Cosgrove Way - Temporary Road Closure
What is happening?
THE BOROUGH OF LUTON
(VARIOUS ROADS)
(TEMPORARY ROAD CLOSURES)
(No.11) ORDER 2024
NOTICE is hereby given that Luton Borough Council, the Highway Authority for the said Borough, on 8th July 2024 made the above Order under the relevant provisions of the Road Traffic Regulation Act 1984 (as amended).
The Order will come into operation on 2nd August 2024 for a period of 18 months or when the proposed works have been completed, whichever is the earlier. Specific dates and times will be signed locally. The Order will therefore be in operation during such date and time and to such extent as indicated by traffic signs, barriers or cones.
The effect of the Order will allow the Council to close to vehicular traffic the following roads and lengths of roads:
Cosgrove Way the whole length. Diversion not available. Anticipated dates and times of closure 2nd August 2024 to 5th August 2024, 8pm to 5am.
Bilton Way from its junction with Dallow Road to a point outside of the Merson Group building. Diversion route via Dallow Road, Bilton Way. Anticipated dates and times of closures 9th August 2024 to 12th August 2024, 8pm to 5am.
Camford Way the whole length. Diversion route not available. Anticipated dates and times of closures 16th August 2024 to 19th August 2024, 8pm to 5am.
Birdsfoot Lane the whole length. Diversion route via Birdsfoot Lane, Barton Road, Riddy Lane. Alternatively via Icknield Way, Catsbrook Road. Anticipated dates of closures 5th August 2024 to 23rd August 2024.
Redwood Drive the whole length. Diversion not available. Anticipated dates of closure 13th August 2024 to 23rd August 2024.
Barton Road service road from a point outside of property No.40 to property No.66, and from a point outside of property No.66 to property No.92. Diversion not available. Anticipated dates of closures 6th August 2024 to 21st August 2024.
The Order is intended to create a window for the works to be done and it is anticipated that the works will be completed over a period as described above. The purpose of the Order is to enable carriageway surfacing works to be carried out. For the period of the closure, the Order will also provide for “No Waiting and No Loading” restrictions to apply within the roads and lengths of roads closed for said works. Any vehicle deemed to be in contravention of the restrictions will be issued with a penalty charge notice and removed. This will be in force when traffic signs, barriers or cones are displayed. Access will be maintained as best as possible to properties where this may be done safely whilst such works are being carried out and diversions for traffic will be marked by signs. Details of road closures and diversions can be found at http://www.luton.gov. uk/roadworks, or telephone Volker Highways OOH Call Centre on 01582 693469.
10th July 2024
Highway Services Manager
Building 14, Central Depot
Kingsway, Luton LU4 8AU