Sandwell - Various Temporary Road Works
What is happening?
The Borough Council of Sandwell (A461 Horseley Heath, Tipton)
(Temporary Side Road Closures) Order 2024 intends to temporarily prohibit
vehicles from proceeding along the following roads located off A461 Horseley
Heath: Lewis Street from its junction with Horseley Heath for a distance of
30 metres inasoutherly direction (anticipated date 11/04/2024). Traffic will
be diverted via Tame Road, Ballfields, Horseley Heath and vice-versa.
Ballfields from its junction with Horseley Heath for a distance of 30 metres in
a southerly direction (anticipated date 11/04/2024). Traffic will be diverted via
Horseley Heath, Lewis Street, Tame Road and vice-versa. Scott Street
(easterly entrance) from its junction with Horseley Heath for a distance of
30 metres in a northerly direction (anticipated date 11/04/2024). Traffic will
be diverted via Horseley Heath, Scott Street (westerly entrance) and
vice-versa. Providence Street from its junction with Horseley Heath for a
distance of 30 metres in a southerly direction (anticipated date 12/04/2024).
Traffic will be diverted via Tame Road, Horseley Heath and vice-versa.
Railway Street from its junction with Horseley Heath foradistance of
30 metres in a northerly direction (anticipated date 12/04/2024). Traffic will
be diverted via Horseley Heath, Horseley Road and vice-versa. Scott Street
(westerly entrance) from its junction with Horseley Heath for a distance of
30 metres in a northerly direction (anticipated date 12/04/2024). Traffic will
be diverted via Scott Street, Horseley Heath and vice-versa. The maximum
duration is 18 months but the work is expected to be completed by
12/04/2024 effective from 11/04/2024. Affected side roads will be closed one
at at time (8am - 6pm only). Purpose – to facilitate the construction of speed
tables associated withanew cycleway by Bridge Construction for Sandwell
MBC. For more information please contact Richard Lewis of Bridge
Construction – 07960 193277.
The Borough Council of Sandwell (A34 Birmingham Road, Great Barr)
(Temporary Gap Closures and Prohibitions of Turning) Order 2024 intends
to temporarily prohibit vehicles from proceeding along A34 Birmingham Road
as follows (7pm - 6am only): 1) Vehicles will be prohibited from turning right
off A34 Birmingham Road northbound into Sundial Lane and the gap in the
central reservation located opposite Sundial Lane will be closed. Traffic will be
diverted via A34 Birmingham Road northbound, around M6 J7 Gyratory and
back via A34 Birmingham Road southbound. 2) Vehicles will be prohibited
from turning right off A34 Birmingham Road southbound into Cross Lane and
the gap in the central reservation opposite Cross Lane will be closed. Traffic
will be diverted via A34 Birmingham Road southbound, A34 Walsall Road
southbound, U Turn opposite the turn for B4124 Old Walsall Road and back
via A34 Walsall Road and A34 Birmingham Road northbound. The maximum
duration is 18 months but the work is expected to be completed by
09/04/2024 effective from 06/04/2024. Purpose – to facilitate tarmacing and
white lining on A34 Birmingham Road by Colas Ltd for Transport for West
Midlands (part of the Sprint scheme). For more information please contact
Jamie Reardon of Colas Ltd – 07737 998432.
The Borough Council of Sandwell (Providence Street, Cradley Heath)
(Temporary Road Closure) and (Fox Oak Street, Cradley Heath)
(Temporary 20mph Speed Restriction) Order 2024 intends to temporarily
prohibit vehicles from proceeding along Providence Street at the junction of
Fox Oak Street. Access to any affected frontages will be maintained, but only
when safety permits. Traffic will be diverted via Fox Oak Street, Newtown
Lane and vice-versa. A 20mph temporary speed restriction will be
implemented on Fox Oak Street between the junctions of Newtown Lane
and Tibbetts Road (eastern side). The maximum duration is 18 months but
the work is expected to be completed by 12/09/24 effective from 11/04/24
(24hr). Purpose–to facilitate urgent access for repairs to the TESCO retaining
wall by Uplands Retail.
How long will it take?
Planned start
28-Mar-2024
Estimated end
10-Apr-2024
Open to feedback
From
28-Mar-2024
To
10-Apr-2024