Bexley, Multiple Traffic Notices, Temporary Restriction of Vehicular Traffic
What is happening?
London Borough of Bexley
Temporary Restriction of Vehicular Traffic Order 2024
New Road and Westbrooke Road, Welling
Notice of Making an Order
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable Gas mains replacement by JDT Utilities on behalf of Southern Gas Networks, the effects of which will be the introduction of:
- Prohibition of traffic (road closure) entire length of New Road, Welling as and when works require
- Prohibition of traffic (road closure) entire length of Westbrooke Road, Welling as and when works require
- No waiting no loading as detailed in Schedule one of this order
The Order will come into effect on 4 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 7 weeks.
Whilst the works are in progress alternative routes will be provided via:
- Diversion for New Road
Upper Wickham Lane – Welling High Street – Park View Road – Clifton Road – Westbrooke Road and reverse
- Diversion for Westbrooke Road
New Road – Upper Wickham Lane – Welling High Street – Park View Road – Clifton Road and reverse
- Diversion for New Road
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Southern Gas Networks, 07887 825389
Schedule One
New Road, Welling both sides of carriageway for entire length
Westbrooke Road, Welling both sides of carriageway from junction Orchard to junction Clifton Road, Welling
Temporary Restriction of Vehicular Traffic Order 2024
Parkside Cross and Eversley Cross, Bexleyheath
Notice of Making an Order
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable gas mains replacement by JDT Utilities on behalf of Southern Gas Networks, the effects of which will be the introduction of:
- Prohibition of traffic (road closure) in Parkside Cross at the junction with Parkside Avenue, Bexleyheath
- Prohibition of traffic (road closure) in Eversley Cross at the junction with Parkside Avenue, Bexleyheath
- No waiting no loading (parking restrictions) as detailed in Schedule one of this order
The Order will come into effect on 4 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 10 weeks.
Whilst the works are in progress alternative routes will be provided via:
- Eversley Avenue – Old Manor Way and reverse
- Localised diversions to be sign posted as and when required
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Southern Gas Networks, 07887 825389
Schedule One
Eversley Cross, Bexleyheath both sides of carriageway from 30 meters up to and including the junction with Parkside Avenue, Bexleyheath
Parkside Cross, Bexleyheath both sides of carriageway from 30 meters up to and including the junction with Parkside Avenue, Bexleyheath
Temporary Restriction of Vehicular Traffic Order 2024
Various Roads in the London Borough of Bexley – Remembrance Day Parades
Notice of Intention
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that, to enable special events to take place, they intend to make an Order the effects of which will enable the short closure to vehicular traffic, when required by the Metropolitan Police Service of the roads in Schedule One to this Order, between 10:00am and 1:30pm on Sunday 10 November 2024, the effects of which will be the introduction of:
- Prohibition of traffic – Bexleyheath, Crayford, Foots Cray, Bexley, and Sidcup area as per Schedule One of this Order
The Order will come into effect on 10 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 1 day.
Whilst the works are in progress no alternative route will be available to use.
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Street Works Team on 02030454670
Schedule One - Road Closures
BEXLEYHEATH
- Watling Street junction with Gravel Hill
- Gravel Hill junction with Albion Road
- Highland Road junction with Albion Road
- Albion Road junction with Oaklands Road
- Memorial site (Arrival and departure)
CRAYFORD
- Church Hill
- Manor Road, Crayford
- Mayplace Road East, memorial site
SIDCUP/FOOTS CRAY
- Main Road, Sidcup
- Station Road, Sidcup
- Sidcup High Street
- Church Road
- Chislehurst Road, Memorial site
- Rectory Lane (from All Saints Church to memorial site)
BEXLEY
- Hurst Road junction Bexley High Street
- Hurst Road junction with Manor Way memorial site
Temporary Restriction of Vehicular Traffic Order 2024
Parkside Avenue and Old Manor Way, Bexleyheath
Notice of Making an Order
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable gas mains replacement by JDT Utilities on behalf of Southern Gas Networks, the effects of which will be the introduction of:
- Prohibition of traffic (road closure) in Parkside Avenue from junction with roundabout at Northend Road to junction with Old Manor Way, Bexleyheath
- Prohibition of traffic (road closure) in Old Manor Way from junction with Parkside Avenue to junction with Old Manor Way, Bexleyheath
- No waiting no loading (parking restrictions) as detailed in Schedule one of this order
The Order will come into effect on 4 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 10 weeks.
