Bryn Road, Bryn Village, Abergavenny - Temporary Overbridge And Footway Closure
What is happening?
CYNGOR SIR FYNWY
HYSBYSIAD RHEOLEIDDIO TRAFFIG DROS DRO
ADRAN 14 - DEDDF RHEOLEIDDIO TRAFFIG FFORDD 1984
CYNGOR SIR FYNWY
(C24.12 HEOL BRYN, CAU TROSBONT A LLWYBR TROED PENTREF BRYN, SIR FYNWY)
HYSBYSIAD RHEOLEIDDIO TRAFFIG DROS DRO 2025
HYSBYSIR DRWY HYN bod CYNGOR SIR FYNWY, Neuadd y Sir, y Rhadyr, Brynbuga, NP15 1GA (“y Cyngor”) yn bwriadu gwneud Gorchymyn yn unol â’r pwerau a roddwyd gan Adran 14(1)(a) o Ddeddf Rheoleiddio Traffig Ffyrdd 1984:
1. Daw’r Gorchymyn i rym ar 18fed Awst 2025 a bydd yn parhau i fod mewn grym am gyfnod nad yw’n fwy na 18 mis neu nes bod y gwaith y bwriedir ei wneud wedi’i gwblhau, pa un bynnag sydd gynharaf. Rhagwelir y bydd y gwaith yn cael ei gwblhau rhwng 18fed Awst 2025 a’r 31ain Rhagfyr 2025. Sylwch mai dim ond am 1 noson y bydd y Trosbont ar gau a disgwylir cau’r trosbont ar 31 Hydref gan weithio rhwng 20:00 a 05:00.
2. Mae’r Gorchymyn yn angenrheidiol i ganiatáu i Asiantaeth Cefnffyrdd De Cymru ymgymryd â chynllun adnewyddu Trosbont Pentref Bryn yr A40, gan gynnwys gwneud gwaith gwrth-ddŵr, ailosod cymal ehangu, ail-wynebu a phrofi concrit mewn modd diogel yn y lleoliad. Cedwir mynediad rhesymol ar gyfer eiddo sydd ar hyd y ffyrdd a effeithir arnynt tra y bydd yr heol ar gau
3. Effaith y Gorchymyn fydd:
18/08/2025 - 31/12/2025.
I. Cau un llwybr troed dros dro ar y tro ar y C24.12 Heol Bryn Road, Cau Llwybr Troed y Trosbont, Y Fenni, Sir Fynwy, ~137m o’r gyffordd â’r B4598. Cynhelir Mynediad i Gerddwyr bob amser gan y bydd un llwybr troed yn aros ar agor ac ar gael i gerddwyr ei ddefnyddio.
31/10/2025 gan weithio 20:00 – 05:00.
II. Cau dros dro y C24.12 Heol Bryn Road, Cau Llwybr Troed y Trosbont, Y Fenni, Sir Fynwy, ~45m o’r gyffordd â’r B4598 am ~175m.
4. Ni fydd llwybr dargyfeirio tra bydd y Trosbont ar gau - bydd mynediad yn cael ei gynnal gan weithwyr ar y safle.
5. Gellir enwi’r Gorchymyn hwn fel Gorchymyn Rheoleiddio Traffig Dros Dro C24.12 Ffordd Bryn, Cau Trosbont a Phont Droed Pentref Bryn, Y Fenni, y Fenni, Sir Fynwy 2025.
6. Yn sgil Adran 16(1) Deddf Rheoleiddio Traffig Ffordd 1984 bydd person sy’n torri cyfyngiad neu waharddiad a osodir dan Adran 14 y Ddeddf yn euog o drosedd.
Dyddiad: 30ain Gorffennaf 2025
Carl Touhig
Pennaeth Gwasanaethau Cymdogaeth
Cyngor Sir Fynwy
Blwch SP 106
Cil-y-coed
Sir Fynwy
NP26 9AN
MONMOUTHSHIRE COUNTY COUNCIL
TEMPORARY TRAFFIC REGULATION NOTICE
SECTION 14 - ROAD TRAFFIC REGULATION ACT 1984
MONMOUTHSHIRE COUNTY COUNCIL
(C24.12 BRYN ROAD, BRYN VILLAGE OVERBRIDGE AND FOOTWAY CLOSURE, ABERGAVENNY, MONMOUTHSHIRE)
TEMPORARY TRAFFIC REGULATION NOTICE 2025
NOTICE IS HEREBY GIVEN that MONMOUTHSHIRE COUNTY COUNCIL of County Hall, The Rhadyr, Usk, NP15 1GA (“the Council”) Intends to make an order pursuant to the powers conferred by Section 14(1)(a) of the Road Traffic Regulation Act 1984
1. The Order shall come into operation on the 18th August 2025 and will continue to be in force for a period not exceeding 18 months or until the works which it is proposed to carry out have been completed, whichever is the earlier. It is anticipated that the works will be completed between 18th August 2025 and 31st December 2025. Please note that the Overbridge will only be closed for 1 night, the overbridge closure is anticipated to commence on the 31st of October operating 20:00 – 05:00.
2. The order is necessary to allow SWTRA to undertake a bridge desk refurbishment scheme to A40 Bryn Village Overbridge Comprising of Waterproofing, expansion joint replacement, resurfacing and concrete testing to take place in a safe manner at the location. Reasonable access will be maintained for properties fronting the affected lengths of road during the period of the closure.
3. The effect of the order will be: 18/08/2025 - 31/12/2025.
I. To temporarily close one footway at a time on the C24.12 Bryn Road, Overbridge Footway Closure, Abergavenny, Monmouthshire, ~137m from its junction with B4598. Pedestrian Access will be maintained at all times as one footway will remain open and available for pedestrians to use.
31/10/2025 operating 20:00 – 05:00.
II. To temporarily close the C24.12 Bryn Road, Bryn Village Overbridge, Abergavenny, Monmouthshire, ~45m from its junction with B4598 for ~175m.
4. There will be no signed diversion route in place whilst the Overbridge is closed, access will be maintained by operatives on site.
5. This order may be cited as the C24.12 Bryn Road, Bryn Village Overbridge and Footway Closure, Abergavenny, Monmouthshire Temporary Traffic Regulation Order 2025
6. By virtue of Section 16(1) of the Road Traffic Regulation Act 1984 a person who contravenes a restriction or prohibition imposed under Section 14 of the Act shall be guilty of an offence.
Dated: 30th July 2025
Carl Touhig
Head of Neighbourhood Services
Monmouthshire County Council
PO Box 106
Caldicot
Monmouthshire
NP26 9AN