Essex - Multiple Temporary Road Closures and Clearway Restrictions
What is happening?
Essex County Council
(Clatterbury Lane, Clavering)
(Temporary Prohibition of Traffic) Order 2024
Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order: To temporarily close that length of Clatterbury Lane, Clavering in the District of Uttlesford, from a point approximately 100m north east of its junction with The Druce for a distance of approximately 95m in a north easterly direction. The closure is scheduled to commence on 11th December 2024 for 3 days, or where stated on a valid permit (EC30042916077 - UK Power Networks). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while new connection works are undertaken by UK Power Networks.
An alternative route is available via High Street, London Road, Cambridge Road, London Road, Cambridge Road, Silver Street, Pines Hill, Stansted Road, Birchanger Roundabout, Bishops Stortford Bypass, Hadham Road, Little Hadham Bypass, Standon Road, Stortford Road, Kents Lane, Standon Hill, A10 - A120 Roundabout, A10 Puckeridge Bypass, A10 -B1368 Roundabout, A10 Puckeridge To Buntingford, A10 Buntingford Bypass Roundabout At London Road, Buntingford Bypass, Baldock Road, High Street, Hare Street Road, B1038 Between Access Road To Alswick Hall Farm And Junction With B1368, B1368 North from Junc With Hare Street Road To Biggin Hill and vice versa (with access only into B1038 from its Junction With Biggin Hill To Andersons Lane, Conduit Lane, Pump Hill, Pelham Road, Middle Street, High Street (Clavering), Clatterbury Lane and Wicken Road).
The Order came into effect on 21st November 2024 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
(Pepples Lane, Wimbish)
(Temporary Prohibition of Traffic) Order 2024
Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order: To temporarily close that length of Pepples Lane, Wimbish in the District of Uttlesford, from its junction with Thaxted Road for a distance of approximately 40m in a south easterly direction. The closure is scheduled to commence on 9th December 2024 for 3 days, or where stated on a valid permit (MX04410245156 - Affinity Water).
The scheduled dates may vary for these works with appropriate signs showing and/or displayed on one.network. The closure is required for the safety of the public and workforce while pipe relaying works are undertaken by Affinity Water.
No alternative route is available.
The Order came into effect on 21st November 2024 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
(Various Roads, District of Uttlesford)
(Temporary Prohibition of Traffic & Temporary Introduction of a Clearway)
(No.12) Order 2024
Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984.
Effect of the order:
1. To temporarily close that length of road in the District of Uttlesford as specified in the schedule to this Order.
2. A temporary 'No Waiting, No Loading and No Stopping' restriction will be introduced on both sides of carriageway on the above length of road for the duration of the closure to facilitate the works. Signs will be installed indicating when the No Waiting restriction will be in force.
"The Essex County Council (Uttlesford District) (Prohibition of Waiting, Loading and Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019" will be temporarily amended to include the temporary 'No Waiting, No Loading and No Stopping at Any Time' restriction and suspend any existing parking and waiting restrictions on the above length of road only. All other restrictions and exemptions contained in the aforementioned Order and Amendments to that Order shall remain in force.
The works being undertaken will take place within an 18-month period from 21st November 2024, exact dates will be specified on One.network. The road will be closed to facilitate each phase of works and then re-opened to the public. Access will be maintained for emergency services. Diversion routes will be signed at each location and residents will be informed of the dates of each phase via letter/leaflet drop and advanced warning signs on the road.
For all enquiries please contact our Contact Centre on 0345 603 7631.
The Order came into effect on 21st November 2024 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.
Schedule
Road | Description | Alternative Route |
Cambridge Road, Stansted/Ugley/Quendon & London Road, Ugley/Quendon/Newport & High Street, Newport | From the junction with Wicken Road to the junction with High Lane a distance of approximately 8380m | B1038 Wicken Road, B1383 Clatterbury Lane, B1383 High Street, B1383 Middle Street, B1383 Pelham Road, B1038 Pump Hill, B1038 Conduit Lane, B1038, B1368 Dassells Hill, B1368 Dassels, B1368 Hay Street, B1368 Green End, B1368 Station Road, B1368 Wickham Hill, B1368 Buntingford Road, A10, A120 RAB, A120, A120 Birchanger Roundabout, B1383 Stansted Road, B1383 Pines Hill, B1383 Silver Street, B1383 Cambridge Road and vice versa |
Need to publish a public notice?
If you need to publish a public notice, please contact Saffron Walden Reporter directly at: