Barnsley, Various Roads - Temporary Road Closures and Speed Restrictions
What is happening?
BARNSLEY METROPOLITAN BOROUGH COUNCIL
ROAD TRAFFIC REGULATION ACT 1984 - SECTION 14
DOVESIDE DRIVE, DARFIELD
TEMPORARY ROAD CLOSURE
An order has been made to close Doveside Drive, from Alder Grove to Fern Close, from 12 May 2025 for approximately five days.
Reason: install telecoms service.
An alternative route is available via: Snape Hill Road/The Willows.
Promoter: Heneghan and Sons Ltd, telephone: 0113 271 3150.
SOUTH LANE, CAWTHORNE
TEMPORARY ROAD CLOSURE
An order has been made to close South Lane from outside Upper Elmhirst to Lane Head Road, from 12 May 2025 for approximately four days, from 8.00pm to 5.00am only.
Reason: telecom works.
An alternative route is available via: Lane Head Road/Cawthorne Road/Higham Common Road/Higham Lane/Whinby Road/Manchester Road/Barnsley Road/Silkstone Bypass/Noblethorpe Lane/Barnsley Road/Haigh Lane.
Promoter: Rapid Response Telecoms Ltd, telephone: 07513 823961.
BARK HOUSE LANE, CAWTHORNE
TEMPORARY 30MPH SPEED RESTRICTION
An order has been made to introduce a 30mph speed restriction on Bark House Lane, for a distance of 15 metres either side of the Cascade River Bridge, from 12 May 2025 for approximately five days.
Reason: repair works to bridge parapet.
Promoter: BMBC Environment and Transport, telephone: 01226 773555.
BANK END LANE, HIGH HOYLAND
TEMPORARY ROAD CLOSURE
An order has been made to close Bank End Lane from Upperfield Lane to High Hoyland Lane, from 12 May 2025 for approximately two days.
Reason: Telecoms works.
An alternative route is available via: Church Lane/Litherop Road/Wakefield Road/Long Lane/Scott Hill/High Street.
Promoter: Rapid Response Telecoms.
WOOD LANE, CARLTON
TEMPORARY ROAD CLOSURE
An order has been made to close Wood Lane, from Carlton Road to Stocks Hill Close, from 14 May 2025 for approximately three days.
Reason: install new water connection.
An alternative route is available via: Carlton Road/Royston Lane/Woodroyd Avenue.
Promoter: Yorkshire Water, telephone: 0344 902 2982.
CARR LANE, GUNTHWAITE
TEMPORARY ROAD CLOSURE
An order has been made to close Carr Lane from Carr Lane Farm to the railway bridge, from 14 May 2025 for approximately two days.
Reason: Telecoms pole replacement.
An alternative route is available via: Halifax Road/Renald Lane/Gadding moor Road/New Road.
Promoter: Poletek Communications, telephone 07762359519.
ST MARYS GATE, BARNSLEY
TEMPORARY ROAD CLOSURE
An order has been made to close the full length of St Marys Gate, from 12 May 2025 for approximately five days.
Reason: install new electric supply.
An alternative route is available via: St Marys Place/Church Lane/Church Street.
Promoter: OCU Group, telephone: 01302 579749.
CLIFF ROAD, DARFIELD
TEMPORARY ROAD CLOSURE
An order has been made to close Cliff Road, from Church View to outside house number 45, from 15 May 2025 for approximately one week.
Reason: works to telecoms service.
Promoter: Heneghan & Sons, telephone: 0113 271 3150.
STATION ROAD, WORSBROUGH DALE
TEMPORARY SPEED RESTRICTION
An order has been made to introduce a temporary 40mph speed restriction on Station Road from Lewden Farm Lane to Wentworth Road, from 12th May 2025 for approximately 5 days.
Reason: Drainage works.
Promoter: BMBC Highways and Engineering, 01226 773555.
WINDSOR STREET, THURNSCOE
TEMPORARY ROAD CLOSURE
An order has been made to close Windsor Street from Deightonby Street to Roman Street, from 12th May 2025 for approximately 5 days.
Reason: Carriageway resurfacing works.
An alternative route is available via Deightonby Street, Roman Street.
Promoter: BMBC Highways and Engineering, 01226 773555.
ALLOTT CRESCENT/ELLIN CLOSE/MILTON CLOSE/TURNERS CLOSE, JUMP
TEMPORARY ROAD CLOUSRE
An order has been made to close the below roads:
Allott Crescent – from Wentworth Road to outside house number 24, from 15 May 2025 for approximately two weeks.
Ellin Close – for the full length, from 12 May 2025 for approximately two weeks.
Milton Close - for the full length, from 12 May 2025 for approximately two weeks.
Turners Close – for the full length, from 21 May 2025 for approximately two weeks. Alternative route; Wentworth Road/Church Street.
Reason: Water mains replacement.
Promoter: Galliford Try, telephone 07736 879832.
MAIN STREET BACK ROAD/KATHLEEN STREET, GOLDTHORPE
TEMPORARY ROAD CLOSURE
An order has been made to close the following roads from 12 May 2025 for approximately three weeks.
Main Street Back Road from East Street to Kathleen Street. Alternative route: East Street/Main Street/Hamilton Road.
Kathleen Street from the side of house number 2 to house number 6. Alternative route: Nora Street/Doncaster Road/Hamilton Road.
Reason: Sewer connections.
Promoter: Halfway Surfacing, telephone 07866486036.
VICARAGE LANE, ROYSTON
TEMPORARY ROAD CLOSURE
An order will be made to close Vicarage Lane from Church Street to St Johns House, from 23 May 2025 for approximately one week.
Reason: install new gas service.
Promoter: Northern Gas Networks, telephone: 07813 343221.
PINFOLD HILL LANE, SILKSTONE COMMON
TEMPORARY 40MPH SPEED RESTRICTION
An order will be made to introduce a 40mph speed restriction on Pinfold Hill Lane, from Coates Lane to Hopping Lane, from 19 May 2025 for approximately three days.
Reason: works to telecoms service.
Promoter: Rapid Response Telecoms Ltd, telephone: 07552 232909.
ANGEL STREET/MEXBOROUGH ROAD, BOLTON-ON-DEARNE
TEMPORARY ROAD CLOSURE
An order will be made to close Angel Street from High Street to Mexborough Road and Mexborough Road from Angel Street to borough boundary, from 19 May 2025 for approximately two weeks, from 8.00 am to 5.00 pm.
Reason: carriageway resurfacing works.
An alternative route is available via: High Street/Wath Road/Dearne Road/Station Road/Manvers Way/Bolton Road/Hound Hill Lane.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
BLACKER GREEN LANE, SILKSTONE; HORN CROFT, CAWTHORNE
TEMPORARY ROAD CLOSURE
An order will be made to close the full length of Blacker Green Lane and Horn Croft, from 20 May 2025 for approximately 28 days, for one day only on two separate days sometime during this period.
Reason: surface dressing and lining works.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
FURLONG ROAD, HARLINGTON
TEMPORARY ROAD CLOSURE
An order will be made to close Furlong Road from Lowfield Lane to Manor Lane, from 19th May 2025 for approximately 5 days.
Reason: Provide 3 new poles .
An alternative route is available via: Doncaster Road, Ludwell Hill, Melton
Mill Lane, Pastures Road, Doncaster Road, Adwick Road, Harlington Road.
Promoter: VEA Telecoms, 07813131302.
UNDERHILL, WORSBROUGH BRIDGE
TEMPORARY ROAD CLOSURE
An order will be made to close Underhill from outside No.10 to No.18, from 19th May 2025 for approximately 5 days.
Reason: Fuse upgrade.
An alternative route is available via: Haldene, Elmsdale, Ravenscourt.
Promoter: OCU Group Ltd, 01302579749.
BARK HOUSE LANE/LANE HEAD ROAD, CAWTHORNE
TEMPORARY 40MPH SPEED RESTRICTION
An order will be made to introduce a 40mph speed restriction on Bark House Lane from Lane Head Road to entrance to Spring Cottage and Lane Head Road from South Lane to outside Greenacres, from 19 May 2025 for approximately three days.
Reason: to safely enable telecoms work.
Promoter: Rapid Response Telecoms Ltd, telephone: 07840 852548.
ILLSLEY ROAD, DARFIELD; JOHN STREET, THURNSCOE; MARKET SQUARE, GOLDTHORPE
TEMPORARY ROAD CLOSURE
An order will be made to close the following from 20 May 2025 for approximately 28 days. Each street will be closed for one day only on two separate days sometime during this period:
Illsley Road - from North Street to Nanny Marr Road. Diversion route: North Street/East Street/Nanny Marr Road.
John Street – full length.
Market Square – from Market Street to outside house number two.
Reason: surface dressing and lining works.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
HALL GATE, PENISTONE; JOAN ROYD LANE/STONEHILL RISE, CUBLEY
TEMPORARY ROAD CLOSURE
An order will be made to close the full length of Hall Gate, Joan Royd Lane (diversion: Mortimer Road/Mossley Road/Hartcliff Hill Road/Brockholes Lane) and Stonehill Rise, from 20 May 2025 for approximately 28 days. The roads will be closed for one day only for up to two separate days sometime during this period.
Reason: surface dressing and lining works.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
BUTTERLEYS/FARROW CLOSE/NOSTELL FOLD/ORCHARD CLOSE, DODWORTH
TEMPORARY ROAD CLOSURE
An order will be made to close the full length of the following roads, from 20 May 2025 for approximately 4 weeks. The road will be closed for 1 day only on 2 separate occasions within this period.
Butterleys.
Farrow Close.
Nostell Fold.
Orchard Croft.
Reason: Surface dressing works.
Promoter: BMBC Highways and Engineering, telephone 01226 773555.
MACNAGHTEN ROAD, TANKERSLEY; SALE STREET, HOYLAND COMMMON
TEMPORARY ROAD CLOSURE
An order will be made to close the full length of MacNaghten Road and Sale Street, from 20 May 2025 for approximately 28 days. The roads will be closed for one day only for up to two separate days.
Reason: surface dressing and lining works.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
CARRS LANE, CUDWORTH; GAINSBOROUGH WAY, MONK BRETTON;
HAVERDALE RISE, OLD TOWN; RIPLEY GROVE, REDBROOK
TEMPORARY ROAD CLOSURE
An order will be made to close the following from 20 May 2025 for approximately 28 days. The roads will be closed for one day only for up to two separate days sometime during this period:
Carrs Lane – from Sunny Bank Drive to its termination.
Gainsborough Way – from Tennyson Road to Clarence Road. Diversion route Tennyson
Road/Clarence Road.
Haverdale Rise – from Gawber Road to its termination.
Ripley Grove – from house numbers 9 to 21.
Reason: surface dressing and lining works.
Promoter: Barnsley MBC Environment and Transport, telephone: 01226 773555.
BIRTHWAITE ROAD/BROOKHILL ROAD/HIGHFIELDS ROAD/HOLME VIEW ROAD/OAK TREE CLOSE, KEXBROUGH
TEMPORARY ROAD CLOSURE
An order will be made to close the full length of the following roads, from 20 May 2025 for approximately 4 weeks. The road will be closed for 1 day only on 2 separate occasions within this period.
Birthwaite Road. Alternative route; Brookhill Road/Highfields Road
Brookhill Road. Alternative route; Birthwaite Road/Highfields Road.
Highfields Road Alternative route; Birthwaite Road/Brookhill Road.
Holme View Road.
Oak Tree Close.
Reason: Surface dressing works.
Promoter: BMBC Highways and Engineering, telephone 01226 773555.
SOUGHLEY LANE, WORTLEY
TEMPORARY ROAD CLOSURE
An order will be made to close Soughley Lane from Cherry Tree Cottages to Tin Mill Lane, from 19 May 2025 for approximately two weeks.
Reason: Telecoms works.
An alternative route is available via: Finkle Street Lane/A629 Halifax Road/A616/Wortley Road A6102.
Promoter: Sunbelt Rentals, telephone 03700500792.
ROPER LANE/ROPER HOUSE LANE/THURGOALND BANK, THURGOLAND
TEMPORARY TRAFFIC RESTRICTIONS
An order will be made to Introduce the below restrictions from 19 May 2025 for approximately two weeks.
Roper Lane: Closed from Thurgoland Bank to Rag Lane. An alternative route is available via Rag Lane.
Roper House Lane: Closed from Thurgoland Bank to Roper House. An alternative route is available via Roper House Lane/Old Mill Lane/Cote Lane.
Thurgoland Bank: A temporary 40mph speed restriction from Halifax Road to Sheffield Road.
Reason: Telecoms works.
Promoter: Sunbelt Rentals, telephone 03700500792.
Matthew Bell
Head of Highways, Engineering & Transportation
Place Directorate
PO Box 609
Barnsley
S70 9FH
Friday 9th May 2025
Need to publish a public notice?
If you need to publish a public notice, please contact Barnsley Chronicle directly at: