Incline Top, Abercynon - Temporary Road Closure to Facilitate the Renewal of a Leaking Water Pipe
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF (PEN Y TYLE, ABERCYNON) GORCHYMYN (CAU FFORDD DROS DRO) 2025
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf wedi gwneud Gorchymyn o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y’i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau’r ffordd er mwyn adnewyddu pibell gyswllt ddŵr sy’n gollwng.
Effaith y Gorchymyn fydd cau Pen y Tyle, Abercynon, o ffin gyffredin Rhifau 1 a 2, tua’r dwyrain yn gyffredinol i ffin gyffredin Rhifau 6 a 7, sy’n bellter o tua 35 metr..
Does dim llwybr amgen ar gael, ond bydd mynediad ar gael i eiddo tra bydd y ffordd ar gau.
Bydd mynediad ar gael i gerbydau’r gwasanaethau brys, i gerddwyr ac i eiddo.
Mae disgwyl i’r ffordd fod ar gau rhwng y dyddiadau ac amseroedd canlynol neu hyd nes y bydd y gwaith wedi’i gwblhau:-
• Cau yn ystod y dydd rhwng 8am a 6pm ar 11 Mai 2025
Dyddiad 8 Mai 2025
Andrew Wilkins Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol 2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL (INCLINE TOP, ABERCYNON) (TEMPORARY ROAD CLOSURE) ORDER 2025
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council have made an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to facilitate the renewal of a leaking water pipe.
The effect of the Order will be to close Incline Top, Abercynon, from the common boundary of No’s 1 & 2, in a generally easterly direction to the common boundary of No’s 6 & 7, a distance of approximately 35 metres.
There is no alternative route available for this closure, however access to premises shall be maintained.
Access will be maintained for emergency services, pedestrians and to premises.
The closure is expected to be in operation between the following dates and times, or until such time as the works has been completed: -
• Daytime closure between 8:00am – 6:00pm on 11th May 2025
Dated 8 May 2025
Andrew Wilkins Director of Legal and Democratic Services 2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: