Caerphilly, Temporary Road Closure Due To Rail Bridge Repairs
What is happening?
CYNGOR BWRDEISTREF SIROL CAERFFILI CAERPHILLY COUNTY BOROUGH COUNCIL
PEN-DERI FARM LANE, ARGOED
GORCHYMYN GWAHARDD GYRRU DROS DRO 2025
HYSBYSIR drwy hyn fod Cyngor Bwrdeistref Sirol Caerffili, wrth weithredu ei bwerau o dan Ddeddf Rheoleiddio Traffig Ffyrdd 1984 (fel y’i diwygiwyd), yn bwriadu, mewn nid llai na saith diwrnod o ddyddiad yr Hysbysiad hwn, wneud Gorchymyn a fydd a’r effaith o wahardd cerbydau rhag mynd ar hyd:
Pen-deri Farm Lane, Argoed rhwng y cyffordd â Cwm Road a Lôn Cwm-Corrwg a Fferm Pen-deri am bellter o tua 457 metr.
Disgwylir i’r Gorchymyn arferatheidig gychwyn ar 31 Mawrth 2025 am gyfnod nid yn fwy na deunaw mis neu nes bod y gwaith wedi ei gwblhau, p’un bynnag sydd gyntaf. Disgwylir i’r gwaith gael ei gwblhau erbyn 2 Mai 2025.
Bydd mynediad ar gael i gerddwyr lle bo hynny’n bosibl. Ni fydd mynediad ar gael i’r gwasanaethau brys a phreswylwyr.
Mae llwybrau amgen ar hyd Lôn Cwm-Corrwg, Yard Coal Rise B4251, Lôn Gellideg, Manmoel Road, lôn ddienw, lôn ddienw, Pen-deri Farm Lane.
Y rheswm dros wneud y Gorchymyn yw caniatáu gwaith atgyweirio i’r bont reilffordd.
Mae angen y gorchymyn ar Hammond ECS LTD.
Gellir cael rhagor o wybodaeth drwy Hammond ECS LTD ar
DAVID@HAMMONDECS.COM neu 01685 884813 yn ystod oriau swyddfa arferol.
Dyddiad: 21 Mawrth 2025
Marcus Lloyd, Pennaeth Isadeiledd, Ty Penallta, Parc Tredomen, Ystrad Mynach, Hengoed CF82 7PG
PENDERI FARM LANE, ARGOED
TEMPORARY PROHIBITION OF DRIVING ORDER 2025
NOTICE is hereby given that Caerphilly County Borough Council in exercise of its powers under the Road Traffic Regulation Act 1984 (as amended) intends in not less than seven days from the date of this Notice to make an Order, the effect of which will be to prohibit vehicles from proceeding along
Penderi Farm Lane, Argoed between its junction with Cwm Road and Cwm Corrwg Lane and Penderi Farm for a distance of approx. 457 meters.
The proposed Order is expected to commence on 31 March 2025 for a period not exceeding eighteen months or until the works have been completed, whichever is the earlier. It is anticipated the works will be complete by 2 May 2025.
Pedestrian access will be maintained where possible. Emergency services and residents access will not be maintained.
Alternative routes are via Cwm Corrwg Lane, Yard Coal Rise B4251, Lon Gellideg, Manmoel Road, Unnamed Road, Unnamed Road, Penderi Farm Lane.
The reason for making the Order is to allow for Rail Bridge Repairs.
The order is required by Hammond ECS LTD.
Further information can be obtained via Hammond ECS LTD via
DAVID@HAMMONDECS.COM or on 01685 884 813 during office hours.
Dated: 21st March 2025
Marcus Lloyd, Head of Infrastructure, Penallta House, Tredomen Park, Ystrad Mynach, Hengoed CF82 7PG
How long will it take?
Planned start
31-Mar-2025
Estimated end
2-May-2025