Comeragh Road - Temporary Prohibition of Traffic For Crane Operation Works
What is happening?
London Borough Of Hammersmith And Fulham
Road Traffic Regulation Act 1984 Section 14(1) (Comeragh Road) Temporary Prohibition Of Traffic
1. The Council of the London Borough of Hammersmith and Fulham hereby gives notice that in order to facilitate crane operation works in the above-named location; it intends to make an Order the effect of which would temporarily prohibit traffic and introduce “at any time” waiting restrictions in a section of the above named road.
2. Whilst works are in progress, or whilst the authorised traffic signs are displayed, no person shall cause or permit any vehicle to proceed to enter, stop, wait, load or unload in Comeragh Road from No. 111 to No. 91.
3. An alternative route for traffic in article 2 shall not be required.
4. Exemptions would be provided in the Order to permit reasonable access to premises, so far as it is practical without interference with the execution of the said work and for works vehicles, any vehicle being used in connection with police, fire or ambulance purposes and anything done with the permission or at the direction of a police constable in uniform.
5. The Order would come into operation on the 8th November 2024 and would be valid for a maximum period of 18 months or until works are completed, whichever is the sooner.
6. Works would be expected to commence on Friday 8th November 2024 and last until 9th November 2024.
Backup dates would be on the 15th November 2024 to the 16th November 2024 and the 22nd November 2024 to the 23 rd November 2024.
The dates specified are for guidance and informative purposes only and works may extend outside these dates.
Dated this 4th day of October 2024
Masum Choudhury Assistant Director of Transport Public Realm