Multiple Roads, Norfolk - Multiple Traffic Notices, Temporary Road Closures due to Maintenance and Utility Works
What is happening?
Norfolk County Council
TEMPORARY TRAFFIC REGULATION ORDERS 2025
Road Traffic Regulation Act, 1984
Norfolk County Council in exercise of its powers under Section 14(1) of the Road Traffic Regulation Act 1984, hereby give notice that:
i) THEY PROPOSE TO MAKE Temporary Traffic Regulation Orders in respect of the following roads:
AYLSHAM – 5F172 Neale Close To Holman Road to facilitate gas main replacement works from 23rd June to 11th July 2025 (may continue until 22nd August 2025). Alternative route is via: Holman Road, Partridge Road, Partridge Road To Neale Close, Neale Close. The works promoter is Cadent.
AYLSHAM – C593 Blicking Road from its junction with Heydon Road to its junction with Petersons Lane to facilitate pole testing works between 09:30 and 15:00 on 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: Blickling Road, Aylsham Road, B1149 Link Road Roundabout/Link Road/Norwich Road/Holt Road, B1145 Cawston Road/Henry Page Road, Norwich Road, Penfold Street (Corpusty and Saxthorpe, Aylsham, Heydon, Itteringham, Blickling, Cawston, Oulton). The works promoter is BT.
BACONSTHORPE – C300 The Street from its junction with C300 Plumstead Road for 320m westwards to facilitate pole testing works between 09:30 and 15:30 on 25th June 2025 (may continue until 6th August 2025).
Alternative route is via: The Street, Plumstead Road, Baconsthorpe Road, Cherry Tree Road, Church Street, Matlaske Road, Saxthorpe Road, B1149 Briston Road/Norwich Road/The Green/Holt Road, A149 Holt Bypass, Hempstead Road (Matlaske, Edgefield, Little Barningham, Plumstead, Corpusty and Saxthorpe, Hempstead, Itteringham, Holt, Baconsthorpe). The works promoter is BT.
BACONSTHORPE – U14317 Stonefield Lane from its junction with C300 The Street for 135m eastwards to facilitate pole testing works between 09:30 and 15:00 on 25th June 2025 (may continue until 6th August 2025).
Alternative route is via: Stonefield Lane, Gresham Road, Green Lane, Barningham Road, Bessingham Road, Matlaske Road, Church Street, Cherry Tree Road, Baconsthorpe Road, Plumstead Road, The Street (Matlaske, Plumstead, Baconsthorpe). The works promoter is BT.
CAWSTON – B1149 Holt Road from its junction with B1145 Holt Road roundabout to its junction with Buxton Road to facilitate surfacing and lining works between 19:00 and 05:00 from 24th to 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: B1145 Aylsham Road/Cawston Road/Henry Page Road, A140 Norwich Road/Cromer Road, A1270 Broadland Northway, B1149 Brewery Lane/Holt Road (Marsham, Felthorpe, Hevingham, Horsford, Stratton Strawless, Aylsham, Horsham St. Faith and Newton St. Faith, Cawston, Hainford, Haveringland). The works promoter is Norfolk County Council.
FLEGGBURGH – C457 Tower Road from its junction with U62277 Orchard Way for 240m eastwards to facilitate new duct installation works from 23rd to 27th June 2025 (may continue until 8th August 2025). Alternative route is via: Tower Road, Rollesby Road, Town Road, A1064 Main Road, Tower Road. The works promoter is CityFibre Metro Networks Ltd.
GREAT YARMOUTH – Queen Street from its junction with Greyfriars Way for 75m westwards to facilitate gas connection works from 23rd to 24th June 2025 (may continue until 5th August 2025). Alternative route is via: Greyfriars Way, Yarmouth Way, South Quay. The works promoter is Cadent.
HEYDON – B1149 Holt Road from its junction with C477 Valley Road to its junction with C228 Heydon Road to facilitate stud and lining replacement works between 19:00 and 05:00 from 24th to 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: B1145 Holt Road, B1145 Aylsham Road, B1145 High Street, B1145 Cawston Road, B1145 Heydon Road, B1145 Station Road, B1145 Dereham Road, B1145 Bawdeswell Road, B1145 Reepham Road, B1145 Norwich Road, A1067 Fakenham Road, A1067 Norwich Road, B1110 Holt Road, B1354 Briston Road, B1149 Link Road Roundabout, B1149 Link Road, B1149 Norwich Road (Bawdeswell, Twyford, Briningham, Guist, Hindolveston, Salle, Corpusty and Saxthorpe, Swanton Novers, Foxley, Reepham, Bintree, Wood Norton, Melton Constable, Cawston, Briston). The works promoter is Norfolk County Council.
NB: Please note only one of the above dates will be required.
ITTERINGHAM – Mannington Hall Road from 387m west of its junction with Itteringham Road for 100m westwards to facilitate tree removal works between 08:00 and 18:00 on 23rd June 2025 (may continue until 4th August 2025). Alternative route is via: Mannington Hall Road, Matlaske Road, The Street, Itteringham Road (Little Barningham, Itteringham, Wickmere). The works promoter is Feeney’s Tree Services.
LINGWOOD AND BURLINGHAM – Chapel Road from its junction with Post Office Road for 40m southwards to facilitate new service connection works between 09:30 and 15:30 on 23rd June 2025 (may continue until 4th August 2025). Alternative route is via: Chapel Road, Blofield Road, Heater Lane, Lingwood Road, Church Road, School Road, Station Road, Norwich Road. The works promoter is BT.
NEATISHEAD – King Street from 160m west of its junction with U19628 Water Lane for 50m westwards to facilitate sluice valve repair works from 24th to 26th June 2025 (may continue until 7th August 2025). Alternative route is via: King Street, Water Lane, Long Road, Hall Road, Irstead Road, The Street, School Lane, School Road, King Street (Barton Turf, Neatishead). The works promoter is Anglian Water.
NORTH WALSHAM – A149 North Walsham Bypass from its junction with B1150 Norwich Road to its junction with C397 Whitegate Road to facilitate surface dressing, main dressing and lining and stud replacement works from 26th June to 13th July 2025 only whilst signs indicating closures are in place (may continue until the 30th January 2026).
Alternative route is via: A149 North Walsham Bypass, A149 Yarmouth Road, A149 Norwich Road/Wayford Road, B1159 Stepping Stone Lane/Stalham Road, B1159 Coast Road, B1159 Walcott Road, B1159 Coast Road, B1159 Paston Road, B1159 Bacton Road, C634 Bacton Road, C634 Mundesley Road, C634 Stow Hill, C634 Paston Road, C635 Water Lane, B1145 Knapton Road, B1145 Mundesley Road, B1145 North Walsham Road, B1145 Knapton Road, B1145 The Street, B1145 North Walsham Bypass, A149 North Walsham Bypass (East Ruston, Stalham, Dilham, Swafield, Paston, Smallburgh, Bacton, Brumstead, Mundesley, Worstead, Walcott, North Walsham, Knapton).
The works promoter is Norfolk County Council.
NB: Phase 1 anticipated to be between 19:00 and 05:00 from 26th to 27th June, Phase 2 anticipated to be between 19:00 and 05:00 from 28th to 29th June 2025, Phase 3 anticipated to be between 19:00 and 05:00 from 12th to 13th July 2025.
OULTON – C271 Church Lane from its junction with Marlpit Lane for 300m westwards to facilitate pole testing works on 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: Church Lane, The Street, Oulton Street, B1149 Holt Road, Spinks Lane (Heydon, Cawston, Oulton). The works promoter is BT.
REEPHAM – U57043 Back Street/Church Street from its junction with School Road to its junction with Church Hill to facilitate new fibre network installation works from 26th June to 4th July 2025 (may continue until 15th August 2025).
Alternative route is via: School Road, Market Place, Church Hill. The works promoter is CityFibre Metro Networks Ltd.
REEPHAM – U57283 Orchard Lane from its junction with The Moor for 110m northwards to facilitate installation of new fibre network for BDUK from 23rd to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: Orchard Lane, B1145 Cawston Road/Station Road, New Road, The Moor. The works promoter is CityFibre Metro Networks Ltd.
SHERINGHAM – Curtis Lane from 34m south of its junction with Nelson Road for 45m southwards to facilitate electrical substation works from 23rd to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: Curtis Lane, Avenue South, The Avenue, Nelson Road. The works promoter is UK Power Networks.
SPIXWORTH – U57058 Park Road from its junction with Buxton Road to its junction with Giles Road to facilitate drainage works from 23rd June to 26th June 2025.
September 2025 (may continue until 22nd December 2026).
Alternative route is via: Buxton Road, Arthurton Road, Giles Road. The works promoter is Norfolk County Council.
SPROWSTON – C256 Blue Boar Lane from its junction with Linacre Avenue to its junction with Salhouse Road to facilitate highway drainage survey works between 19:00 and 07:00 from 23rd to 28th June 2025 (may continue until 9th August 2025).
Alternative route is via: Blue Boar Lane, A1151 Wroxham Road, A1042 Mousehold Lane, Salhouse Road. The works promoter is Norfolk County Council.
SPROWSTON – 5F195 Linked Footpath to Blithewood Gardens from 61m south of its junction with Blithewood Gardens for 20m southwards to facilitate gas connection works from 23rd to 25th June 2025 (may continue until 6th August 2025).
Alternative route is via: Linked Footpath to Blithewood Gardens, Falcon Road to Blithewood Gardens, Blithewood Gardens. The works promoter is Cadent.
TAVERHAM – A1067 Fakenham Road from its junction with C262 Beech Avenue to its junction with U51202 Windsor Chase to facilitate stud removal and surface dressing works between 07:00 and 15:00 on the 22nd June 2025 (may continue until 10th August 2025).
Alternative route is via: A1067 Fakenham Road, A1270 Broadland Northway, A140 Holt Road/Cromer Road/Boundary Road, A1067 Drayton High Road/Fakenham Road. (Hellesdon, Horsford, Drayton, Horsham St. Faith and Newton St. Faith, Taverham, Attlebridge).
The works promoter is Norfolk County Council.
THURSFORD & FULMODESTON – B1354 Melton Road from its junction with U14055 Brick Kiln Road to its junction with U14018 The Street to facilitate stud and lining works between 19:00 and 05:00 from 23rd to 25th June 2025 (may continue until 8th August 2025).
Alternative route is via: B1354 Melton Road, B1110 Dereham Road, B1110 Holt Road, B1110 The Street, B1110 Thornage Road, A148 Norwich Road, A148 Letheringsett Hill, A148 Fakenham Road (Fulmodeston, Gunthorpe, Letheringsett with Glanford, Briningham, Thornage, Brinton, Holt, Thursford, Stody).
The works promoter is Norfolk County Council.
TUNSTEAD – Market Street from 220m southeast of its junction with Wateringpit Lane for 60m south eastwards to facilitate works to rectify railway track faults between 23:00 on 22nd June and 05:00 on 23rd June 2025 (may continue until 4th August 2025).
Alternative route is via: Market Street, Tunstead Road, B1150 North Walsham Road/Church Street/Station Road/High Street/Norwich Road/North Walsham Road, A1270 Broadland Northway, A1151 Wroxham Road/Norwich Road/Stalham Road, B1354 Tunstead Road, Tunstead Road, Market Street (Sloley, Horstead with Stanninghall, Salhouse, Beeston St. Andrew, Hoveton, Rackheath, Spixworth, Coltishall, Wroxham, Crostwick, Scotton, Tunstead).
The works promoter is Network Rail Infrastructure Ltd.
TUNSTEAD – Tunstead Road from its junction with B1150 Church Street for 600m south eastwards to facilitate new duct installation works from 23rd June to 6th July 2025 (may continue until 17th August 2025).
Alternative route is via: B1150 Church Street/North Walsham Road, Tunstead Road, Market Street, Sco Ruston Road, Tunstead Road (Sloley, Scottow, Tunstead). The works promoter is CityFibre Metro Networks.
WORSTEAD – C495 Station Road from 720m south of its junction with C274 Westwick Road for 60m southwards to facilitate works to remove faults on the level crossing between 22:00 on 23rd June and 05:00 on 24th June 2025 (may continue until 5th August 2025).
Alternative route is via: Station Road, Westwick Road, Church Plain, Front Street, Sloley Road, High Street, Sloley Road, Low Street, Station Road (Sloley, Worstead). The works promoter is Network Rail Infrastructure Ltd.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
ALPINGTON – U76372 Burgate Lane from its junction with U76373 Reeders Lane for 400m north westwards to facilitate new fibre network installation works for BDUK from 23rd June to 4th July 2025 (may continue until 15th August 2025).
Alternative route is via: Wheel Road, Church Road, Framingham Earl Road, Yelverton Road, Hall Road, Burgate Lane (Poringland, Framingham Earl, Alpington, Yelverton). The works promoter is CityFibre Metro Networks Ltd.
CRANWORTH – U35040 Letton Green from its junction with C197 Letton Road for 1604m southwards to facilitate carriageway resurfacing works from 23rd to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: C197 Letton Road, U35041 Blackmoor Row, C160 Mill Road/Woodrising Road and vice versa (Cranworth, Shipdham). The works promoter is Norfolk County Council.
DEREHAM – A1075 Yaxham Road from its junction with A1075 Tavern Lane to its junction with B1135 Yaxham Road to facilitate reallocate surface carriageway works between 07:00 and 17:00 on 22nd June 2025 (may continue until 3rd August 2025).
Alternative route is via: B1135 Yaxham Road/Dereham Road/Norwich Road/Whinburgh Road/The Lings/Low Street/Norwich Road/Dereham Road, B1108 Station Road/ Hingham Road/ Norwich Road/ Norwich Street/The Fairland/Church Street/ Watton Road/ Norwich Road, A1075 Cadman Way/Watton Road/High Street/Church Close/ Chapel Street/Market Street/Shipdham Road/Tavern Lane (Kimberley, Shipdham, Garvestone, Whinburgh and Westfield, Yaxham, Dereham, Deopham, Carbrooke, Hingham, Scoulton, Watton, Saham Toney, Ovington, Hardingham).
The works promoter is Norfolk County Council.
HADDISCOE – U6405 Low Road from its junction with P7989 Lound Road for 30m southwards to facilitate new water connection works from 23rd to 25th June 2025 (may continue until 8th August 2025).
Alternative route is via: Wiggs Road, The Street. The works promoter is Anglian Water.
HINGHAM – U78154 Hall Moor Road/Cadges Lane from its junction with U78089 Low Road for 1223m southwards to facilitate cabling works for BDUK from 24th June to 7th July 2025 (may continue until 18th August).
Alternative route is via: Hall Moor Road, Cadges Lane, Attleborough Road, Church Street, Market Place, Hall Lane. The works promoter is BT.
REDENHALL WITH HARLESTON –
A143 Harleston Bypass from its junction with A143 Harleston Bypass roundabout for 175m southwards (including the roundabout) and
C571 Redenhall Road from its junction with A143 Harleston Bypass roundabout for 80m westwards to facilitate resurfacing works between 19:00 and 06:00 from 23rd to 28th June 2025 (may continue until 9th August 2025).
Alternative route is via:
Anti Clockwise – Redenhall Road, Broad Street, Church Street, London Road, Needham Road, A143 Harleston Bypass, Wells Lane, B1164, Shortford Road, Low Road, High Road, B1062 Flixton Road, A143 Bungay Road
Clockwise – A143 Bungay Road, B1062, High Road, Low Road, B1164 Shortford Road, Wells Lane, A143 Harleston Bypass, Needham Road, London Road, The Thoroughfare, Redenhall Road (Brome and Oakley, Stockton, Framingham Pigot, Brockdish, Pulham Market, Swaimsthorpe, Redenhall with Harleston, Bungay, Earsham, Ellingham, Ditchingham, Stuston, Chedgrave, Trowse with Newton, Kirby Bedon, Denton, Dickleburgh and Rushall, Yelverton, Keswick and Intwood, Broome, Stoke Holy Cross, Needham, Hellington, Hales, Scole, Tivesthall, Wacton, Gillingham, Tasburgh, Saxlingham Nethergate, Ashby St. Mary, Loddon, Long Stratton, Sisland, Thurton, Caistor St. Edmund and Bixley, Wortwell, Kirby Cane, Alburgh, Burston and Shimpling, Holverston, Newton Flotman).
The works promoter is Norfolk County Council.
SAHAM TONEY – U33002 Ovington Road from 45m east of its junction with C121 Cley Lane for 50m eastwards to facilitate stop tap replacement works from 24th to 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: U33002 Ovington Road, C121 Saham Road, A1075 Dereham Road/Cadman Way, B1108 High Street, C121 Cley Lane and vice versa. The works promoter is Anglian Water.
SEETHING, LODDON & MUNDHAM – C202 Brooke Road/Loddon Road from its junction with C378 Church Road for 4840m westwards to facilitate lining works between 20:00 and 06:00 from 24th to 26th June 2025 (may continue until 1st August 2025).
Alternative route is via: Mundham Road, A146 Loddon Bypass, A146 Norwich Road, A146 Loddon Road, B1332 Bungay Road, B1332 The Street, B1332 Norwich Road, The Street, Hunstead Lane, Brooke Road (Framingham Pigot, Poringland, Kirstead, Framingham Earl, Chedgrave, Kirby Bedon, Brooke, Yelverton, Hellington).
SHIPDHAM – C196 Swan Lane from its junction with A1075 Market Street for 40m northwards to facilitate sluice valve repair works from 25th to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: C196 Swan Lane/Daffy Green, C196A Dereham Road, C116 Bradenham Road, A1075 Watton Road/High Street/Church Close/Chapel Street/Market Street and vice versa (Bradenham, Scarning, Shipdham).
The works promoter is Anglian Water.
THURTON & BERGH APTON –
C374 The Street from its junction with A146 Norwich Road to its junction with C374 Cookes Road and
C373 White Heath Road from its junction with C374 Cookes Road for 130m south westwards to facilitate new fibre network installation works for BDUK from 25th June to 8th July 2025 (may continue until 19th August 2025).
Alternative route is via:
The Street, Hall Road, Norwich Road
White Heath Road, School Road, Church Road, The Street, Cookes Road.
The works promoter is CityFibre Metro Networks Ltd.
NB: Please note that Roads 1 and 2 will not be closed at the same time within the anticipated dates period.
WYMONDHAM – C594 Station Road from its junction with U78289 High Banks for 100m southwards to facilitate bridge inspection works between 22:00 on 26th June and 06:00 on 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: C594 Station Road, C594 Norwich Road, B1172 Tuttles Lane East, B1172 Ayton Road, C594 Norwich Road, B1172 Tuttles Lane East, B1172 Ayton Road (Wreningham, Wymondham, Bracon Ash, Ashwellthorpe and Fundenhall, Spooner Row).
The works promoter is Network Rail Infrastructure Ltd.
The team dealing with enquiries at Norfolk County Council is South Streetworks.
HARPLEY – Fakenham Road from its junction with Foxhill Road to its junction with Back Street to facilitate surface dressing works between 19:00 and 05:00 from 26th to 28th June 2025 (may continue until 9th August 2025).
Alternative route is via: Fakenham Road, Hillington Road, Anmer Road, Lynn Road, Stanhoe Road, Stocks Close, Docking Road, Syderstone Road, The Green, Rudham Road (Hillington, Docking, Syderstone, Barwick, Flitcham with Appleton, Bircham, West Rudham, East Rudham, Tattersett, Anmer, Bagthorpe with Barmer, Harpley).
The works promoter is Norfolk County Council.
KING’S LYNN – Clenchwarton Bypass A17 from its junction with Pullover Roundabout for 500m westwards to facilitate road marking works from 24th to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: A17 Wisbech Road to Tydd Bank, Sutton Road, A47 (Clenchwarton, Tilney All Saints, Walpole Cross Keys, Terrington St. John, WalSoken, Leverington, Walpole Highway, Emneth, West Walton, Little Sutton, Newton-in-the-Isle, Tydd St. Mary, Tilney St. Lawrence, Sutton Bridge, Tydd St. Giles, Long Sutton, Wisbech, Terrington St. Clement).
The works promoter is Norfolk County Council.
NORTHWOLD AND WHITTINGTON – West End from 300m east of its junction with Thetford Road for 30m westwards to facilitate fire hydrant repair works from 24th to 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: West End, Methwold Road, Thetford Road. The works promoter is Anglian Water.
OUTWELL – Isle Road from 260m south of its junction with Birdbeck Drive for 40m southwards to facilitate new connection works between 20:00 and 06:00 on 23rd June 2025 (may continue until 4th August 2025).
Alternative route is via: A1122, B1094, A1101 (Outwell, Upwell, Nordelph). The works promoter is UK Power Distribution Ltd.
WALSOKEN – Burrett Road from its junction with Lynn Road for 50m southwards to facilitate main fitting works from 24th to 26th June 2025 (may continue until 7th August 2025).
Alternative route is via: Burrett Road, Black Bear Lane, C311 Old Lynn Road, Lynn Road. The works promoter is Anglian Water.
The team dealing with enquiries at Norfolk County Council is West Streetworks.
(ii) THEY HAVE MADE THEY HAVE MADE Temporary Traffic Regulation Orders in respect of the following roads:
ATTLEBRIDGE – A1067 Fakenham Road from its junction with A1270 Broadland Northway Roundabout for 697m north-westwards to facilitate Reclamite surfacing works between 19:30 and 23:59 on 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: A1270 Broadland Northway, A140 Cromer Road/Norwich Road/Aylsham Bypass, A149 Crossdale Street/Norwich Road/Church Street/Mount Street/Louden Road, A148 West Street/Holt Road/Cromer Road/Holt Bypass/Letheringsett Hill/Fakenham Bypass, A1067 Clipbush Lane/Pensthorpe Road/Langor Bridge/Main Road/Sparham Hill/Norwich Road/Fakenham Road (Gunthorpe, High Kelling, East Beckham, Letheringsett with Glandford, Cromer, Sparham, Thornage, Upper Sheringham, Brinton, Foxley, Drayton, Weston Longville, Horsham St. Faith and Newton St. Faith, Bodham, Holt, Northrepps, Felbrigg, Beeston Regis, Roughton, Great Witchingham, Stibbard, Marsham, Ryburgh, Erpingham, Bawdeswell, Twyford, Fakenham, Morton on the Hill, Aylmerton, Guist, Little Snoring, Alby with Thwaite, Hevingham, Horsford, Runton, Stratton Strawless, Kettlestone, Aylsham, Bintree, West Beckham, Taverham, Colby, Thursford, Hainford, Hanworth, Attlebridge).
The works promoter is Norfolk County Council.
BLOFIELD – Brundall Road from its junction with Highfield Avenue for 270m northwards to facilitate gas main upgrade works from 16th June to 4th July 2025 (may continue until 15th August 2025).
Alternative route is via: Blofield Road, The Street, Cucumber Lane, A47, Yarmouth Road, Stocks Lane, Brundall Road (Brundall, Postwick with Witton, Blofield). The works promoter is Cadent.
BRADWELL – Footpath From Plover Close To Raven Close from its junction with Burch Road for 50m southwards to facilitate new water connection works from 16th to 18th June 2025 (may continue until 30th July 2025).
Alternative route is via: Burch Road, Wren Drive, Curlew Way. The works promoter is Essex And Suffolk Water.
BRISTON – Tithe Barn Lane from its junction with B1354 Norwich Road for 300m south-eastwards to facilitate pole testing and tree cutting works between 09:30 and 15:30 on 18th June 2025 (may continue until 30th July 2025).
Alternative route is via: Norwich Road, Holt Road, Church Street, Mill Road, Tithe Barn Lane.
The works promoter is BT.
BUXTON WITH LAMAS – C245 Mill Street/The Street from 250m northeast of its junction with Aylsham Road for 430m eastwards to facilitate installation of new fibre network for BDUK from 16th to 18th June 2025 (may continue until the 1st August 2025).
Alternative route is via: Mill Street, Coltishall Road, B1354 Buxton Road/Rectory Road, B1150 Norwich Road/High Street, Station Road, North Walsham Road, Church Street, Scotow Road, The Street (Horstead with Stanninghall, Frettenham, Buxton with Lammas, Coltishall, Scottow, Tunstead).
The works promoter is CityFibre Metro Networks Ltd.
CROMER –
U10258 Links Avenue from its junction with Station Road for 410m eastwards and
U10261 Queens Road from its junction with Links Avenue for 30m southwards to facilitate footway reconstruction works from 16th June to 12th September 2025 (may continue until 12th March 2026).
Alternative route is via:
Lynewood Road, Northrepps Road, Park Road, Station Road, Queens Road;
Lynewood Avenue, Northrepps Road, Park Road.
The works promoter is Norfolk County Council.
EAST RUSTON – Fox Hill from its junction with Mill Road for 50m northwards to facilitate water SV repair works from 16th to 18th June 2025 (may continue until 30th July 2025).
Alternative route is via: Fox Hill, Heath Road, The Street, Old Lane, B1159 Stalham Road, Mill Road (East Ruston, Witton, Honing, Walcott).
The works promoter is Anglian Water.
FREETHORPE – Chapelfield from its junction with Youngs Crescent for 145m westwards to facilitate manhole cover and frame repair works on 16th June 2025 (may continue until 28th July 2025).
Alternative route is via: Chapelfield, The Green, Lower Green, Reedham Road, Porters Road, Grove Road, The Common (Beighton, Cantley, Limpenhoe and Southwood, Freethorpe).
The works promoter is Anglian Water.
GREAT AND LITTLE PLUMSTEAD – Cycle Path on East Side Broadland Northway from Broad Lane to Smee Lane from its junction with Middle Road to its junction with A47 Slip Road to facilitate resurfacing cycle lane works from 18th to 19th June 2025 (may continue until 31st July 2025).
Alternative route is via: A1270 Broadland Northway, A1042 Yarmouth Road, Maple Way, Keswick Way, Broadland Way, Peachman Way, Cranley Road, Green Lane, Smee Lane, Great and Little Plumstead Bridleway 10, Cycle Path from Smee Lane to Middle Road, Middle Road (Thorpe St. Andrew (DET), Postwick with Witton, Great and Little Plumstead).
The works promoter is Norfolk County Council.
GREAT AND LITTLE PLUMSTEAD – C874 Plumstead Road at its intersection with the railway crossing for 20m westwards and 20m eastwards to facilitate safety inspection and repairs to level crossing systems between 23:00 and 05:00 from 14th to 15th June 2025 (may continue until 27th July 2025).
Alternative route is via: Plumstead Road, Plumstead Road East, Woodside Road, Salhouse Road, A1270 Broadland Northway, Thorpe Drive Road (Rackheath, Sprowston, Thorpe St. Andrew, Great and Little Plumstead).
The works promoter is Network Rail Infrastructure Ltd.
HAINFORD – C247 Newton Road from its junction with B1354 Waterloo Road for 85m southwards to facilitate carriageway box access to provide customer service between 09:30 and 15:00 from 19th to 20th June 2025 (may continue until 31st July 2025).
Alternative route is via: Newton Road, Newton Street, Manor Road, A140 Cromer Road, B1354 Waterloo Road (Horsford, Horsham St. Faith and Newton St. Faith, Hainford).
The works promoter is BT.
HELLESDON – A140 Holt Road from its junction with Fifers Lane for 900m northwards to facilitate traffic signals upgrade works and installation of shared use path. The road will be temporarily subject to a 30mph speed restriction from 15th June 2025 to 27th February 2026 (may continue until 14th December 2026).
Alternative route is via: N/A.
The works promoter is Norfolk County Council.
HEVINGHAM – U57255 Low Lane from its junction with A140 Cromer Road for 40m westwards to facilitate pole testing works between 09:30 and 15:30 on 16th June 2025 (may continue until 28th July 2025).
Alternative route is via: Low Lane, New Road, Church Lane, A140 Cromer Road.
The works promoter is BT.
HEVINGHAM – U57254 Westgate Green from 10m south of its junction with Westgate for 20m southwards to facilitate manhole cover repair works on 16th June 2025 (may continue until 28th July 2025).
Alternative route is via: Westgate, Halls Corner Lane, Brick Kiln Road.
The works promoter is Anglian Water.
HORSHAM AND NEWTON ST FAITHS – U57228 Blind Lane from its junction with New Home Lane for 30m southwards to facilitate sewer works from 16th to 27th June 2025 (may continue until 8th August 2025).
Alternative route is via: West Lane, Church Street, Crown Road, Back Street, Blind Lane.
The works promoter is Ovamill.
HORSTEAD WITH STANNINGHALL – Frettenham Road from its junction with B1150 Norwich Road for 220m southwestwards to facilitate new fibre network installation works from 16th to 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: B1150 Norwich Road, B1354 Rectory Road/Buxton Road/Old Church Road, Buxton Road, Court Hill, Mill Road, Horstead Lane, Frettenham Road (Horstead with Stanninghall, Frettenham, Hainford).
The works promoter is CityFibre Metro Networks Ltd.
LINGWOOD AND BURLINGHAM – Heater Lane from its junction with Blofield Road for 750m eastwards to facilitate resurfacing works between 07:00 and 18:00 from 16th to 17th June 2025 (may continue until 29th July 2025).
Alternative route is via: Blofield Road, Chapel Road, Norwich Road, Station Road, School Road, Church Road, Lingwood Road.
The works promoter is Norfolk County Council.
NORTH WALSHAM – Melbourne Road from its junction with Bacton Road for 75m eastwards to facilitate carriageway patching works from 16th to 17th June 2025 (may continue until 29th July 2025).
Alternative route is via: Bacton Road, Bluebell Road, Stanley Road, Preston Road, Melbourne Road.
The works promoter is Norfolk County Council.
RACKHEATH –
Green Lane West from its junction with A1151 Wroxham Road to its junction with U51163 Wendover Road and
A1151 Wroxham Road from its junction with A1270 Broadland Northway to its junction with U57146 Muck Lane and
Green Lane West from its junction with C283 Salhouse Road to U57490 Newman Road
to facilitate Reclamite treatment works to carriageway.
Road 1) will be temporarily closed/restricted (except for pedestrian access),
Road 2) shall be temporarily subject to the imposition of a 30mph speed restriction, and
Road 3) shall be temporarily subject to the suspension of the 7.5 tonne weight restriction between 09:00 and 16:00 from 19th to 21st June 2025 (may continue until 2nd August 2025).
Alternative route is via: A1151 Wroxham Road, A1270 Broadland Northway, Salhouse Road, Green Lane West.
The works promoter is Norfolk County Council.
SLOLEY – Frankfort from 150m east of its junction with Burley Road for 30m eastwards to facilitate verge and carriageway repair works on 17th June 2025 (may continue until 29th July 2025).
Alternative route is via: Frankfort, Church Lane, Sloley Road, High Street, Frankfort (Sloley, Tunstead).
The works promoter is Norfolk County Council.
SPROWSTON – U57552 Moore Avenue from its junction with B1150 North Walsham Road to its junction with Bracey Avenue to facilitate subsidence investigation and repairs and cover replacement works from 16th to 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: Moore Avenue, Burma Road, Spixworth Road, George Hill, B1150 North Walsham Road (Sprowston, Old Catton).
The works promoter is Norfolk County Council.
SPROWSTON – U57694 Gage Road from its junction with Linacre Avenue for 210m north westwards to facilitate footway remedial works from 16th to 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: Linacre Avenue, Peregrine Road, Parana Road.
The works promoter is Norfolk County Council.
SUSTEAD – The Street from 25m west of its junction with Aylmerton Road for 30m westwards to facilitate new water connection works from 16th to 18th June 2025 (may continue until 30th July 2025).
Alternative route is via: The Street, Thurgarton Road, Sustead Road, Mill Road, The Common, Norwich Road, Chapel Road, Metton Road, Cromer Road, Aylmerton Road (Aldborough & Thurgarton, Aylmerton, Sustead, Hanworth, Roughton).
The works promoter is Anglian Water.
THURSFORD – Heath Plantation Lane from 240m west of its junction with A148 Holt Road for 50m south westwards to facilitate meter maintenance between 09:00 and 13:00 on the 19th June 2025 (may continue until 31st July 2025).
Alternative route is via: Thursford Road, Hindringham Road, A148.
The works promoter is Anglian Water.
WOOD DALLING – U57042 Cragbate Lane South from 290m south of its junction with Heydon Road for 350m southwards to facilitate pole testing works on overhead structures between 09:30 and 15:30 on the 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: Reepham Road, Briston Road, Heydon Road.
The works promoter is BT.
WROXHAM – The Avenue from its junction with A1151 Norwich Road to its junction with Staitheway Road to facilitate duct, cab and chamber installation for cabling works from 16th to 20th June 2025 (may continue until 1st August 2025).
Alternative route is via: A1151 Norwich Road, B1140 Salhouse Road, The Avenue.
The works promoter is CityFibre Metro Networks.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
Need to publish a public notice?
If you need to publish a public notice, please contact Eastern Daily Press directly at: