TEMPORARY TRAFFIC REGULATION ORDERS 2025
Road Traffic Regulation Act, 1984
Norfolk County Council in exercise of its powers under Section 14(1) of the Road Traffic Regulation Act 1984, hereby give notice that:
i) THEY PROPOSE TO MAKE Temporary Traffic Regulation Orders in respect of the following roads:
BACTON – The Street from its junction with Clay Lane for 80m south westwards to facilitate electrical connection works from 3rd to 7th March 2025 (may continue until 7th September 2025). Alternative route is via: The Street, Rectory Road, Church Road, Sandy Lane, Pollard Street, Bacton Road, The Green (Witton, Bacton).
BELTON WITH BROWSTON –
- New Road from its junction with Bracon Road for 300m north eastwards and
- Bracon Road from its junction with Fern Gardens for 50m eastwards to facilitate essential resurfacing works from 6th to 7th March 2025 (may continue until 18th April 2025). Alternative route is via: Waveney Drive, St Johns Road, Station Road North, Bracon Road.
BLAKENEY – A149 New Road from 90m west of its junction with Wiveton Road for 50m south westwards to facilitate Anglian Water works for a new water connection between 19:00 and 23:59 on the 5th March 2025 (may continue until 16th April 2025). Alternative route is via: New Road, Cley Road, Coast Road, High Street, Salthouse Road, Weybourne Road, Kelling Road, The Street, Sheringham Road, Cromer Road, Holway Road, Holt Road, Holt Bypass, Norwich Road, Letheringsett Hill, Fakenham Road, Fakenham Bypass, Barsham Road, Wells Road, Burnt Street, Church Street, Warham Road, Stiffkey Road, Morston Road, Morston Chase, Quay Lane (Sheringham, Gunthorpe, High Kelling, Wiveton, Kelling, Holt, Blakeney, Wells-Next-the-Sea, Letheringsett with Glandford, Fakenham, Morston, Wighton, Little Snoring, Blakeney, Thornage, Upper Sheringham, Brinton, Warham, Kettlestone, Barsham, Stiffkey, West Beckham, Bodham, Holt, Walsingham, Thursford, Sculthorpe, Weybourne, Salthouse, Cley-Next-the-Sea).
BRUNDALL – Highfield Avenue from its junction with The Street for 300m north eastwards to facilitate gas main upgrade works from 3rd to 14th March 2025 (may continue until 25th April 2025). Alternative route is via: The Street, Blofield Road, Highfield Avenue.
BURGH AND TUTTINGTON – Burgh Road from its junction with Wood Lane for 250m north-westwards to facilitate Norfolk County Council cradle footbridge replacement works from 3rd to 7th March 2025 (may continue until 16th April 2025). Alternative route is via: The Street, Aylsham Road, Church Road, New Road, Tuttington Road, Hall Road, Beck Lane, Norwich Road, Aylsham Road, Tuttington Road, A140 Aylsham Bypass, Burgh Road (Brampton, Felmingham, Aylsham, Burgh and Tuttington, Skeyton).
BURGH AND TUTTINGTON –
- Tuttington Footpath 3 from its junction with Church Lane for 140m southwards and
- Brampton Footpath 3 from its junction with Tuttington Footpath 3 for 20m southwards and
- Brampton Footpath 4 from its junction with Brampton Footpath 3 for 20m eastwards to facilitate Norfolk County Council cradle footbridge replacement works from 3rd March to 2nd May 2025 only with signage indicating closures in place (may continue until the 2nd September 2025). Alternative route is via: N/A.
BUXTON WITH LAMAS – Footpath Between 17 and 18 Cromes Place to Hautbois Road from its junction with Hautbois Road for 84m eastwards to facilitate CityFibre installation of new fibre network works from 5th to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: Footpath from St Cromes Place to Ormesby Road, Hautbois Road, Cromes Place (Buxton with Lamas).
GREAT YARMOUTH – Southtown Road from its junction with Queen Anne Road for 210m northwards to facilitate construction of new public realm and surface works by Norfolk County Council from 1st March to 25th April 2025 (previously 3rd June 2024 to 28th February 2025) (may continue until 2nd December 2025). Alternative route is via: Southtown Road, Pasteur Road, Thamesfield Way, A47 / A1243 Roundabout, Western Bypass, A12 Gorleston On Sea, From J A1243 To J A143 S, A12 Gorleston On Sea From J A143 To J A1243 Including Roundabout N, William Adams Way.
GREAT YARMOUTH – Kitchener Road from 90m east of its junction with Northgate Street for 200m eastwards to facilitate Cadent gas main upgrades from 3rd to 21st March 2025 (may continue until 2nd May 2025). Alternative route is via: Kitchener Road, Northgate Street, Estcourt Road, North Denes Road.
GREAT YARMOUTH – Yarmouth Way from its junction with Deneside for 400m south-eastwards to facilitate installation of bus bays and traffic flow works from 3rd to 10th March 2025 (may continue until 21st April 2025). Alternative route is via: Yarmouth Way, King Street, St Peters Road, Blackfriars Road, Camden Road, Queens Road, South Quay.
HAPPISBURGH – Grub Street from 20m south of its junction with Lantern Lane for 240m southwards to facilitate works to create a new entrance and cable ducting work from 3rd March to 4th April 2025 (may continue until 4th October 2025). Alternative route is via: Grub Street, North Walsham Road, The Street, Whimpwell Street, Coronation Road, Short Lane.
INGHAM – Mill Road from 180m north of its junction with Calthorpe Street for 260m northwards to facilitate pole testing works on the 4th March 2025 (may continue until 15th April 2025). Alternative route is via: Mill Road, Calthorpe Street, Whinmere Road, Sea Palling Road, Hickling Lane, Stalham Road, Sea Palling Road (Ingham, Hickling, Sea Palling).
KNAPTON – The Street from its junction with Paston Road for 250m north eastwards to facilitate installation of a surface water drainage system from 3rd March to 11th April 2025 (may continue until 11th October 2025). Alternative route is via: The Street, Paston Road, The Green (Paston, Knapton).
MORTON-ON-THE-HILL – Marl Hill from its junction with A1067 Fakenham Road to its junction with Morton Lane to facilitate cutting back vegetation around field entrance between 08:00 and 16:00 from 3rd to 5th March 2025 (may continue until 16th April 2025). Alternative route is via: A1067 Fakenham Road/Norwich Road, B1535 Weston Hall Road/Hockering Road/Weston Green Road/Sandy Lane/Frans Green/Wood Lane, Paddys Lane, Honingham Road, Woodforde Close, Church Street, Marl Hill Road, Marl Hill (Hockering, Morton on the Hill, Honingham, Weston Longville, East Tuddenham, Great Witchingham).
NORTHREPPS – Hall Road from 110m northeast of its junction with New Road for 100m north-eastwards to facilitate C & L Construction installation of utility services works from 3rd to 21st March 2025 (may continue until 2nd May 2025). Alternative route is via: Road, Crossdale Street, Norwich Road, Mill Road, Station Road, Overstrand Road, Northrepps Road (Cromer, Northrepps).
OVERSTRAND – High Street from its junction with Cromer Road for 38m north-eastwards to facilitate Cadent gas main upgrade work from 3rd to 14th March 2025 (may continue until the 14th September 2025). Alternative route is via: Cromer Road, Mundesley Road, Carr Lane, High Street.
RACKHEATH – Vera Road from its junction with Green Lane East for 30m north-eastwards to facilitate Norfolk County Council footway works from 3rd to 14th March 2025 (may continue until 25th April 2025). Alternative route is via: Green Lane East, Salhouse Road, Vera Road.
SOUTH WALSHAM – Burlingham Road from 20m southwest of its junction with The Street for 50m south-westwards to facilitate water meter exchange works on 4th March 2025 (may continue until 15th April 2025). Alternative route is via: Panxworth Road, B1140 Chamery Hall Lane/Newport Road, Old Newport Road, Burlingham Road.
SUFFIELD – Rectory Road from 210m south of its junction with Brick Kiln Lane for 180m northwards to facilitate construction of new vehicular access for cable ducting works from 4th March to 7th April 2025 (may continue until 7th October 2025). Alternative route is via: Rectory Road, Felmingham Road.
WALCOTT – Ostend Road from 100m south of its junction with Happisburgh FP6 for 50m southwards to facilitate new water connection works from 3rd to 5th March 2025 (may continue until 16th April 2025). Alternative route is via: Ostend Road, B1159 Coast Road, North Walsham Road, Ostend Road.
WORSTEAD – Honing Road from its junction with Barnards Road for 30m northwards to facilitate water meter exchange works on 3rd March 2025 (may continue until 14th April 2025). Alternative route is via: Barnards Road, Honing Road.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
BRADENHAM – C116 Hale Road from its junction with U33234 Half Mile Drift for 300m eastwards to facilitate BT pole testing works on 7th March 2025 (may continue until 18th April 2025). Alternative route is via:
- Eastbound – C116 Bradenham Road/Church Street/Hale Road/Bradenham Road, C117 School Road/Cook Road/Necton Road/Hale Road/Tuns Road, A47, A1075 Tavern Lane/South Green/Shipdham Road/Dereham Road/Market Street/Chapel Street/Church Close/High Street/Watton Road.
- Westbound – C116 Bradenham Road, A1075 Watton Road/High Street/Church Close/Chapel Street/Market Street/Dereham Road/Shipdham Road/South Green/Yaxham Road, A47, C117 Tuns Road/Hale Road/Necton Road/Cook Road/School Road, C116 Bradenham Road/Hale Road/Church Street/Bradenham Road (Bradenham, Holme Hale, Necton, Dereham, Shipdham).
CHEDGRAVE – Chedgrave FP4/Loddon FP3/Chedgrave FP6 footpath from 110m south of its junction with Chedgrave RB7 for 640m south-westwards to facilitate footpath maintenance works from 3rd March to 30th May 2025 (may continue until the 30th November 2025). Alternative route is via: N/A.
CRANWORTH – C160 Woodrising Road from its junction with B160 Southburgh Road for 150m north-westwards to facilitate BT pole testing works between 09:30 and 15:30 on 1st March 2025 (may continue until the 12th April 2025). Alternative route is via: C160 Woodrising Road, B1108 Norwich Road, A1075 Cadman Way/Dereham Road/Watton Road/High Street/Chapel Street/Shipdham Road, U35042 Church Close/Townsend Place, C160 Mill Road and Woodrising Road (Cranworth, Shipdham, Cranworth, Hingham).
EAST CARLETON AND KETTERINGHAM – C182 Hethersett Road from its junction with High Green for 200m north-eastwards to facilitate BT pole testing works between 09:30 and 15:30 on 3rd March 2025 (may continue until the 2nd May 2025). Alternative route is via:
Hethersett Road, High Street, High Ash Road, St Thomas Lane, Wymondham Road (East Carleton, Ketteringham).
FORNCETT – C346 Mill Road from its junction with C346 Low Road for 150m westwards to facilitate BT duct works from 5th to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: Mill Road, Long Stratton Road, Norwich Road, The Turnpike, Market Place, Queen Street, King Street, Castle Hill Road, Haugh Road, Mile Road, Heath Road, Long Row, Station Road, Ipswich Road, The Street, Swan Lane, Forncett Road, Low Road (New Buckenham, Forncett, Bunwell, Pulham Market, Tibenham, Carleton Rode, Gissing, Old Buckenham, Winfarthing, Tivetshall, Wacton, Long Stratton, Banham, Tharston and Hapton, Aslacton).
GREAT DUNHAM – U35167 Crow Lane from its junction with the C238 Castle Acre Road for 40m southwards to facilitate culvert wall repairs from 3rd to 5th March 2025 (may continue until the 16th April 2025). Alternative route is via: C238 Castle Acre Road, U35200 Palgrave Road.
NEWTON FLOTMAN – U78128 Church Road from its junction with level crossing for 10m southwards and 10m northwards to facilitate Network Rail track maintenance works between 02:00 and 06:00 then 22:00 and 23:59 on 2nd March 2025 (may continue until the 13th April 2025). Alternative route is via: Greenways, Station Road, Flordon Road, Ipswich Road, Church Road (Flordon, Newton Flotman).
ROCKLAND ST. MARY WITH HELLINGTON – C202 The Street from its junction with Surlingham Lane for 450m westwards to facilitate CityFibre installation of new fibre network works from 3rd to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: C202 The Street, New Inn Hill, Lower Road, Claxton Corner, Ferry Road, Langley Road, Loddon Road, Mundham Road, George Lane (Claxton, Rockland St. Mary).
Alternative route for HGVs is via: A146 Loddon Bypass, Loddon Road, C202 Kirby Road, Rockland Road, Bramerton Lane, Bramerton Road, The Street (Rockland St. Mary, Bramerton, Framingham Earl, Framingham Pigot, Poringland, Bixley, Yelverton, Langley with Hardley, Hellington, Bramerton, Ashby St. Mary, Thurton, Caistor St. Edmund and Bixley, Holverston, Carleton St. Peter).
NB: Access to be given to residents of Surlingham Lane (Gateman to be on site).
SHIPDHAM – U35043 King Road from 700m east of its junction with A1075 Watton Road for 100m eastwards to facilitate BT pole testing works between 09:30 and 15:30 on 3rd March 2025 (may continue until the 14th April 2025). Alternative route is via: A1075 Watton Road, U35043 King Row.
SOUTH LOPHAM – Church Road from its junction with Primrose Lane for 65m northwards to facilitate Norfolk County Council surface water pipe replacement works from 3rd to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: Church Road, The Street, The Green, Kenninghall Road, Lopham Road, Garboldisham Road, Guiltcross, Manor Road, The Ling, Water Lane, Back Street, Diss Road, Thetford Road (South Lopham, Kenninghall, Garboldisham, North Lopham, Harling).
SURLINGHAM – U78016 Pond Lane from its junction with C195 School Lane for 125m northwards to facilitate CityFibre installation of new fibre network works from 3rd to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: Pratts Hill, Walnut Hill, School Lane, Pond Lane.
NB: Access for New Road via diversion route up to the points of closure.
WYMONDHAM – Footpath 7FP63 from its junction with U71185 High House Avenue for 23m southwards to facilitate Anglian Water new connection works on 3rd to 5th March 2025 (may continue until the 16th April 2025). Alternative route is via: High House Avenue, Norwich Road, Estelle Lane, Estelle Way, Ashleigh Gardens, Sycamore Avenue.
WYMONDHAM – U78297 Church Street from its junction with C700 Middleton Street for 70m westwards to facilitate window repair works from 3rd to 7th March 2025 (may continue until the 18th April 2025). Alternative route is via: Church Street, Vicar Street, Middleton Street.
YELVERTON –
- C374 Slade Lane from its junction with A146 Loddon Road for 25m southwards and
- U76508 Slade Lane from its junction with A146 Loddon Road for 25m northwards to facilitate UK Power Network installation of transformer and new electricity supply works from 4th to 6th March 2025 (may continue until the 17th April 2025).
Alternative route is via:
- Church Road, Bergh Apton Road, Mill Road, Loddon Road and
- A146 Loddon Road, Bramerton Lane (Bergh Apton, Alpington, Yelverton, Holverston).
The team dealing with enquiries at Norfolk County Council is South Streetworks.
BOUGHTON – Mill Hill Road from its junction with Boughton Long Road for 400m south-westwards to facilitate Norfolk County Council HRA patching works from 4th to 6th March 2025 (may continue until the 17th April 2025).
Alternative route is via: Boughton Long Road, Mill Hill Road, Gibbet Lane, Cavenham Road, Fincham Road, Swaffham Road, Main Road, Boughton Road (Barton Bendish Fincham, Boughton Wereham).
BRANCASTER – Common Lane from its junction with A149 for 35m southwards to facilitate UK Power Network new electrical connection works on 3rd March 2025 (may continue until the 14th April 2025).
Alternative route is via: Main Road, Dalegate Road, Common Lane.
FELTWELL – Long Lane from its junction with Short Beck for 50m westwards to facilitate Anglian Water new connection works from 4th to 6th March 2025 (may continue until the 17th April 2025).
Alternative route is via: Long Lane, Short Lane, Lime Kiln Lane, High Street, Short Beck, Hythe Road, Feltwell Road, Methwold Road, Severalls Road, Broad Drove, Decoy Road, Southery Road (Methwold, Southery, Feltwell).
KING’S LYNN –
- A148 Lynn Road from its junction with Lynn Road/Queen Mary Road for 95m westwards and;
- A148 Lynn Road from its junction with Lynn Road/Queen Mary Road for 65m southwards and;
- A148 Lynn Road from its junction with Lynn Road/A1076 Gayton Road for 70m eastwards to facilitate Norfolk County Council carriageway resurfacing works between 20:00 and 05:00 from 2nd to 30th March 2025 only whilst signs indicating closures are in place (may continue until the 30th September 2025).
Alternative route is via: Wootton Road, Low Road, Edward Benefer Way, John Kennedy Road, Austin Street, Littleport Street, Gaywood Road, Lynn Road.
NB: Please note that the closures are to be in place on Sundays only during this period.
KING’S LYNN –
- A148 Lynn Road from its junction with Lynn Road/Queen Mary Road for 65m southwards and;
- A148 Lynn Road from its junction with Lynn Road/Queen Mary Road for 140m north-eastwards and;
- A148 Lynn Road from its junction with Lynn Road/A1076 Gayton Road for 70m eastwards to facilitate Norfolk County Council carriageway resurfacing works between 20:00 and 05:00 from 2nd to 30th March 2025 only whilst signs indicating closures are in place (may continue until the 30th September 2025).
Alternative route is via: Lynn Road, Gaywood Road, Littleport Street, Blackfriars Road, Railway Road, Norfolk Street, John Kennedy Road, Edward Benefer Way, Low Road, Wootton Road.
NB: Please note that the closures are to be in place on Sundays only during this period.
KING’S LYNN – High Road from its junction with Lynn Road for 170m westwards to facilitate Norfolk County Council carriageway haunching works from 4th to 6th March 2025 (may continue until the 18th April 2025).
Alternative route is via: High Road, Lynn Road, School Road, A47, Saddlebow Road.
UPWELL – Main Road from 500m south of its junction with Horse Head Drove for 100m southwards to facilitate Norfolk County Council carriageway resurfacing works on 3rd March 2025 (may continue until the 14th April 2025).
Alternative route is via: Main Road, Wisbech Road, March Road, New Road, Main Street, Wash Road, Suspension Bridge, Bates Drove, A1101 Wisbech Road, A10 Lynn Road, Ferry Bank, A10 Southery Bypass/Fordham Bypass/Downham Eastern Bypass, A1122 Southery Bypass/Western Bypass/Station Road, Bridge Road, Lady Drove, Downham Road, Outwell Road, Well Creek Road, Church Terrace, Isle Road, Rectory Road, Town Street, Townsend Road (Downham, West Downham, Nordelph, Denver, Downham Market, Southery, Littleport Hilgay, Fordham, Ryston, Welney, Outwell, Upwell).
WIGGENHALL ST. GERMANS – Wiggenhall St. Germans Footpath 13 from its junction with St. Peters Drove to its junction with Sluice Road to facilitate Balfour Beatty dredging river works from 3rd March to 2nd September 2025.
Alternative route is via: N/A.
The team dealing with enquiries at Norfolk County Council is South Streetworks.
ii) THEY HAVE MADE Temporary Traffic Regulation Orders in respect of the following roads:
ATTLEBRIDGE – Station Road from its junction with Reepham Road for 800m southwards to facilitate vegetation cutting from 24th to 26th February 2025 (may continue until 9th April 2025).
Alternative route is via: Station Road, Old Fakenham Road, A1067 Fakenham Road, A1270 Broadland Northway, Fir Covert Road, Reepham Road (Felthorpe, Taverham, Swannington, Attlebridge).
CAISTER-ON-SEA –
- Jack Chase Way from its junction with Norwich Road for 1800m northwards,
- Prince of Wales Road from its junction with Jack Chase Way for 55m eastwards,
- A149 Norwich Road from 1000m northwest of its junction with Jack Chase Way to its junction with Jack Chase Way, and
- A149 Caister Bypass from 1000m southeast of its junction with Norwich Road to its junction with Norwich Road to facilitate Norfolk County Council civil works.
The Roads 1) and 2) will be temporarily closed/restricted to vehicles (except for pedestrian access), the Road 3) will be temporarily subject to a southeast bound 40mph speed restriction, and Road 4) will be temporarily subject to a northwest bound 40mph speed restriction from 24th February to 4th April 2025 (may continue until 4th October 2025).
Alternative route is via:
- Norwich Road, Ormesby Road, Jack Chase Way.
- Prince of Wales Road, Norwich Road, Ormesby Road (Ormesby St Margaret with Scratby, Caister-on-Sea).
CAWSTON – Heydon Road from its junction with the B1145 High Street for 880m northwest to facilitate horizontal directional drilling from 24th February to 25th June 2025 (may continue until 23rd August 2025).
Alternative route is via: Heydon Road, B1149 Holt Road, Oulton Street, Chapel Street, B1145 High Street (Heydon, Cawston).
COLBY AND BANNINGHAM – Banningham Road from 110m west of its junction with The Close for 120m westwards to facilitate new carriageway entrance creation and cable works from 24th February to 1st March 2025 (may continue until 25th September 2025).
Alternative route is via: Banningham Road, A140 Aylsham Bypass, B1145 Aylsham Road/North Walsham Road, Colby Road, Banningham Road (Aylsham, Colby and Banningham).
CORPUSTY AND SAXTHORPE – Norwich Road from its junction with Croft Lane for 1200m north westwards to facilitate windfarm site safety the Road will be temporarily subject to a 40mph speed restriction from 25th February to 25th July 2025 (may continue until 24th August 2026). Alternative route is N/A.
CORPUSTY AND SAXTHORPE – B1354 Briston Road from its junction with the B1149 Norwich Road for 1000m north westwards to facilitate windfarm site safety from 25th February to 25th July 2025 (may continue until 24th August 2026). Alternative route is N/A.
CROMER –
- A149 Prince of Wales Road from its junction with Cadogan Road to its junction with New Street and
- A149 Prince of Wales Road from its junction with A148 West Street to its junction with Cadogan Road to facilitate Norfolk County Council bus station works.
The road 1) is anticipated to be closed from 24th to 28th February 2025 and the road 2) is anticipated to be closed from 17th to 21st March 2025 (may continue until the 27th September 2025).
Alternative route is via:
- A149 Hamilton Road/Church Street/Mount Street/Louden Road, A148 West Street, Beach Road, A149 Runton Road.
- A148 West Street, Beach Road, A149 Runton Road/Hamilton Road/Church Street/Mount Street/Louden Road.
FAKENHAM – Norwich Street from its junction with White Horse Street to its junction with Market Place to facilitate Anglian Water stop-tap replacement works from 25th to 27th February 2025 (may continue until the 10th April 2025).
Alternative route is via: Norwich Street, Market Place, Old Post Office Street, Oak Street, Wells Road, Highfield Road, Queens Road.
GREAT AND LITTLE PLUMSTEAD – Hall Road from 277m east of its junction with School Road and Witten Lane for 25m eastwards to facilitate Felling & Stump Grading Carriageway work on 26th February 2025 (may continue until 9th April 2025).
Alternative route is via: Hall Road, School Road, Salhouse Road, Post Office Road, Blofield Corner Road, Park Lane (Blofield, Great and Little Plumstead).
GREAT YARMOUTH – North Drive from 90m north of its junction with Tennyson Road for 50 metres northwards to facilitate Anglian Water air valve scheme works from 24th to 26th February 2025 (may continue until the 9th April 2025).
Alternative route is via: Jellicoe Road, Caister Road, Lawn Avenue, North Quay, Acle New Road, Fullers Hill, Priory Plain, St Nicholas Road, Euston Road, Wellesley Road, North Drive.
GREAT YARMOUTH – Deneside from its junction with Regent Road for 180m south-eastwards to facilitate Great Yarmouth gyratory works, traffic (constituting any class of vehicle) over the Road shall be temporarily prohibited to park, stop, load, and/or unload including in the Loading Bays for the duration of the works/period the restriction is necessary which is anticipated to be from 24th February to 20th June 2025 (may continue until the 23rd August 2025).
Alternative route is via: N/A.
GREAT YARMOUTH – Alexandra Road from its junction with Crown Road for 800m south-westwards to facilitate installation of bus bays and traffic flow works from 24th to 28th February 2025 (may continue until 11th April 2025).
Alternative route is via: Regent Road, King Street.
HAPPISBURGH – Grub Street from 120m north of its junction with Lantern Lane for 50 metres northwards to facilitate new water connection works from 26th to 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via: Grub Street, North Walsham Road, The Street, Whimpwell Street, Lantern Lane, Grub Street.
REEPHAM – The Moor from its junction with New Road to its junction with Orchard Lane to facilitate CityFibre new fibre network works from 24th to 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via: Orchard Lane, B1145 Cawston Road/Station Road, New Road.
SOUTH WALSHAM – Burlingham Road from its junction with The Street for 50m south westwards to facilitate new water connection works from 26th to 28th February 2025, (may continue until the 11th April 2025).
Alternative route is via: Panxworth Road, B1140 Chamery Hall Lane/Newport Road, Old Newport Road, Burlingham Road.
SOUTHREPPS – High Street from its junction with Church Street for 50m westwards to facilitate Anglian Water works for a new water connection from 19:00 on the 27th to 06:00 on the 28th February 2025 (may continue until 11th April 2025).
Alternative route is via: Chapel Street, Gimingham Road, Pit Street, Lower Street, Antingham Road, Southrepps Road, Cromer Road, The Green, Thorpe Road, High Street (Thorpe Market, Antingham, Southrepps).
THORPE ST. ANDREW –
- Yarmouth Road (eastbound lane only) from its junction with Primrose Crescent for 290m eastwards and
- A1042 Ring Road from its junction with A1242 Yarmouth Road for 160m northwards to facilitate Norfolk County Council carriageway works from 24th February to 25th April 2025 (may continue until 24th October 2025).
Alternative route is via:
- A1242 Yarmouth Road/Thorpe Road/Carrow Road, A147 Carrow Road/Koblenz Avenue/King Street, A1054 Bracondale/Martineau Lane, A146 Loddon Road, A47, A1270 Broadland Northway, A1042 Yarmouth Road.
- A1042 Ring Road/Saint William Way/St Williams Way/Heartsease Lane/Moushold Lane, A1151 Sprowston Road/Magdalen Road/Bull Close Road/Charlton Road, A147 Barrack Street/Bishop Bridge Road/Riverside Road/Riverside/Koblenz Avenue/Canary Way/Carrow Road, A1242 Clarence Road/Thorpe Road/Yarmouth Road (Sprowston, Thorpe St. Andrew, Norwich City, Postwick).
WIVETON – Leatherpool Lane from 100m south of its junction with A149 Coast Road for 500m south westwards to facilitate drainage works between 09:00 and 15:00 on the 24th February 2025 (may continue until 7th April 2025).
Alternative route is via: Leatherpool Lane, Coast Road, Hall Lane.
The team dealing with enquiries at Norfolk County Council is North Streetworks.
BANHAM – Grove Road from 100m north of its junction with Kenninghall Road for 100m northwards to facilitate Anglian Water defect repair works from 24th to 25th February 2025 (may continue until 4th April 2025).
Alternative route is via: Quidenham Road, High Street, Kenninghall Road.
BARNHAM BROOM – C167 Honingham Road from its junction with C162 Norwich Road for 190m northwards to facilitate Norfolk County Council tree removal and wall rebuilding works from 24th to 28th February 2025 (may until 11th April 2025).
Alternative route is via: Honingham Road, Barnham Broom Road, Mattishall Road, Church Lane, Church Road, Welborne Road, South Green, Heath Road, Thuxton Road, Station Lane, Dereham Road, The Lings, Low Street, Norwich Road, Rush Green, Bell Road (Mattishall, Barnham Broom, Marlingford and Colton, Brandon Parva, Coston, Runhall and Welborne, Hardingham, Garvestone, Reymerston and Thuxton, Kimberley and Carleton Forehoe, East Tuddenham).
BEESTON WITH BITTERING – U35119 Herne Lane from its junction with C221 Dereham Road for 100m westwards to facilitate BT pole testing works between 09:30 and 15:30 on the 27th February 2025 (may continue until 10th April 2025).
Alternative route is via: C221 Dereham Road, 35240 Dairy Drift, 35119 Herne Lane and vice versa.
BEESTON WITH BITTERING – C241 Back Lane from 230m west of its junction with C221 Dereham Road for 100m westwards to facilitate BT pole testing works between 09:30 and 15:30 on the 26th February 2025 (may continue until 11th April 2025).
Alternative route is via: C241 The Street/Church Road/Beeston Road, C240 Beeston Road, C123 Litcham Road/Dunham Road/Church Road, C222 Dereham Road/Litcham Road/Dereham Road, C241 Road from Back Lane to Tithe Road, C221/C241 Back Lane and vice versa (Kempstone, Beeston, Beeston with Bittering, Great Dunham, Mileham).
BESTHORPE – C139 Bunwell Road from its junction with U33095 School Road for 230m northwards to facilitate BT pole testing works from 24th to 28th February 2025 (may continue until 14th April 2025).
Alternative route is via: C140 Bunwell Road/Station Road, School Road, The Street, Bunwell Road, Silver Street, Besthorpe Road, C139 Bunwell Road.
BURSTON AND SHIMPLING – C205 Station Road from its junction with the level crossing for 10m eastwards and 10m westwards to facilitate Network Rail track inspection between 22:30 on the 22nd to 07:30 on the 23rd February 2025 (may continue until 6th April 2025).
Alternative route is via: Station Road, Burston Road, Dickleburgh Road, Pug Street, A140, Diss Road, Victoria Road, Park Road, Denmark Street, Shelfanger Road, Sunnyside, Heywood Road, Durbidges Hill, Crown Green (Diss, Heywood, Dickleburgh and Rushall, Scole, Burston and Shimpling).
CARLETON ST. PETER – C382 Spong Lane from its junction with C381 Ferry Road for 300m westwards to facilitate BT pole replacement works between 09:30 and 15:30 on the 26th February 2025 (may continue until 9th April 2025).
Alternative route is via: Spong Lane, Ferry Road, The Street, Claxton Corner, Church Lane, Claxton Church Road, Mill Road, Hall Road, Church Road, Chapel Road, Chapel Lane (Claxton, Rockland St. Mary, Ashby St. Mary, Carleton St. Peter).
COSTESSEY – C162 Longwater Lane from its junction with U78244 East Hills Road for 290m northwards to facilitate Cadent gas pipe repair works from 24th February to 14th March 2025 (may continue until 25th April 2025).
Alternative route is via: Longwater Lane, West End, Townhouse Road, Norwich Road, Dereham Road.
CRINGLEFORD – C178 Intwood Road from its junction with U78272 Brettingham Avenue for 160m southwards to facilitate BT pole testing works between 09:30 and 15:30 on the 27th February 2025 (may continue until 10th April 2025).
Alternative route is via: Intwood Road, Intwood Lane, Rectory Road, Scotts Hill, East Carleton Road, Norwich Road, Main Road, Mulbarton Road, Low Road, Keswick Road (East Carleton, Mulbarton, Cringleford, Broom Ash, Keswick and Intwood, Swardeston).
HALES AND HECKINGHAM – C385 Norton Road from its junction with U76345 Pyes Mill Road for 50m eastwards to facilitate BT pole testing works between 09:30 and 15:30 on the 25th February 2025 (may continue until the 8th April 2025).
Alternative route is via: Norton Road, Beccles Road, A146 Beccles Road, B1136 Yarmouth Road, Beccles Road, Haddiscoe The Street, Norton Road (Norton Subcourse, Haddiscoe, Hales, Heckingham, Loddon, Thurlton, Raveningham).
HEDENHAM – C364 Earsham Road from its junction with B1332 Norwich Road for 110m southwards to facilitate Norfolk County Council drainage works from 25th to 26th February 2025 (may continue until 9th April 2025).
Alternative route is via: B1332 Norwich Road, A143 Bungay Road, A143 Old Railway Road, Hall Road, Norwich Road, Earsham Road.
LANGLEY WITH HARDLEY –
- C202 Staithe Road from 100m north of its junction with U76330 Forge Road for 200m southwards and
- U76330 Forge Road from its junction with C202 Staithe Road for 200m southwards to facilitate BT works on or around these locations.
09:30 and 15:30 on the 23rd February 2025 (may continue until 6th April 2025).
Alternative route is via: Langley Road, Norwich Road, A146 Loddon Bypass, A146 Loddon Road, Kirby Road, The Street, Rockland Road, Bramerton Lane, Rookery Hill, New Inn Hill, Lower Road, Claxton Corner, Ferry Road, Langley Green, Staithe Road (Framingham Pigot, Claxton, Rockland St. Mary, Chedgrave, Trowse with Newton, Kirby Bedon, Yelverton, Langley with Hardley, Hellington, Bramerton, Ashby St. Mary, Thurton, Caistor St. Edmund and Bixley, Holverston, Carleton St. Peter).
NORTH ELMHAM –
- B1145 Back Lane from its junction with B1110 Holt Road/Dereham Road for 1000m eastwards;
- B1145 Brisley Road from its junction with B1110 Bolt Road/Dereham Road for 40m westwards;
- B1110 Holt Road from its junction with B1145 Brisley Road for 200m northwards and
- B1110 Dereham Road from its junction with B1145 Back Lane for 50m southwards to facilitate Norfolk County Council carriageway resurfacing works between 19:00 and 07:00 from 25th to 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via:
1-2: B1145 Back Lane/Station Road/Elmham Road/The Street/Bawdeswell Road/Billingford Road, A1067 Fakenham Road/Norwich Road/Fakenham Road/Norwich Road/Langor Bridge/Fakenham Road/Pensthorpe Road/Clipbush Lane, A148 Fakenham Bypass, A1065 Raynham Road/Gravelpit Hill/Swaffham Road/Snarfordham Road/Castleacre Road, B1145 Lynn Road/Lexham Road/Back Street/Mileham Road/Litcham Road/The Street/Stanfield Road/Church Street/Elmham Road/Brisley Road.
- B1110 Holt Road/High Street/Pump Street/Booton Green Road/Booton Green/Brisley Road, A1067 Norwich Road/Fakenham Road, B1145 Billingford Road/Bawdeswell Road/The Street/Elmham Road, Station Road/Back Lane.
- B1110 Dereham Road/Holt Road, B1146 Fakenham Road/B1145 Stanfield Road/Church Street/Elmham Road/Brisley Road.
(Ryburgh, Bawdeswell, Twyford, Fakenham, Wellingham, Billingford, Guist, North Elmham, Litcham, Weasenham All Saints, Kettlestone, Foxley, Bintree, Raynham, Lexham, Brisley, Sculthorpe, Stanfield, Hempton, Weasenham St. Peter, Dunton, Mileham, Stibbard, Hoe and Worthing, Beetley).
OXBOROUGH – Stoke Ferry Road from its junction with Ferry Road for 20m eastwards to facilitate Anglian Water meter exchange works from 27th February to 3rd March 2025 (may continue until the 14th April 2025).
Alternative route is via: Road from Foulden to Oxborough, Oxborough Road, Tallon End, White Hart Street, Road from Foulden to Didlington, Foulden Road, Thetford Road, Whittington Hill, Stoke Ferry Bypass A134, Littlemans Way (Foulden, Stoke Ferry, Northwold, Didlington, Oxborough, Gooderstone).
SHELFANGER – C340 Lodge Lane from its junction with B1077 Diss Road for 50m westwards to facilitate Norfolk County Council works to rebuild wall from 24th to 27th February 2025 (may continue until the 10th April 2025).
Alternative route is via: Lodge Lane, Common Road, Church Road, Diss Road (Shelfanger, Bressingham).
SHIPDHAM – U35272 Birds Corner from 400m east of its junction with A1075 Dereham Road for 220m eastwards to facilitate BT pole test works between 09:30 and 15:00 on 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via: Birds Corner/Shipdham Road/Station Road, B1135 Dereham Road/Station Road, A1075 Yaxham Road/Tavern Lane/South Green/Shipdham Road/Dereham Road, U35272 Birds Corner (Whinburgh and Westfield, Dereham, Yaxham, Shipdham).
SHIPDHAM – C196 Swan Lane from its junction with A1075 Market Street to its junction with U35027 Thorpe Road to facilitate BT pole test works between 09:30 and 15:00 on the 26th February 2025 (may continue until the 11th April 2025).
Alternative route is via: A1075 Market Street, U35027 Thorpe Road, U35026 Goods Farm Lane, Swan Lane.
SHROPHAM – Grange Farm Lane from 210m west of its junction with Church Road for 90m westwards to facilitate UK Power Network new connection works from 24th to 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via: Harling Road, Bacton Church Road.
SURLINGHAM – U78016 Pratts Hill from its junction with Bramerton Road to its junction with U78016 New Road to facilitate BT pole testing works between 09:30 and 15:30 on 28th February 2025 (may continue until 11th April 2025).
Alternative route is via: Walnut Hill, School Lane, Pond Lane, New Road.
SWAFFHAM – Hasplals Road from its junction with Cley Road to its junction with London Street to facilitate Norfolk County Council resurfacing footpath scheme works from 24th February to 10th March 2025 (may continue until 21st April 2025).
Alternative route is via: London Street, White Cross Road, Cley Road, Hasplas Road.
SWAFFHAM – North Pickenham Road from its junction with Norwich Road for 800m southwards to facilitate UK Power Network new electrical connection works from 24th February to 5th March 2025 (may continue until the 16th April 2025).
Alternative route is via: Swaffham Road, South Pickenham Road, Road From South Pickenham To North Pickenham, West View, Road From South Pickenham To Swaffham, Watton Road, London Street, White Cross Road, Market Place, Station Street, Mangate Street, Norwich Road (Swaffham, North Pickenham, South Pickenham).
SWAINSTHORPE – C179 Church Road from its junction with the rail level crossing for 10m eastwards and 10m westwards to facilitate Network Rail track maintenance works between 23:30 and 05:30 from 24th to 25th February 2025 (may continue until the 8th April 2025).
Alternative route is via: Church Road, Norwich Road, Ipswich Road, Mulbarton Road, Main Road, The Common, Rectory Lane, The Warren Lane, Swainsthorpe Road (Swainsthorpe, Mulbarton, Keswick and Intwood, Stoke Holy Cross, Swardeston, Caistor St. Edmund and Bixley).
The team dealing with enquiries at Norfolk County Council is South Streetworks.
BRANCASTER – Cross Lane from 100m east of its junction with Marshside for 50m eastwards to facilitate Anglian Water remedial works from 24th to 26th February 2025 (may continue until the 9th April 2025).
Alternative route is via: Marsh Side, Main Road, Brancodunum.
CONGHAM – Grimston Road from 800m north of its junction with St Andrews Lane for 65m northwards to facilitate Norfolk County Council resurfacing works on carriageway between 19:00 and 05:00 from 24th to 25th February 2025 (may continue until the 8th April 2025).
Alternative route is via: Grimston Road, Congham Road, Gayton Road, Lynn Road, Spot Lane, Queen Elizabeth Way, Hillington Road, Station Road (Hillington, Roydon, Congham, Castle Rising, Gayton, South Wootton, Leziate, Bawsey, Grimston).
KING’S LYNN –
- Water Lane from its junction with Tuesday Market Place for 80m westwards and
- Ferry Street from its junction with Tuesday Market Place for 30m westwards to facilitate Anglian Water meter exchange works.
The road 1) will be temporarily closed and the road 2) shall be temporarily subject to the suspension of the one-way system (westbound) to allow vehicles to travel in both a westerly and easterly direction from 27th to 28th February 2025 (may continue until the 11th April 2025).
Alternative route is via: Ferry Street, Tuesday Market Place, King Street.
KING’S LYNN – Guanock Terrace from its junction with Thomas Street to its junction with Goodwins Road to facilitate Anglian Water new water connection works from 24th to 26th February 2025 (may continue until the 9th April 2025).
Alternative route is via: Guanock Terrace, London Road, Goodwins Road, London Road.
MIDDLETON – Wormgay Road from 230m south of its junction with Mill Drove for 130m southwards to facilitate Norfolk County Council drainage works from 26th to 26th February 2025 (may continue until the 9th April 2025).
Alternative route is via: Mill Drove, 10th Street, Main Road, A47 from J B1153 to J A10/A149, Lynn Road, Norwich Road, Constitution Hill, West Winch Road, Main Road, Setch Road (North Runcton, East Winch, West Winch, Middleton).
PENTNEY – Golden Gym from its junction with Narborough Road for 20m southwards to facilitate Anglian Water mains fitting works on 25th February 2025 (may until the 8th April 2025).
Alternative route is via: Golden Gym, Low Road, Narborough Road.
TERRINGTON ST. CLEMENT – Marsh Road from 170m north of its junction with Lynn Road for 50m northwards to facilitate Anglian Water remedial works to water main from 25th to 27th February 2025 (may continue until the 10th April 2025).
Alternative route is via: Marsh Road, Northgate Way, Churchgate Way, Lynn Road (Clenchwarton, Terrington St. Clement).
THORNHAM – Ship Lane from 70m east of its junction with Staithe Lane for 70m eastwards to facilitate UK Power Network new electrical cable installation works from 24th February to 7th March 2025 (may continue until the 18th April 2025).
Alternative route is via: Staithe Lane, High Street, Church Street, Ship Lane.
UPWELL – Pinfold Road from 100m south of its junction with St Peters Road for 180m southwards to facilitate Norfolk County Council installation works for apparatus in highway from 24th February to 7th March 2025 (may continue until the 18th April 2025).
Alternative route is via: Pinfold Road, Stonehouse Road, New Road, St Peters Road.
The team dealing with enquiries at Norfolk County Council is West Streetworks.
Unless otherwise stated, the effect of these Orders will be to prohibit the use by vehicles of the named road(s)/footpath(s). In the event of the start date being delayed the new start date will be displayed on site in advance. Where an Order is for a reason other than works it is because of the likelihood of danger to the public or of serious damage to the road/footpath.
Anticipated dates are stated but the Orders may continue until the end date where necessary or required. The Orders are revoked on the end date or on the actual date of removal of the prohibition/restriction where earlier without further notice. If necessary, the restrictions can have a maximum duration of 18 months for vehicular highway or 6 months for non-vehicular highway.
Penalty: £1000 maximum fine on conviction and/or endorsement for contravention.
Full details on the closures/restrictions are available at https://one.network.
Any enquiries that cannot be answered on the one.network website should be directed to the relevant Streetworks Team by email at streetworks@norfolk.gov.uk or telephone 0344 800 8020.
Dated this 21st day of February 2025.
Katrina Hulatt, Director of Legal Services (nplaw), County Hall, Martineau Lane, Norwich NR1 2DH
Need to publish a public notice?
If you need to publish a public notice, please contact Eastern Daily Press directly at: