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(BROOK STREET, PORTH)
(TEMPORARY ROAD CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council, intends, not less than 7 days from the date of this Notice, to make an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to facilitate works to a retaining wall.
The effect of the Order will be to close Brook Street, from a point 20 metres north-west of its junction with A4058 Coedcae Road, north-westwards to its junction with Britannia Street.
Alternative Route – available via Britannia Street, Eirw Road and A4058 Coedcae Road
Access WILL NOT be maintained for pedestrians
Access will be maintained for emergency services and to premises
The closure is expected to be in operation between the following dates and times, or until such time as the works has been completed: -
• Full closure from 18th August – 31st October 2025
Dated 5th August 2025
Andrew Wilkins, Director of Legal and Democratic Services, 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH