West Sussex, Horsham - Temporary Road Closures and Restrictions, to allow for highway works.
What is happening?
West Sussex County Council
(Horsham District: Various Parishes – Various Roads)
(Highway Works Programme)
(Temporary Traffic Regulation) Order 2025
NOTICE is hereby given that not less than 7 days from the date of this notice, WSCC intends to make an Order under the Road Traffic Regulation Act 1984, the effect of which will be to temporarily close and introduce a temporary prohibition of waiting at anytime on sections of the following roads. This Order will also introduce a temporary 30mph speed limit on major ‘A’ class roads and a temporary 20mph speed limit on minor and non-classified roads:
Coldwaltham: Brook Lane, between the A29 and Greatham; Cowfold: A272, between Thornden and Oakfield Road and between the A281 and Long House Lane; A281, between Thornden and St Peters Close; Horsham: Blackbridge Lane, between Guildford Road and Worthing Road; Two Mile Ash Road, between Marlpost Road and Tower Hill; Itchingfield:
Plumtree Cross Lane; Sandhills Road; Westons Hill; Rudgwick:
Loxwood Road, between Drungewick Lane and the A281; Shipley: Brooks Green Road, from Mayfair to Newell House;
Smithers Hill Lane between the A272 and Countryman Lane;
Southwater: Cripplegate Lane, between Cedar Drive and Mill Straight; Storrington & Sullington: A283, between the A24 and Nightingale Lane.
These road closures are needed to protect public safety whilst the 2025/26 highway works programme is carried out. It is expected that the affected roads will be closed for upto 3 days. Temporary speed limits may be required may be required in preparation for the works, during the works and in between phases of the works. The exact dates and duration of the works and the traffic management in each location will be confirmed in advance locally nearer the time.
The Order will come into effect on 17 April 2025 and remain in≈force for up to 18 months, or until the works programme is completed, whichever is earlier.
During the works alternative routes for vehicles will be indicated on site. Access to properties on the affected length of road will be maintained at all times.
Any queries about the effect of the Order on traffic using the highway should be directed to the WSCC Contact Centre, telephone number 01243 642105.
(Horsham: West Paradre)
(Temporary Closure) Order 2025
NOTICE is hereby given that WSCC made an Order under the Road Traffic Regulation Act 1984, the effect of which will be to close West Parade between the B2237 and Newlands Road. The Order is necessary to protect public safety whilst gas mains replacement works are undertaken.
The Order came into effect on 7 April 2025 and will last for 18 months or until the proposed works are completed, whichever is earlier. It is anticipated the works will commence on or after 7 April 2025 and will take 4 weeks to complete. The one-way system will be suspended during the works but the signed diversionary route will need to be followed.
Any queries about the works to take place should be directed to SGN telephone number 0800 9121700. Any queries about the effect of the Order on vehicles using the highway should be directed to WSCC, telephone number 01243 642105.
Dated 3 April 2025
Director of Law & Assurance, County Hall, Chichester
Need to publish a public notice?
If you need to publish a public notice, please contact Sussex World directly at: