M25 Motorway – Junctions 5 to 7 and M26 Motorway - Temporary Traffic Restrictions

KT11 3DBPublished 22/02/24Expired
Surrey Mirror • 

What is happening?

M25 MOTORWAY – JUNCTIONS 5 TO 7 and M26 MOTORWAY (WESTBOUND)
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that National Highways Limited has made an Order on the
M25 and M26 Motorways in the Counties of Kent and Surrey under Section 14(1)
(a) of the Road Traffic Regulation Act 1984 because works are proposed to be
executed on the road.
The effect of the Order will be to: -
1. authorise the overnight closure of –
(a) the westbound carriageway of the M26 between the tip of the nosing of the
exit slip at Junction 2a (A20) and its merge with the M25 at Junction 5
(M26/A21); and
(b) the link road connecting from the northbound carriageway of the A21 to the
clockwise carriageway of the M25 at Junction 5 (M26/A21).
2. impose a 24-hour 50mph speed restriction on –
(a) the continuous westbound carriageway of the M26 and the clockwise
carriageway of the M25 between the centreline of the A224 (London Road)
overbridge and the centreline of the M23 main carriageway overbridge;
(b) the clockwise link carriageway of the M25 (between its divergence from the
A21 southbound carriageway and its merge with the westbound carriageway
of the M26) between a point approximately 122 Metres south-west of the
centreline of the M26 eastbound carriageway overbridge and its merge with
the westbound carriageway of the M26;
(c) the continuous anti-clockwise carriageway of the M25 and the eastbound
carriageway of the M26 between the centreline of the M23 main carriageway
overbridge and the centreline of the M25 clockwise link carriageway overbridge;
(d) the anti-clockwise link carriageway of the M25 (between its divergence
from the M26 eastbound carriageway and its merge with the northbound
carriageway of the A21) between its divergence from the M26 and the
centreline of Chevening Road (unclassified) overbridge;
(e) the link road connecting from the northbound carriageway of the A21 to the
clockwise carriageway of the M25 at Junction 5 (M26/A21);
(f) all of the roads leading to and from both carriageways of the M25 at Clacket
Lane Services;
(g) all of the roads leading to and from both carriageways of the M25 at Junction
6 (A22);
(h) the link road connecting from the southbound carriageway of the M23 to the
anti-clockwise carriageway of the M25 at M23 Junction 8 (M25 Junction 7);
(i) the link road connecting from the northbound carriageway of the M23 to the
anti-clockwise carriageway of the M25 (from its point of divergence from
the link leading to the clockwise carriageway of the M25) at M23 Junction 8
(M25 Junction 7); and
(j) the link roads connecting from the clockwise carriageway of the M25 to both
carriageways of the M23 at M25 Junction 7 (M23 Junction 8).
3. Impose, alternatively, a 24-hour 60mph speed restriction on the lengths of
carriageway and slip/link roads described in 2. above.
These measures are in the interests of road safety while contractors undertake
installation of new emergency refuge areas, stopped vehicle detection (SVD)
upgrade, and all associated works.
It is expected that the work will last for approximately 18 months starting on or after
Monday 4th March 2024. The overnight closures of the links described above will
take place between the following hours (maximum periods) -
Mondays – Thursdays 22:00 – 05:30
Fridays 23:00 – 06:00
Saturdays 22:00 – 06:00
Sundays 22:30 – 05:30
The Order will come into force on 2nd March 2024 and have a maximum duration
of eighteen months, ceasing when the works are complete. Please visit National
Highways website for closure details.
Through traffic affected by the closure of the westbound M26 as in 1(a) above will
be strategically diverted London-bound on the M20 from Junction 3 to Junction 1
(M25 Junction 3). Traffic affected by the closure of the link road as in 1(b) above will
be diverted northbound/anti-clockwise on the A21 and M25 to Junction 4
(A21 Spur/A224) and return.
The temporary speed limits, closures and diversion routes will be clearly indicated
by traffic signs when they are in operation during the works period.
H Blyth, an Official of National Highways Limited.
Ref: NH/SE/2024/M25/12
National Highways Limited, (Company No. 9346363). Registered Office: Bridge
House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in
England and Wales.
For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or
info@nationalhighways.co.uk. www.nationalhighways.co.uk

Need to publish a public notice?

If you need to publish a public notice, please contact Surrey Mirror directly at:

publicnoticesteam@reachplc.com

01227 907972

About Us

The Public Notice Portal is owned and operated by the News Media Association, the voice of UK national, regional, and local newspapers in all their print and digital forms. NMA members include nearly 900 local and regional news titles which reach 40 million people across the length and breadth of the country each month.

Public Notice PortalNews Media Association