Porth - Multiple Road Closures to Carry Out Excavation Works for the Installation of Fibre Networks
What is happening?
CYNGOR BWRDEISTREF SIROL RHONDDA CYNON TAF
(LLEOLIADAU AMRYWIOL, PORTH, CWM CLYDACH A THONYPANDY)
GORCHYMYN (CAU FFORDD DROS DRO) 2024
DYMA HYSBYSIAD bod Cyngor Bwrdeistref Sirol Rhondda Cynon Taf yn bwriadu gwneud Gorchymyn, ar ôl o leiaf 7 diwrnod o ddyddiad yr Hysbysiad yma, o dan Adran 14 o Ddeddf Rheoleiddio Traffig Ffyrdd 1984, fel y'i diwygiwyd gan Ddeddf Traffig Ffyrdd (Cyfyngiadau Dros Dro) 1991, a fydd yn para deunaw mis ar y mwyaf.
Mae angen cau'r ffyrdd er mwyn cynnal gwaith tyllu cyn gosod rhwydweithiau ffibr.
Effaith y Gorchymyn fydd cau'r rhannau canlynol o ffyrdd, rhwng 8am a 5pm yn ystod y dyddiadau sydd wedi'u nodi, neu hyd nes bydd y gwaith wedi'i gwblhau:-
1. Y lôn y tu ôl i Rifau 1 - 35 Stryd Howard, Cwm Clydach
Llwybr Amgen - ewch ar hyd Stryd Howard
Hyd y gwaith - 15-17 Ebrill 2024
2. Heol Penrhiwgwynt, Y Porth
Does dim llwybr amgen ar gael ond bydd mynediad yn cael ei gynnal ar gyfer cerbydau preswylwyr
Hyd y gwaith - 15-19 Ebrill 2024
3. Y lôn y tu ôl i Rif 49 - 96 Stryd Y Parc, Cwm Clydach
Llwybr Amgen - ewch ar hyd Teras Emlyn a Stryd y Parc
Hyd y gwaith - 16-18 Ebrill 2024
4. Teras Adare, Tonypandy
Llwybr Amgen - ewch ar hyd Heol y Drindod a Stryd Dunraven
Hyd y gwaith - 16 Ebrill 2024
5. Heol y Drindod, Tonypandy, o'i chyffordd â Theras Holborn i'w chyffordd â Stryd Dunraven a Stryd Eleanor, Tonypandy, i'w chyffordd â Heol y Drindod, tua'r gogledd-orllewin am bellter o 45 metr.
Hyd y gwaith - 17-21 Ebrill 2024
6. Y lôn ger Rhif 3 Stryd y Banc, Pen-y-graig.
Llwybr Amgen - ewch ar hyd Teras yr Hendre a Stryd y Banc
Hyd y gwaith - 18-20 Ebrill 2024
7. Teras y Goedwig ac Adeiladau Maes-y-Coed, Porth
Does dim llwybr amgen ar gael ond bydd mynediad yn cael ei gynnal ar gyfer cerbydau preswylwyr
Hyd y gwaith - 18-22 Ebrill 2024
8. Rhes Clifton, Y Porth
Does dim llwybr amgen ar gael ond bydd mynediad yn cael ei gynnal ar gyfer cerbydau preswylwyr
Hyd y gwaith - 29 Ebrill - 3 Mai 2024
Bydd mynediad ar gael i gerddwyr ac i gerbydau'r gwasanaethau brys.
Bydd mynediad ar gael i eiddo.
Dyddiad 3 Ebrill 2024
Andrew Wilkins
Cyfarwyddwr y Gwasanaethau Cyfreithiol a Llywodraethol
2 Llys Cadwyn, Stryd Taf, Pontypridd, CF37 4TH
RHONDDA CYNON TAFF COUNTY BOROUGH COUNCIL
(VARIOUS LOCATIONS, PORTH, CLYDACH AND TONYPANDY)
(TEMPORARY ROAD CLOSURE) ORDER 2024
NOTICE IS HEREBY GIVEN that the Rhondda Cynon Taff County Borough Council, intends, not less than 7 days from the date of this Notice, to make an Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, which will have a maximum duration of eighteen months.
The closure is necessary to carry out excavation works for the installation of fibre networks.
The effect of the Order will be to close the following sections of roads, between 8:00am and 5:00pm on the specified dates, or until such time as the works have been competed:-
1. Lane to the rear of No. 1 – 35 Howard Street, Clydach
Alternative Route – via Howard Street
Duration – 15th – 17th April 2024
2. Penrhiwgwynt Road, Porth
No alternative route available, but access will be maintained for residents’ vehicles
Duration – 15th – 19th April 2024
3. Lane to the rear of No. 49 – 96 Park Street, Clydach
Alternative Route – via Emlyn Terrace and Park Street
Duration – 16th – 18th April 2024
4. Adare Terrace, Tonypandy
Alternative Route – via Trinity Road and Dunraven Street
Duration – 16th April 2024
5. Trinity Road, Tonypandy, from its junction with Holborn Terrace to its junction with Dunraven Street & Eleanor Street, Tonypandy, from its junction with Trinity Road, north-westwards for a distance of 45 metres
Duration – 17th – 21st April 2024
6. Lane to the side of No. 3 Bank Street, Penygraig
Alternative Route – via Hendre Terrace and Bank Street
Duration – 18th – 20th April 2024
7. Woodland Terrace and Woodfield Buildings, Porth
No alternative route available, but access will be maintained for residents’ vehicles
Duration – 18th – 22nd April 2024
8. Clifton Row, Porth
No alternative route available, but access will be maintained for residents’ vehicles
Duration – 29th April – 3rd May 2024
Access will be maintained for pedestrians and emergency service vehicles
Access to premises will be maintained
Dated 3rd April 2024
Andrew Wilkins
Director of Legal and Democratic Services
2 Llys Cadwyn, Taff Street, Pontypridd, CF37 4TH
Need to publish a public notice?
If you need to publish a public notice, please contact Western Mail directly at: