Bolton, Temporary Public Footpath Closures Due To Road Construction & Development Works
What is happening?
ROAD TRAFFIC REGULATION ACT 1984 SECTION 14(1) THE BOLTON (PUBLIC FOOTPATHS WESTHOUGHTON 044 & 043) (TEMPORARY CLOSURE) (NO.101) ORDER 2025
The Borough Council of Bolton has made an Order, which will be operative from 10th June 2025, which will prohibit all pedestrian traffic from using Public Footpath Westhoughton 043 commencing from Chorley Road point A at grid reference SD 64616 07556 in a generally southwest by south then south by west direction to Wimberry Hill Road point B at grid reference SD 64596 07468; as shown by the bold black line on the Order plan 1Wes044/043 over a total distance of approximately 92 metres. Public Footpath Westhoughton 044 commencing from Wimberry Hill Road point B at grid reference SD 64596 07468 in a generally northwest by west then west by south direction to point C at grid reference SD 64141 07479; as shown by the bold black line on the Order plan 1Wes044/043 over a total distance of approximately 490 metres.
An alternative route will be available commencing from Wimberry Hill Road point B at grid reference SD 64596 07468 then Wes042, Wes033, Wes045 to point C at grid reference SD 64141 07479.
The Order is necessary to facilitate the construction of a road and surrounding development and will continue for a period of 6 months, or until the works are completed, whichever is the earlier.
Dated: 10th June 2025
LS/RST/097347
J Dyson, Director of Place, Town Hall, Bolton, BL1 1RU
How long will it take?
Planned start
10-Jun-2025
Estimated end
10-Dec-2025