Foundry Street, St Helens - Temporary Suspension of Loading Bay and Introduction of Shared Use Permit Holders and Loading Bay
What is happening?
Public Notice
THE COUNCIL OF THE BOROUGH OF ST. HELENS
FOUNDRY STREET, ST HELENS
(TEMPORARY SUSPENSION OF LOADING BAY) (TEMPORARY INTRODUCTION OF SHARED USE PERMIT HOLDERS AND LOADING BAY) ORDER 2025
NOTICE IS HEREBY GIVEN that the St. Helens Borough Council made an order under the provisions of Section 14(1) of the Road Traffic Regulation Act 1984 (as Amended), the effect of which will be to:
-
The lengths of road and restrictions specified in Schedule 1 to this Order are hereby suspended from Schedule 2 of The Council of the Borough of St Helens (Prohibition of Waiting and Loading and Provision of Parking) Consolidation Order 2025.
-
No person shall cause or permit any vehicle other than a vehicle displaying a relevant permit (referenced PSMT) during the days and hours of operation of the shared use permit holders and loading bay as specified in Schedule 2 to this Order.
-
No person shall cause or permit any vehicle other than a vehicle requiring to load or unload goods to or from that vehicle during the days and hours of operation of the shared use permit holders and loading bay as specified in Schedule 3 to this Order.
SCHEDULE 1 - ITEMS TO BE SUSPENDED
Item | USRN | Street | Area | Side of Road | From | To | Restriction |
---|---|---|---|---|---|---|---|
1091 | 37504313 | Foundry Street Service Road To Rear Of 2 To 10 Church Square | St Helens | West side | a point 38 metres north of its junction with Foundry Street | a point 53 metres north of its junction with Foundry Street | Loading Bay |
SCHEDULE 2 - INTRODUCTION OF NO WAITING AT ANY TIME EXCEPT PERMIT HOLDERS
(Referenced PSMT)
Street | Side of Road | From | To | Operational Days | Operational Times |
---|---|---|---|---|---|
Foundry Street Service Road To Rear Of 2 To 10 Church Square | West side | a point 38 metres north of its junction with Foundry Street | a point 53 metres north of its junction with Foundry Street | All days | 8am - 8pm |
SCHEDULE 3 - INTRODUCTION OF NO LOADING/UNLOADING AT ANY TIME
Street | Side of Road | From | To | Operational Days | Operational Times |
---|---|---|---|---|---|
Foundry Street Service Road To Rear Of 2 To 10 Church Square | West side | a point 38 metres north of its junction with Foundry Street | a point 53 metres north of its junction with Foundry Street | All days | 8pm - 8am the following day |
This Order shall come into operation on the 28th July 2025 and shall continue for a maximum duration of 18 months or the earlier completion of the works proposed.
The reason for making this Order is to safely enable the town centre improvement works.
Dated this 24th day of July 2025.
S Walker, Head of Highways and Infrastructure, Place Services
Place Services – Traffic Engineering
Town Hall
Corporation Street
St Helens WA10 1HP
How long will it take?
Planned start
28-Jul-2025
Estimated end
28-Jan-2027