M25 Motorway, Junctions 26 To 30 - Temporary Traffic Restrictions For Works
What is happening?
M25 MOTORWAY (JUNCTIONS 26 TO 30)
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that National Highways intends to make an Order on the M25 Motorway in the County of Essex, the Unitary Authority of Thurrock, and the London Borough of Havering, under Sections 14(1)(a), 14(1)(c) and 14(7) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on, or in the vicinity of, the road.
The effect of the Order would be, in phases, to: -
1. authorise the overnight closure of –
(a) sections of both carriageways of the M25 between Junction 26 (A121) and Junction 30 (A13), and all slip and link roads leading to and from those carriageways; and
(b) the hard shoulder adjacent to the lengths of carriageway and slip link roads in 1. (a) above.
2. authorise the overnight use of the hard shoulder adjacent to the lengths of carriageway and slip roads described in 1. above.
3. permit HGVs in the outside lane of the lengths of carriageway described in 1. (a) above, during inside-lane closures.
These measures would be in the interests of road safety while contractors undertake maintenance and renewal work of a cyclical nature and M25 project works other than the Junction 28 improvement works.
The duration and scope of each closure or provision above would vary depending on the nature of the maintenance work being undertaken on each occasion. The programme of works would start on or after 2nd January 2025.
There is a process which would extend the below hours on the M25 to between 19:00 and 06:00 (maximum period) on any day, subject to traffic counts and the standard local authority permissions.
The overnight closures would otherwise be in operation between:
Monday – Thursdays 22:00 – 05:30
Fridays 23:00 – 06:00
Saturdays 22:00 – 06:00
Sundays 22:30 – 05:30
Planned maintenance work would be scheduled to avoid disruption during known peak periods, although essential maintenance may be necessary during these periods to prevent the need for emergency works.
Please see National Highways website for specific details on any upcoming closures.
The Order would come into force on 2nd January 2025 and remain in force until 24th December 2025.
Traffic affected by the closures would be diverted via other junctions of the M25, or by using the M11, A10, A12, A13, A127, A128, and the A406. The diversion in operation would vary according to the closure in force, and the diversion roads listed above are the agreed routes, but these may change depending on local conditions.
The temporary closures, hard shoulder and HGV outside lane running and diversion routes would be clearly indicated by traffic signs when they are in operation during the works period.
I Rosendaal, an Official of National Highways Ltd.
Ref: NH/SE/2025/M25/RNO
National Highways, (Company No. 9346363).
Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or info@nationalhighways.co.uk, www.nationalhighways.co.uk