Dunstable Place - Temporary Prohibition Of Through Traffic
What is happening?
THE BOROUGH OF LUTON
(DUNSTABLE PLACE)
(TEMPORARY ROAD CLOSURE)
ORDER 2024
NOTICE is hereby given that Luton Borough Council, the Highway Authority for the said Borough, on 5th August 2024 made the above Order under the relevant provisions of the Road Traffic Regulation Act 1984 (as amended).
The Order will come into operation on 2nd September 2024 for a period of 18 months or when the proposed works have been completed, whichever is the earlier. Anticipated dates of closures 2nd September 2024 to 6th September 2024. Specific dates and times will be signed locally. The Order will therefore be in operation during such date and time and to such extent as indicated by traffic signs, barriers or cones.
The effect of the Order will allow the Council to close to vehicular traffic Dunstable Place the whole length. Diversion route via Stuart Street, Wellington Street, Upper George Street.
The Order is intended to create a window for the works to be done and it is anticipated that the works will be completed over a period within the date described as above. The purpose of the Order is to enable new electricity connection works to be carried out. Access will be maintained as best as possible to properties where this may be done safely whilst such works are being carried out and diversions for traffic will be marked by signs. Details of road closures and diversions can be found at http://www.luton.gov.uk/roadworks, or telephone TBF Traffic public enquiry number on 01449 490865.
7th August 2024
Highway Services Manager
Building 14, Central Depot
Kingsway, Luton LU4 8AU