Peterborough, Various Locations - Traffic Orders
What is happening?
PETERBOROUGH CITY COUNCIL
HIGHWAYS
Notice is given that the Council of the City of Peterborough has made an Order pursuant to section 14(1)(a) of the Road Traffic Regulation Act 1984:
The City of Peterborough Welland Road, Dogsthorpe, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-409
The effect of which is to stop any vehicle from proceeding along the road known as Welland Road, Dogsthorpe, as lies between Furze Ride and A47. The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above road. The alternative route for vehicles affected by this order is via: Welland Rd, St Pauls Rd, Fulbridge Rd, A47 and vice versa. The proposed order will come into force on the 23/02/2024 and will continue until the development site access works have been completed or until the 22/02/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place overnight between 20:00hrs and 06:00hrs from the 23/02/2024 to the 24/02/2024. For further information please contact Sunbelt Rentals on 03700 500792. RC2
The City of Peterborough Thorpe Lea Road, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-392
The effect of which is to stop any vehicle from proceeding along the road known as Thorpe Lea Road, at its junction with Thorpe Road. The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above road. The alternative route for vehicles affected by this order is Thorpe Lea Road, Vermont Grove, The Drive and Vice Versa. The proposed order will come into force on the 26/02/2024 and will continue until the replacement footway box works have been completed or until the 25/02/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between the 26/02/2024 and the 28/02/2024. For further information please contact Sunbelt Rentals on 03700 500792. RC2
The City of Peterborough Various Footpaths – Widening & Resurfacing Works Schedule, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-422
The effect of which is to stop any pedestrian or cyclist from proceeding along the footpaths/cycle paths known as Various Footpaths-Widening & Resurfacing Works Schedule, see below schedule for details:
Location | Diversion Route | Traffic Order | Duration |
Ferry Walk, Thorpe Wood, as lies between A47 and Thorpe Wood Golf Course |
Ferry Walk, Milton Ferry Bridge to Thorpe Wood Under, Peterborough Drive, Thorpe Wood and vice versa |
Footway Closure |
26/02/2024 to 22/03/2024 |
North Bank To Fitzwilliam Bridge Cycle Path, Green Wheel as lies between Second Drove and Third Drove along the River Nene |
Across The River Nene on The Shanks Millenium Bridge, Thorney 7 Section 1 Footpath, Public Right of Way through to South Bank Cycle path, Stanground South 3 Section 1 Bridleway, Daffodil Grove, North St, Mount Pleasant, Church St, Church Lane, Boongate to St Johns Rd Cycle Path, Peterborough 44 Section 1 Footpath, Fengate, Peterborough 45 Section 1 Footpath and vice versa |
Footway Closure |
04/03/2024 to 29/03/2024 |
Pearces Road to The River Nene Cycle Path, Green Wheel as lies between Pearces Rd and Flag Fen |
Northey Road, The Droveway, Pearces Rd To The River Nene Cycle Path |
Footway Closure |
18/03/2024 to 26/04/2024 |
The Council is satisfied that pedestrians and cyclists should be prohibited due to works being proposed to be executed on the above footpaths/cycle paths. The alternative routes for pedestrians and cyclists affected by this order are detailed in the above schedule. The proposed Order will come into operation on 26/02/2024 and will continue until the Footpath Widening & Resurfacing Works have been completed or until the 25/08/2024, whichever is the earlier. It is anticipated that the works will be carried out between the 26/02/2024 and the 26/04/2024. For further information please contact Milestone on 07803 259418. FP2
The City of Peterborough Peterborough Road and Marholm Road, Castor. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-430
The effect of which is to stop any vehicle from proceeding along the roads known as Peterborough Road and Marholm Road, Castor, as lies between Mill Lane and A47 on slip. The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above roads. The alternative routes for vehicles affected by this order are: Peterborough Road Diversion – Peterborough Road, A47 and vice versa. Marholm Road Diversion – Castor Road, Stamford Road, King Street, Langley Bush Road, Sutton Heath Road, A47 and vice versa. The proposed order will come into force on the 26/02/2024 and will continue until the resurfacing and associated works have been completed or until the 25/02/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between overnight 20:00hrs to 06:00hrs between 26/02/2024 and 02/03/2024. RC2
The City of Peterborough Fletton Parkway Roundabout 3 and neighbouring roads, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-431
The effect of which is to stop any vehicle from proceeding along the roads shown in the schedule below.
Fletton Parkway Roundabout 3 Eastbound Off Slip Road |
To Hampton: Fletton Parkway Eastbound, Fletton Parkway Jct 5 roundabout, Fletton Parkway Westbound, Fletton Parkway Jct 3 To Nene Parkway: As below |
Road Closure 20.00 to 06.00 |
26/02/2024 to 02/03/2024 |
Nene Parkway as lies between Fletton Parkway and Nene Parkway Jct 31 |
Nene Parkway, A47, Paston Parkway, Frank Perkins Parkway, Fletton Parkway and vice versa |
||
Nene Parkway Roundabout 31 Southbound On Slip Road |
|||
Fletton Parkway Roundabout 3 (Northern Half) |
|||
Fletton Parkway Roundabout 3 Eastbound On Slip Road |
|||
Fletton Parkway Roundabout 3 Westbound Off Slip Road |
To Hampton: Fletton Parkway, A1(M) southbound, A15 London Road. Non-Motorway Traffic: Fletton Parkway, Natures Way, West Lake Avenue To Nene Parkway: Fletton Parkway Westbound, Fletton Parkway Roundabout 2, Fletton Parkway Eastbound, Fletton Parkway Jct 3 |
Road Closure 20.00 to 06.00 |
4/03/2024 to 13/03/2024 (week nights only) |
Fletton Parkway Roundabout 3 (Southern Half) |
|||
Fletton Parkway Roundabout 3 Westbound On Slip Road |
|||
Hargate Way at its junction with The Serpentine |
To Fletton Parkway Jct 3: Hargate Way, Natures Way, Fletton Parkway To The Serpentine: Hargate Way, Silver Hill, Hampton Avenue, London Road, The Serpentine and vice versa |
||
The Serpentine as lies between Phorpres Way and Fletton Parkway Roundabout 3 |
To Fletton Parkway Jct 3: London Road, A1(M), Fletton Parkway. Non-Motorway traffic: London Road, Hampton Avenue, Eagle Way, West lake Avenue, Natures Way, Fletton Parkway To Hargate Way: London Road, Hampton Avenue, Eagle Way, Silver Hill |
||
Phorpres Close | No Alternative Route | Road Closure 20.00 to 06.00 |
12/03/2024 |
The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above roads. The alternative route for vehicles affected by this order is detailed in the schedule. The proposed order will come into force on the 26/02/2024 and will continue until the Junction improvements and associated works have been completed or until the 25/02/2024, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between overnight 20:00hrs to 06:00hrs between 26/02/2024 and the 13/03/2024. For further information please contact Milestone on 07354 901835. RC2
The City of Peterborough South Street, Stanground Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-398
The effect of which is to stop any vehicle from proceeding along the road known as South Street, Stanground, in one way from Church Street to Whittlesey Road double roundabout, only. The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above road. The alternative route for vehicles affected by this order is via Whittlesey Road. The proposed order will come into force on the 26/02/2024 and will continue until the Trial Hole and Bridge Investigation works have been completed or until the 25/02/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between 09:30 and 15:00 on the 26/02/2024. For further information please contact Milestone Infrastructure on 07354 901835. RC2
Notice is given that the Council of the City of Peterborough intends in not less than seven days to make an Order pursuant to section 14(1)(a) of the Road Traffic Regulation Act 1984:
The City of Peterborough Star Road Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-400
The effect of which is to stop any vehicle from proceeding along the road known as Star Road, as lies between Glenton Street and Wellington Street. The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above road. The alternative route for vehicles affected by this order is Wellington St, St John’s St, Eastfield Rd Roundabout 39, St John’s St, Vineyard Rd, Bishop’s Rd, Star Rd and vice versa. The proposed order will come into force on the 03/03/2024 and will continue until the Sluice Valve Repacking works have been completed or until the 02/03/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place on the 03/03/2024. For further information please contact Anglian Water on 08457 145145. RC1
The City of Peterborough Frank Perkins Parkway J7 to J5, Peterborough. Temporary 40 mph Speed Restriction Order 2024 Ref: 24-424
The effect of which is to impose a 40 mph speed limit on the road known as the Frank Perkins Parkway J7 to J5 as lies between J7 and J5. The proposed Order will come into operation on 04/03/2024 and will continue until the repair works on Frank Perkins Parkway have been completed or until the 03/09/2024, whichever is the earlier. It is anticipated that the works will be carried out between the 04/03/2024 and the 04/04/2024. For further information please contact Milestone Infrastructure on 08456 043127. SP1
The City of Peterborough Thorpe Road and The Drive, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-432
The effect of which is to stop any vehicle from proceeding along the roads known as Thorpe Road and The Drive as per the schedule below.
The Drive at its junction with Thorpe Road |
Vermont Grove, Thorpe Lea Road and vice versa |
Road Closure | 04/03/2024 to 12/05/2024 |
Thorpe Road as lies between Bourges Boulevard Roundabout 36 (Crescent Bridge Roundabout) and Gables Close |
Bourges Boulevard, Rivergate, Town Bridge, London Road, Oundle Road, Nene Parkway, Longthorpe Parkway, Thorpe Road |
Road Closure Westbound Only |
The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above roads. The alternative routes for vehicles affected by this order is detailed in the schedule. The proposed order will come into force on the 04/03/2024 and will continue until the gas main replacement works have been completed or until the 03/03/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between the 04/03/2024 and the 12/05/2024. For further information please contact Cadent Gas on 01354 659858. RC1
The City of Peterborough Fulbridge Road and Topmoor Way, Peterborough. Temporary Prohibition of Through Traffic Order 2024 Ref: 24-435
The effect of which is to stop any vehicle from proceeding along the roads known as Fulbridge Road and Topmoor Way as shown in the schedule below.
Fulbridge Road as lies between Robert Avenue and A47 |
Fulbridge Road, St Pauls Road, Welland Road, A47 and vice versa |
Road Closure 20:00 to 06:00 |
04/03/2024 to 12/03/2024 |
Fulbridge Road as lies between Marlowe Grove and A47 |
Fulbridge Road, Hallfields Lane, Paston Ridings, Topmoor Way and vice versa |
19/03/2024 to 23/03/2024 |
|
Topmoor Way for its entire length |
Paston Ridings, Hallfields Lane, Fulbridge Road and vice versa |
23/03/2024 to 27/03/2024 |
The Council is satisfied that traffic should be prohibited due to proposed works being executed on the above road. The alternative routes for vehicles affected by this order are detailed in the schedule. The proposed order will come into force on the 04/03/2024 and will continue until the safety barrier replacement works have been completed or until the 03/03/2025, whichever is the earlier. Closure dates will be confirmed locally on site. It is anticipated that the works will take place between the 04/03/2024 and the 27/03/2024.
For further information please contact Milestone on 07354 901835.
RC1 Adrian Chapman, Executive Director, Place and Economy
22/02/2024