NOTICE is hereby given that Luton Borough Council, the Highway Authority for the said Borough, on 13th May 2024 made the above Order under the relevant provisions of the Road Traffic Regulation Act 1984 (as amended).
The Order will come into operation on 29th May 2024 for a period of 6 months or when the proposed works have been completed, whichever is the earlier. Anticipated dates and times of closure 29th May 2024 to 31st May 2024, 8am to 4pm. Specific dates and times will be signed locally. The Order will therefore be in operation during such date and time and to such extent as indicated by traffic signs, barriers or cones.
The effect of the Order will allow the Council to close to vehicular traffic Butterfield Green Road from a point outside No.2 Butterfield Green Road to a point approximately 30 metres northwards . Diversion route not available.
The Order is intended to create a window for the works to be done and it is anticipated that the works will be completed over a period within the date described as above. The purpose of the Order is to allow essential mains water repair works to be carried out. Access will be maintained as best as possible to properties where this may be done safely whilst such works are being carried out. Details of road closures can be found at http://www.luton.gov.uk/ roadworks
15th May 2024
Highway Services Manager
Building 14, Central Depot
Kingsway, Luton LU4 8AU