Whilst the works are in progress alternative routes will be provided via:
- Northend Road – Eversley Avenue – Old Manor Way and reverse
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Southern Gas Networks, 07887 825389
Schedule One
Parkside Avenue, Bexleyheath, both sides of carriageway for entire length
Old Manor Way, Bexleyheath on both sides of carriageway from junction with Parkside Avenue to junction with Old Manor Way, Bexleyheath
Temporary Restriction of Vehicular Traffic Order 2024
Various Roads as listed in Schedule One of this Order
Notice of Making an Order
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable The Annual Firework Display, Danson Park for the Welling Round Table, the effects of which will be the introduction of:
- Waiting restriction and Loading prohibition in the following roads as listed in Schedule One of the Order.
The Order will come into effect on 2 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 1 day.
Whilst the works are in progress, no alternative route will be required.
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Kerry Allon (Welling Round Table) – Contact No: 07834733963
Schedule One
Bean Road, Bexleyheath
The entire length on both sides
Danson Lane, Welling
The entire length on both sides of the junction with Merlin Road
Danson Road, Bexleyheath
The entire length on both sides, including the cul de sac between No. 89 and 105 on the east kerb.
Danson Underpass, Bexley
The entire length and on both sides
Lakeside Close, Sidcup
From the southern curtilage of 5 and 6 Lakeside Close to the carriageway comprised in the roundabout at the junction of Danson Road, Danson Underpass, Lakeside Close and Lodge Lane
The Grove, Bexleyheath
The entire length on both sides
Sandhurst Road, Bexleyheath
The entire length on both sides
Askern Close, Bexleyheath
The entire length on both sides
The junction of Park View Road, Crook Log and Danson Road
This junction only, will be subject to traffic management, under the control of the Metropolitan Police. They will direct traffic and when required during and within 2 hours after the event has finished to facilitate safe passage of all road users.
Temporary Restriction of Vehicular Traffic Order 2024
Hudson Road, Franklin Road, Bexleyheath
Notice of Intention
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that, to enable JDT on behalf of Southern Gas Networks to carry out gas main replacement works, they intend to make an Order the effects of which will be the introduction of:
- No waiting and no loading on Long Lane from the junction on Cloudesley Road to Pickford Lane, both sides of the carriageway
- No waiting and no loading on Hudson Road at the junction of Long Lane, 30m both sides of the carriageway
- No waiting and no loading on Franklin Road at the junction of Long Lane, 30m both sides of the carriageway
- A road closure on Hudson Road at the junction of Long Lane, 30m into Hudson Road
- A road closure on Franklin Road at the junction of Long Lane, 30m into Franklin Road
The Order will come into effect on 7th November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 6 weeks.
Whilst the works are in progress, alternative routes will be via:
- Hudson Road
Hudson Road, Sheldon Road, Belvedere Road, Long Lane & Reverse
- Franklin Road
Franklin Road, Coote Road, Hudson Road, Long Lane & Reverse
- Hudson Road
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated: 30th October 2024
Further enquiries in respect of this notice should be addressed to:
Southern Gas Networks, 07887 825389
The Bexley (Waiting and Loading Restriction) (Amendment No. 30) Traffic Order 2024
The London Borough of Bexley have on 28 October 2024 made a Traffic Order under the Road Traffic Regulation Act 1984. The Order would:
a) Introduce new "At any time" no waiting restrictions in parts of:
- Alton Close Bexley
- Arbuthnot Lane Bexleyheath
- Ashcroft Avenue Blackfen
- Barnfield Road Belvedere
- Blendon Road Blackfen
- Brantwood Road Bexleyheath
- Burns Close Slade Green
- Chesnut Road Belvedere
- Clydesdale Way Erith
- Crofton Avenue Bexley
- Eastry Road Bexleyheath
- Gladeswood Road Belvedere
- Grosvenor Road Belvedere
- Hadley Road Belvedere
- Halt Robin Road Belvedere
- Hill View Drive Welling
- Holmsdale Grove Barnehurst
- Iron Mill Lane Crayford
- Kingswood Avenue Belvedere
- Lincoln Road Slade Green
- Lullingstone Road Belvedere
- Lyndhurst Road Bexleyheath
- Meadowview Road Bexley
- Methuen Road Belvedere
- Milford Close Belvedere
- Montpellier Avenue Bexley
- Newbery Road Slade Green
- Old Road Bexleyheath
- Park Mead Blackfen
- Parsonage Manorway Bexleyheath
- Penhill Road Sidcup
- Plaxtol Road Bexleyheath
- Poplar Mount Belvedere
- Powerscroft Road Sidcup
- Roberts Road Belvedere
- Rochester Close Blackfen
- Rowley Avenue Sidcup
- Rudland Road Bexleyheath
- Salmon Road Belvedere
- School Crescent Crayford
- St Augustines Road Belvedere
- Sandville Close Belvedere
- Wellington Avenue Blackfen
- Westergate Road Belvedere
- Willow Avenue Blackfen
- Woodside Road Bexleyheath
- Woolwich Road Belvedere
b) Add lengths of "At any time" no waiting restrictions to existing "At any time" no waiting restrictions in parts of:
- Arbuthnot Lane Bexleyheath
- Brendon Close Erith
- Freemantle Road Belvedere
- High Beeches Sidcup
- Howbury Lane Slade Green
- Maple Crescent Blackfen
- Meadowview Road Bexley
- Rushdene Abbey Wood
- Shenstone Close Bexleyheath
- St James Way Sidcup
- Upper Park Road Belvedere
c) Replace "Mon – Sun 8.00am – 6.30pm" no waiting restrictions with "At any time" no waiting restrictions in parts of:
- Blendon Road Bexley
- Brantwood Road Bexleyheath
- Lyndhurst Road Bexleyheath
- Maple Crescent Blackfen
- Milford Close Belvedere
- Rudland Road Bexleyheath
- Sedgemere Road Abbey Wood
- Sydney Road Abbey Wood
- Westergate Road Belvedere
Copies of the Order, which becomes operational on 4 November 2024, the corresponding Parent Order (and the Orders that have amended that Order); the Council’s Statement of Reasons for making the Order and plans which indicate the length of roads to which the Order relates can be inspected during normal office hours on Mondays to Fridays inclusive, at the Contact Centre, 2 Watling Street, Bexleyheath, Kent DA6 7AT.
Further information may be obtained by telephoning Omar Tingling on 0203 045 3947.
Persons desiring to question the validity of the Order or of any provision contained therein on the grounds that it is not within the powers of the Road Traffic Regulation Act 1984, or that any of the relevant requirements thereof or of any regulations made thereunder has not been complied with in relation to the Order may, within six weeks of the day on which the Order was made, make application for the purpose to the High Court.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated: 30 October 2024
Temporary Restriction of Vehicular Traffic Order 2024
Alexander Road, Bexleyheath
Notice of Making an Order
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that an order has been made, to enable JDT Utilities Ltd on behalf of Southern Gas Networks, the effects of which will be the introduction of:
? Prohibition of traffic on Alexander Road Bexleyheath
? Waiting restriction and Loading Prohibition entire length of the road (both sides of the carriageway)
Restrictions will be removed when not required.
The Order will come into effect on 4 November 2024 and is valid for a period of 18 months. However, the works are expected to be completed within 4 weeks.
Whilst the works are in progress alternative routes will be provided via: Normanhurst Avenue, Brampton Road, Holmesdale Road, and reverse.
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated 30 October 2024
Further enquiries in respect of this notice should be addressed to:
Southern Gas Networks - 07887825389
Temporary Restriction of Vehicular Traffic Order 2024
Electric Vehicle bays – Borough wide
Notice of Intention
The London Borough of Bexley, being the Traffic Authority for the above-mentioned road, in exercise of powers conferred by section 14(1) of the Road Traffic Regulation Act 1984, HEREBY GIVE NOTICE that, to enable them to temporarily change the parking arrangements at Electric Vehicle bays Borough wide, they intend to make an Order the effects of which will be the introduction of:
? Electric Vehicles Only to park at all times in bays specified in Schedule 1 of this order.
The Order will come into effect on 7 November 2024 and is valid for a period of 18 months. However, the temporary change is only expected to be in force for 6 months.
Whilst the works are in progress no alternative routes will be required.
Nothing in this Notice will apply to anything done with the permission or at the direction of a police constable in uniform or traffic warden, to emergency service vehicles, or to vehicles being used in connection with the works.
The restrictions described above will apply only during such times and to such extent as shall be indicated by traffic signs as prescribed by the Traffic Signs Regulations and General Directions 2016.
Andrew Bashford
Head of Highways, Traffic and Infrastructure
Dated: 30 October 2024
Further enquiries in respect of this notice should be addressed to: EV Charging team, London Borough of Bexley Evcharging@bexley.gov.uk
Schedule 1
Bellegrove Road Welling
Erith Road Bexleyheath
Methuen Road Bexleyheath
Nuxley Road Belvedere
Picardy Street Belvedere
Sandford Road Bexleyheath
Sherwood Park Avenue Blackfen
St Johns Road Sidcup
The Oval Sidcup
Walnut Tree Road Erith
Waterside Crayford
Need to publish a public notice?
If you need to publish a public notice, please contact Bromley News Shopper directly at: